Robotic arms that assemble panels on solar farms
Hey HN! We're a YC-backed company building robots that build solar farms. We recently completed the first commercial deployment of our system, and this is one of the first articles about it.
Here's a teaser video we put together too, if you're curious to see some more shots of the system in action: https://www.youtube.com/watch?v=ZZ2fP1Y5Z2E https://www.youtube.com/watch?v=ZZ2fP1Y5Z2E
- IshKebab 2y agoSeems like it assembles individual panels into bigger blocks... But why do that on site? Surely you can do that much much easier in a factory somewhere?
- marcosdumay 2y agoWell, then you'll have to solve how to transport those larger blocks into site.
- abdullahkhalids 2y agoThe sizing of so many large objects is determined by what fits efficiently into a standard shipping container or truck.
- deleted 2y ago[deleted]
- dang 2y agoRelated: Launch HN: Charge Robotics (YC S21) - Robots that build solar farms - https://news.ycombinator.com/item?id=30780455 https://news.ycombinator.com/item?id=30780455 - March 2022 (81 comments)
- philipkglass 2y agoModules for solar farms have been getting larger and heavier, but the maximum size/weight has traditionally been limited by what human workers can heft into place. I'm interested in what the optimum size ends up being when those human limits are removed. What's the most labor intensive part that remains when robots are putting the modules into place on racks? Attaching cables? I would guess that robots still aren't dexterous enough for that.
- justicz 2y agoFor us, we're happy for modules to get quite a bit bigger since the time it takes to build a bay (what we call one assembly of a few modules on a metal tube) is approximately proportional to the number of modules, so bigger modules => fewer modules => faster build times. Our robot arms could handle much larger modules. For traditional human installation, we're already approaching the limit of reasonable module sizes -- today's modules take two people to lift and align.
- hgomersall 2y agoCan you not prefab larger modules from smaller modules off-site?
- Teever 2y agoI would imagine that the next constraint in the size would come from the supply chain, so you'd probably end up seeing panels that are 4'x8' if human liftable weight wasn't a consideration. Perhaps the next size up would be the interior dimensions of a cargo container so they could slide in/out like sticks of gum.
- quickthrowman 2y ago> Modules for solar farms have been getting larger and heavier, but the maximum size/weight has traditionally been limited by what human workers can heft into place. Are there installers that actually use humans to lift solar panels onto racking on solar field projects? I figured everyone was using vacuum pump panel lifters instead of humans these days as it’s much faster and less prone to injury. One example: https://unimove.com/lift/solar-panels/ https://unimove.com/lift/solar-panels/ These can easily be fabbed up by a single person, it’s just some steel and a couple vacuum pumps.
- ghshephard 2y agoI'm trying to find recent Time Lapse videos - here is one from Australia, 2020 - at the time the largest in Western Australia - so at scale. All the panels were hand lifted by one person. https://www.youtube.com/watch?v=uCtFG-hIHdM https://www.youtube.com/watch?v=uCtFG-hIHdM Ahh - better - here is one at scale from a year ago. https://www.youtube.com/watch?v=72UlzbsON4M https://www.youtube.com/watch?v=72UlzbsON4M West Texas: - 200 MW - 1200 Acres - Piles -- 68,350 - Support Piles (Crew does 80-100 piles/day) - Tracker System - 490,150 Solar Modules - 540 watts/module - Crew can install 500 panels a day - These are multi person 2-4 people lifting. - 500 workers on site - doing 6200 panels/day. - (That suggests ~40 person crews if all worker installing panels. Wow - now I see why this is a big deal) - Cables panels -> Inverters - Big Inverter install to to convert to AC - Lots of concrete pouring for substation/Inverter Pad.
- cesarb 2y agoFor comparison, here's a nice video (in Brazilian Portuguese, but should be understandable even if you don't know the language) showing a solar farm being built in the traditional way: https://www.youtube.com/watch?v=_W1nQT7az8c https://www.youtube.com/watch?v=_W1nQT7az8c
- mrlongroots 2y agoThis is really cool! Broadly, I think there's so much potential for computing in construction. If we can model logistics decisions as optimization decisions, we can leverage incredibly efficient solvers to extract efficiencies. The challenge, of course, being the "info pipeline" - integrating machines with construction processes and planning software and orchestrating it all in a way that adds value. If an entire construction plan is modeled, you could also compile it into a staged procurement/shipment plan, and essentially orchestrate the supply chain in sync with the jobsite activities. It'd be cool to have more info on how the process looks like with/without these machines, how rates of specific activities are impacted etc. but a bunch of this stuff is probably proprietary.
- akira2501 2y agoThe challenge is that nothing gets built strictly according to the plan. Solar farms seem easy because there's no foundation, everything is above ground, and there's essentially no finishing involved. This really is the "lowest hanging fruit" of the construction industry.
- Arrath 2y agoThere are foundational elements, those arrays of panels do have to be mounted to the earth somehow after all. I've built solar farms where we drilled thousands of 5-foot deep, 6-inch diameter holes with 1/4" tolerance for the location. Into which pipes were concreted and the long crossbars for the panel arrays were installed. Did the tolerances truly need to be so tight? Probably not, and just set so by a designer somewhere. But the panels do have to line up for tying into conduit that goes to (pad mounted) transformers and distribution equipment, etc.
- akira2501 2y agoSure, but in that case, the alignment really just saves you on conductors, it's not required for the larger structure to operate correctly. The posts aren't meaningfully tied together in any structural way unlike a post and pier "foundation." What I meant was, for something like a building, the plan will describe the invariants of the design, but what it really reveals are all the available variants in achieving that outcome on the actual site. With a solar farm that available variance is actually very small because the overall "plant" has very little additional or emergent structure.
- deleted 2y ago[deleted]
- zer00eyz 2y agoI always go back to GM and its first welding robots. They had to make changes to the construction and engineering process to optimize for those welders (and for them it was slow). I assume that the current install process is fairly "human optimal". How much of that changes with your product to make it "automation" optimal? Were there small changes here for big wins? Or are you still using the same process with complex automation (the GM way), and do you see challenges arising from that?
- Smoosh 2y agoSo often I see the word robot used, when machine would be more appropriate.
- pinkmuffinere 2y agoWhat’s the difference between a machine and a robot? I’ve commonly heard “it’s a robot until it works, then it’s a machine”
- adrian_b 2y agoThere is no generally-agreed definition, but I would use the word "robot" only for machines that have manipulators (i.e. some equivalent of arms with hands; something similar to octopus tentacles or elephant trunks also qualifies as a manipulator). Originally "robot" was used only for humanoids, but the only essential capability that distinguishes robots from earlier machines are the manipulators, so in all other respects they may not resemble humans or animals nowadays.
- pgorczak 2y agoMaybe “an automated thing that moves to do stuff”. Generally there are manipulators and mobile robots like vacuums. An interesting edge case would be a CNC machine which has degrees of freedom similar to a pick and place robot but is seen as a whole static thing with moving parts. Also if the mobile platform transports people it’s usually not called robot.
- justicz 2y ago
- ericd 2y agoThis looks pretty awesome, but any reason you don’t use these in a central location to make foldable preassembled racks, instead of transporting the factory to the site? Seems like you could fold them like an accordion into whatever max size can be carried by a forklift, drop them in place, pull them out to unfold, screw the whole prewired assembly down with ground screws, and plug it into the neighboring assembly? This would probably work best with E/W racking, would go from tightly packed to corrugated. I’m sure there are challenges I’m not considering, but with modules getting insanely cheap, it seems like racking/assembly/inverters are starting to dominate, and scaling up from single modules to full assemblies assembled in factories seems like a good next step. (I’ve been building my own 20kw ground mount array, so I’ve had plenty of time to daydream about something we could’ve just dropped and pulled out)
- deleted 2y ago[deleted]
- justicz 2y agoHey thanks! The trouble with the origami racking approach is that the engineering decisions you make to build a portable, foldable racking system go in some different directions from what makes the best hardware for long-term, large-scale installations. A couple of ways this shows up: 1. making your system rugged to handle extreme weather. These sites need to last 30-40 years without breaking, which pushes you to use pretty heavy + large components. Piles get driven several feet into the ground, so even with unfolding systems you're still probably pile driving. 2. tracking -- adding the complexity to enable rows to rotate to face the sun makes it harder to make the system portable. Basically all large-scale solar getting built is single-axis tracked. 3. module cleaning -- it's important that vehicles can traverse rows to clean dirt off of modules on a regular basis. Having structure that connects the rows together may make this more difficult. None of these are intractable on their own but together they make the approach you describe very difficult.
- ericd 2y agoThanks for going through that! We used aerocompact, with 18” ground screws/anchors (a lot of them), and their engineering plans for our anticipated wind load didn’t even require all possible ground screw spots to be filled, so it seems like piles might not be strictly necessary? With panels getting so much cheaper, is tracking necessary still? Maybe if land is at a premium, but I know the aerocompact commercial deployments don’t support tracking.
- terramars 2y agoi'm down with solar robots, but this is definitely one of those problems that's only a problem because of overly restrictive immigration laws. installing panels is pretty easy, there are tons of people who would be delighted to come to the US and install for $20/hr. source : have a solar engineering firm in Kenya, and have never had problems with panel installation labor (QA is another story).
- __MatrixMan__ 2y agoI haven't used their product, but in a former life I had these guys as a customer: https://raptormaps.com/ https://raptormaps.com/ It seemed like a pretty solid idea re: the QA part.
- dumpHero2 2y agoHow did this become about immigration? A lot of americans would also do it for $20 an hour.
- onlypassingthru 2y agoHave you ever seen a non-hispanic landscaper in the desert southwest metropolitan areas? Me neither. Now try to find ANYBODY willing to work out in the middle of the Mojave or Sonoran deserts. Espero que hables bien español.
- beaeglebeachh 2y agoHispanic!= Immigrants. Much of the southwest was formerly even part of Mexico, many of those people didn't even move in the history of the US.
- onlypassingthru 2y agoTry talking to a landscaper anywhere in the desert southwest and see for yourself. Not the guy who has his name on the truck because there are a few natives who still own the business because inglesa, talk to the guys actually doing the work out in the sun. 100% Hispanic immigrants.
- falcor84 2y agoWhy did you disable the comments on your YouTube teaser?
- bsder 2y ago> In some cases, solar construction companies were turning down projects because they couldn’t find workers. In other cases, workers were commuting for hours to get to sites with no hotels or grocery stores nearby. So ... tired ... of ... this. This is NOT a shortage. This is lack of salary. The oil industry somehow manages just fine to get workers to really out of the way places. Apparently the companies aren't drowning in enough projects to pay more money. Why is that?
- sburl 2y agoThis seems like a great construction robotics application since you have such an empty / controllable site. Did you ever consider teleoperations as well?
- stuaxo 2y agoGreat, this definitely needed. On the domestic side we need go make rooftop solar more efficient to install for countries like the UK, there aren't enough people to do it there either.
- m463 2y ago"It’s possible to install as much as 1 megawatt of solar power in a day, and a project could use multiple systems at once." pretty cool.
- nojvek 2y agoIf we want to grow US economy by making existing humans more productive per capita, then we need cheaper energy per capita, cheaper intelligent robots per capita. Also goes to say we need less NIMBY-ism per capita. We need high speed rail building robots, solar farm building robots, home building robots, healthcare robots. Cheap repairable open robots. Robots that defend us, robots that transport. More robots than humans. More robot companies diverse in their approaches.
- bugbuddy 2y agoPlease reconsider the part “robots that defend us.” There have been many books and movies made about this idea. I don’t think we want it.
- newsclues 2y agoWe can’t be afraid of technology because of movies. Do you not know of all the technology that we enjoy today that had movies and books decrying the dangers?
- bugbuddy 2y agoWell, I would be hard pressed to find an example for the wheels. :)
- ectopasm83 2y agohttps://www.youtube.com/watch?v=hVKgY1ilx0Y https://www.youtube.com/watch?v=hVKgY1ilx0Y https://www.youtube.com/watch?v=Cghg-QyTP_M https://www.youtube.com/watch?v=Cghg-QyTP_M
- bugbuddy 2y agoDon’t count. Wheels have spokes.
- HeatrayEnjoyer 2y ago
- michael1999 2y agoWhat's the turn on capital for a buyer? Like, how many panels does a construction company need to install to pay for your system, and how does that line up to project size?
- lostlogin 2y agoI would like to know this, but it would get complicated fast. The robot presumably doesn’t need many breaks and can go all night. But any outage can’t have someone else sub in.
- Zopieux 2y agoEvery time I see news of a robotics company reportedly disrupting an industry, all I can see is the very large amount of prep work using conventional techniques (read: humans in excavators) to prepare the terrain for the (usually very strict) constraints of the robot being publicized. If the new robot can install panels very quickly, but you need 3 weeks to flatten the field to unreasonable tolerances or install tons of dedicated framing and supports for it to function, your efficiency gains or cost saving numbers will take a hit. Those considerations are unsexy and boring, they put a shade to the press release, yet are very important to assess the value of the innovation. I'll trust a company when they start being transparent about these aspects.
- iancmceachern 2y agoAnother example: These folks built a robotic restaurant. It took the form of a food truck in a shipping container, and they put it in our little food truck area here. I then saw for the next 3 months, engineers frantically running around a semi operational thing, until they took it away because it didn't work. The investors could have just invested in some food trucks, and made money.
- Zopieux 2y agoYeah. The most ridiculous example I think are the "3d printed" mud houses. Just look at the amount of support infrastructure. What a joke.
- lardo 2y agoThere already exists tight constraints on field grade. The mounting hardware has limits to how much one section can differ from the next. You can imagine that you need each horizontal beam some maximum number of degrees from parallel, and the vertical posts will only have so much extra length to account for variation.
- sp332 2y agoIn the last photo in the article, why are the panels at such a steep angle and pointing away from the sun?
- justicz 2y ago...we may have turned the rows for a photo-op :)
- exabrial 2y agoMy good buddy, Union carpenter, laughs at Silicon Valley hipsters trying to replace his industry with robots. One of his greatest quotes is ‘We already have 3d printers for buildings, they’re called cranes’. His advice every time I send him one these articles usually rounds to: ‘If these smart@$$ %|~>heads would spend a couple of weeks on the job actually sweating and doing some real labor, they’d realize the problem isn’t lifting things, it’s organizing it.’
- XorNot 2y agoI mean he can laugh but then one day it'll have happened. For one thing, he's already identified but failed to realise the problem: organising labour to be on site and ready to work is expensive and tricky. But when there's less labour and more machines, you're now only paying opportunity cost, not direct costs of people turning up and being unable to complete the job because it's not ready to go yet. And unlike people, the quantity of capable machinery can constantly increase and thus the cost per unit decrease. Eventually the machine is cheap enough to leave on site even if something else delays it.
- foota 2y agoWould it ever make sense to pour foundations of some kind rather than put in poles? I'm thinking maybe a trench making machine could be used and concrete poured into the trench, and then the solar panels could be secured by putting a wide base into the concrete instead of a pole?
- sandworm101 2y agoThis thing mounts panels and screws them in. So? That is maybe 1% of the needed labor, and could be more easily optimized through better connectors (snap-on or drop-in panels). Show me the robot that can survey and install foundation posts, wire up the panels, or clear brush and open the pallets of equipment during initial setup. The robot revolution is coming, but this isn't it.
- imtringued 2y agoDo this on the moon and you're going to have a multi billion dollar company.
- singularity2001 2y agoWhat's the name of the solar company that just lays down solar panels flat on the ground? Ersolar? That's the future of solar Farms. panels are just cheap enough to cover the ground flatly without complicated buildings.