Why software projects take longer than you think: a statistical model (2019)
- menotyou 3y agoI think the truth is much more simple: - Did you ever see any project finished ahead of time? - How many project did you see where scope was shrinking during execution vs. expanding?
- samsquire 3y agoStart from an empty file and write to an imaginary API or pseudocode what you actually want to do and coding is easy and fast! I think the high level imaginary API/pseudocode of any system is straightforward and fast when you start from scratch. (Because you're not focused on detail and just intent) But when you start from an existing codebase, existing infrastructure, existing APIs, it slows to molasses. You've got to understand and have a mental model of ALL OF THAT before you can complete your intent. I think this is why software takes longer than expected. Your mental model has to be accurate, and there is always more to learn. How do you solve the problem? I'm an advocate and trying to design what I call "commutative programming", which is another way of saying that the behaviour is the product of every statement about the behaviour that is desired, not an explicit instruction of what to do next which is what modern programming is and it is slow and tedious and doesn't compose. In this dream, if you want to change behaviour, you just add statements. Programming is additive! Not edit sourcecode or try to find out where to insert your lines of code or tweak existing lines. Let the computer tell you about conflicting requirements or missing criteria. We need query engines and cost based optimisers for behaviour. Imagine taking lots of files that are simple "writing to an imaginary API" - that's your intent specification. You just need to merge them together and your system is finished. I started work on a commutative GUI https://github.com/samsquire/additive-guis https://github.com/samsquire/additive-guis but I'm also thinking from time to time about commutative code where we define refinements to desired behaviour and the computer behaviour query engine or rule engine generates the code or configuration that exhibits this behaviour. (A bit like Kubernetes for behaviour.) In the future: we don't get LLMs to code for us, but we have highly expressive semantic vector spaces that map to architectural relationships and meaning of behaviour, and changing the architecture of a system to support new behaviour is a matter of changing the serialisation of semantic vectors via the prompt.
- tcard 3y agoInteresting perspective. It reminds me of Eve [1], which was all the rage over here a few years ago. [1] https://witheve.com/ https://witheve.com/
- hcarvalhoalves 3y ago> way of saying that the behaviour is the product of every statement about the behaviour that is desired, not an explicit instruction of what to do next I believe you'll enjoy reading "Notes on the Synthesis of Form" by Christopher Alexander [1]. There are many ideas in it, but at the later chapters the author proposes a system for solving design problems as a large graph of interacting requirements, where smaller sub-graphs are (hopefully reusable) components solving a smaller set of requirements. Sounds similar to this idea of yours, just with a key difference in that the author sees it as a two-pass solution: first you "carve" out your solution by establishing a context boundary, and then do you "fill" it with an implementation - such that the solution is the minimal implementation that fits the context, and not anymore. After reading the book, I have also adopted a similar approach (but with less formalism) to gather requirements for projects in the past. I have thought about developing the ideas of the book further, if you find this subject interesting we can discuss (I can ping your profile's email). I'm certainly interested in hearing more of your own ideas, as it seems to intersect. [1] Same author of "A Pattern Language", that inspired the design patterns concept in software
- samsquire 3y agoThanks a lot for your comment! I once read "The Timeless Way of Building" by Christopher Alexander but not "A Pattern Language" I actually owned that book "Notes on the Synthesis of Form" but I never read it, I gave all my books away. Maybe I'll have to get it after I finish reading "Database System Concepts" which I am slow to read. I would like to hear YOUR ideas too! Send me an email, I hope you shall tell me your ideas and thoughts and we can bounce off eachother. Please (and anybody else reading) do ping me - I love reading other people's thoughts and encouraging others. The idea of using graphs to solve problems and breaking them into re-useable patterns resonates with me, I didn't realise that particular book had that in it. One of my programming projects was using the A* algorithm to do code generation in Python ( https://replit.com/@Chronological/SlidingPuzzle3 https://replit.com/@Chronological/SlidingPuzzle3 ) based on generating graphs of potential instructions. > Sounds similar to this idea of yours, just with a key difference in that the author sees it as a two-pass solution: first you "carve" out your solution by establishing a context boundary, and then do you "fill" it with an implementation - such that the solution is the minimal implementation that fits the context, and not anymore. Thanks for sharing that. It reminds me of Java interfaces but more powerful.
- spion 3y agoI've been advocating for 3-point estimation for quite a while. [1] Unfortunately it doesn't happen very often (mainly because tooling support for this has been missing in popular trackers such as Jira). In situations where I was the decisionmaker on the methodology I've had excellent success with it. (using about 90%-95% confidence interval was typically right on the mark) [1]: https://en.wikipedia.org/wiki/Three-point_estimation https://en.wikipedia.org/wiki/Three-point_estimation
- steveBK123 3y agoI think that's a pretty smart model - best/worst/most likely. One thing I found lacking in kabuki agile theatre was that we were ABSOLUTELY NOT supposed to "get into the weeds" in meetings where we talked estimates. But how does one uncover the best/worst/most likely without doing so? You can spend 20min writing the most beautiful Acceptance Criteria but if you don't get a bit into detail on what the user actually wants it's all for naught. It could be way simpler (hey what if I just did X) or way more complex (oh well now that you mention it..), etc. Typically it was engineering manager & engineers sitting in a room discussing requirements with each other. What could go wrong obviously? lol.
- k__ 3y agoThing is, you can always put in "never" as worst case.
- sanitycheck 3y agoThis is good, but I think the "most likely estimate" is going to be misleading a lot of the time. I don't have numbers to back it up, but I have a strong sense that the actual time to completion tends to be either at the quick end or the slow end of the estimation range, and only rarely somewhere in the middle. A bactrian, not a dromedary. If we hit the problems we were anticipating we might then the whole thing can take ages, but if we don't hit them it's pretty quick. Best and worst case are going to fairly predictable in advance (the latter improving a lot with experience) so I'd stick with just those personally.
- magicalhippo 3y ago
- roenxi 3y agoThis model is working to identify the Inspection Paradox [0] - most time is spent on doing tasks that take a long time to do. Combine that with high variance, and one task will blow out and a project will be spent working on something that is much harder than people thought, and that the estimate process didn't see coming. My interpretation here is software engineers are better at estimating tasks than I thought. The next step is analysing tasks being performed in serial to show how many sub-tasks a project can have before the estimates are effectively meaningless / likely to blow out an unpredictable amount. I bet it turns out to be about a sprint's worth of work. Real people have a knack for feeling out those sort of tipping points empirically. [0] https://en.wikipedia.org/wiki/Inspection_paradox#Inspection_paradox https://en.wikipedia.org/wiki/Inspection_paradox#Inspection_...
- deleted 3y ago[deleted]
- steveBK123 3y agoAnother factor here is in a meeting-heavy agile environment, many engineers can't even give a good forward estimate of the number of "in the zone" hours they will have in the coming week. Will I be on 0 outage calls or 5? Doesn't matter if I am on pager duty rotation or not.. Will I get pulled into 3 calls this afternoon or 0? Is my boss gonna come bother me with some urgent non-ticket task tomorrow morning? Etc. I'm currently in a no-jira, no-meeting, get-it-done environment and I find myself getting tremendous amounts of work done for the first time in nearly a decade. I would not have estimated my ability to get 1/4 of what I have gotten done, done. My last 2 jobs were basically the opposite. Everything took 4x as long as it should..
- deleted 3y ago[deleted]
- intelVISA 3y ago> no-jira, no-meeting, get-it-done environment Best env, but sadly a bit rare? I used to select for shops like that, no wonder lay-offs are scary if you've been trapped in meetings instead of shipping.
- steveBK123 3y agoI seem to manage getting into these types of roles 30% of the time, which is pretty nice. Granted I am working a zillion hours right now, but I'm less stressed than when I was working 9-6 but in 5 hours/day of zoom. Just feels like I am exercising my mastery vs fighting against inertia.
- pydry 3y agoSomething similar happened to me too. I switched from working 4 hours a day to 9 in a new job and my burnout healed. 4 hours of bullshitting, meetings, an unclear vision, constantly being blocked, anxiety over a lack of productivity was swapped with 9 hours of clear aims, clear goals and hard work. It was still not sustainable but it felt way better.
- pif 3y agoWhat I find ironic is that everyone in the industry knows that estimating is very hard, thus estimations are nearly useless, yet everyone insists on the importance of planning and on basing such planning on void estimates. Nobody has yet had the balls to state the obvious: we have to learn to work without estimations.
- karles 3y agoBecause no customer wants to write a blank check. If you don't know if its 500 or 5000 hours - you're simply not buying the product.
- ptrhvns 3y agoI think the fundamental misunderstanding is that we aren’t building a product. We are doing research and development. We are figuring out how to build something novel, otherwise the customer could just go out and buy it already. Once we’re done with discovery, the computer builds it. So, the customer is like any other who is paying for research and development. It’s not a blank check, but they should go into it without the expectation that something new will be discovered on some accurate schedule.
- z3ugma 3y agoThis is hubris of the field of software engineering. The no-code market and the existence of tools as old as MS Access prove that there are software projects for which a better analogy is not R&D, but construction. I do note that construction projects are also not good at estimating, but it's folly to suggest that at some level we are not _manufacturing_ rather than _developing_ a widget.
- sokka_h2otribe 3y agoConstruction is a bespoke non-factory manufacturing process. If you extend the metaphor: Estimating large projects is a big construction projects. Those tend to be large buildings and relatively on schedule. Estimating small projects with small teams is bespoke. And more likely to go off schedule when the plumbers can't time well with the electrical services, i.e, you have a dependency on another teams API or something, similarly to how software struggles in small team open ended scope projects with unknowns. But a tightly scoped single-trade software project won't struggle just like construction. In end, I agree with you that construction is a decent metaphor. But construction is very far from manufacturing a widget, as it's a bespoke manufacturing process with ample site specific constraints
- bytephilosopher 3y agoAre there simple tools around to help reaching better estimates?
- jll29 3y agoI know a plan is good when my bottom-up estimates (padded with a buffer for unforeseen contingencies) align with my top-down gut instinct of how long a project of a certain complexity "should take". As an experienced professional, one often compares with past projects and looks at the duration of a similar one - not necessarily regarding content but complexity. (I also conduct research on methodology, e.g. https://arxiv.org/abs/2201.07725 https://arxiv.org/abs/2201.07725 / https://dl.acm.org/doi/abs/10.1007/978-3-031-08473-7_48 https://dl.acm.org/doi/abs/10.1007/978-3-031-08473-7_48 .)
- vbezhenar 3y agoI write code for 15 years and I still have no idea how to do any estimations. All my estimations are off by 2-200 times. Basically they’re useless. I write code until I’m happy with it. Sometimes I need to rewrite code 5 times before I’m satisfied. Sometimes I have extremely bad mood and can’t do anything creative at all, so even expecting me to work a hour tomorrow is not reliable. Or may be I’ll be in perfect mood and conditions and will spend weekends writing perfect code for 30 hours. I envy people who can work on schedule. I’m so terrible on that.
- rewmie 3y ago> All my estimations are off by 2-200 times. Basically they’re useless. I know, hyperboles and all, but if your initial estimate for a task is 1 week but you end up requiring 4 years to deliver it then something went terribly wrong, and asking your for estimates ain't it. Even story points scope tasks with granularities that range different orders of magnitude for this reason. One day, one week, epic/spike. It's ok if one day means 4 days, or one week means two. If one day turns to 3 years then the developer was completely clueless and unfit to continue working on the project.
- renegade-otter 3y agoIn one of the Agile training courses I took we were taught the concept of "horizon of predictability". The base one is two weeks. Within two weeks you more or less can estimate accurately. Beyond the two weeks, the estimates become pretty much useless. "Three months" is not an estimate. It just can't be one in good faith.
- kayodelycaon 3y agoI love those training courses and their narrow view of the world. I can be accurate with 3-month and 6-month projects. This is because long-term projects give me the space to allocate specific kinds of mental energy and attention efficiently and have steady progress. Short-term projects, I never know if I have the right kind of energy or attention to move forward. I often end up blocked by my brain, making my two week estimates unreliable.
- vjaswal 3y agoWe (or at least I) may base our estimates on the happy-path. That is, I can see how to solve a problem in the common case. But as I code, I encounter the myriad of error cases, exceptions to the common problems, and especially the interactions of all these. Then add in performance considerations and the complexity can multiply quickly. The long-tail of those errors and exceptions can be very time-consuming to solve, so the mean is likely to be way off. It's obviously much easier to estimate when you're experienced with a problem space. This should mean that you know how to solve a particular problem as well as the likely exceptions (non happy-path) you'll encounter. If you're experienced with the domain, you can fit the relevant partial solutions in your head and more accurately judge what could go wrong with your code. But more generally I think this is similar to solving problems in other domains as well, such as architecture, building a car, or anything with many moving parts. These domains do not usually have loosely coupled sub systems.
- sokoloff 3y agoCars and buildings are probably more loosely coupled than most HN readers imagine. Up through the engine in the 1995 Mustang (I think that was the cutoff), the Ford small block engine line would all bolt into Mustangs all the way back to 1965. I've got a 1989 block, a modern 5-speed transmission with overdrive, hydraulic clutch, disk brakes, dual circuit braking, limited slip differential, and a semi-modern radio in my 1965. All of those were either direct bolt-on or straightforward upgrades with minimal field engineering needed. Many of the VW and Audi engines also have common engine/trans mounts and interchange across years and brands. You can often bolt heavier duty suspension or brake packages onto base model cars/trucks. "Parts bin engineering" is a phrase to search on to learn more. It's done aftermarket, but it's also done by the manufacturers. There's a similar story in the mechanical engineering for buildings. Sure, some architectural choices will make it harder or easier, but most buildings can be retrofitted system-by-system over the decades a building is in service. Part of that is to allow configuration pre-sale, but a lot of it is just "it's too damn complex if everything affects everything else", which is not that different from software.
- bonoboTP 3y agoAll this smokes and mirrors, when the reality is: if you gave accurate estimates, you'd get reprimanded, not get the project approved, etc. Same reason that infrastructure project go over budget. The way anything actually gets done is by initially being overly optimistic, ignoring potential future problems, getting the project approved, then lock it in via sunk costs, now as problems turn up, you can claim it could never had been foreseen, it's an impossibly hard problem bla bla. But best to bail from the vicinity of the project once reality starts to manifest itself. By that time you should be on the next project perhaps at the next company again promising the stars.
- jcarrano 3y agoSome questions are asked expecting a particular answer, rather than the truth. "How long is this going to take" is one of those.
- pixl97 3y agoIf you get to the destination too quickly someone will make your destination farther away and harder to reach.
- HeyLaughingBoy 3y agoThat's when you respond with "when do you need it done?" And you can probably work together to see what can realistically be completed by whatever date they had in mind.
- rewmie 3y ago> The way anything actually gets done is by initially being overly optimistic (...) I don't think so. At most, planners plan for the happy path and then add slack to help them manage expectations. Sometimes stuff emerges and projects adapt. Sometimes your slack covers it, sometimes it doesn't and you get delays and extra costs. That's a Project Manager's dish of the day. > then lock it in via sunk costs You're presuming that clients are oblivious to issues of delays and cost overruns, and the negotiation stages don't include accountability specifications.
- 3y ago
- fzeindl 3y agoI have written quite a bit about this in my blogpost https://www.fabianzeindl.com/posts/the-codequality-pyramid https://www.fabianzeindl.com/posts/the-codequality-pyramid Also check out this study which links software quality to deviations in estimation: https://dl.acm.org/doi/10.1145/3524843.3528091 https://dl.acm.org/doi/10.1145/3524843.3528091
- sideproject 3y agoI'm genuinely looking for a "calm" company. Is there such a thing? I have a few anecdotal stories of companies being absolutely chaotic (my current one included). I don't know where to point fingers to. I could start at pointing myself. Customers demanding custom features. Execs and sales people asking for unreasonable estimates. Engineers not feeling safe enough to say "no" but have to make something work, introducing tech debts. Engineers picking technology tools without much research, because there is no time, which increases complexity. People leaving, and then new people can't understand everything holistically. All of these factors combined into one gigantic bowl of mess.
- heywire 3y agoGo find a well established company where you can work on an existing product. I work on a legacy point of sale product that started life in the 80’s and is still powering a good chunk of commerce around the world. I work on a small yet efficient team who customize the product for retailers. It is all about the team you’re on though. My company is also releasing all kinds of new products and services. I doubt anyone would describe working on those teams as calm.
- jrumbut 3y agoWhat you're looking for exists in the government and large universities.
- magicalhippo 3y agoDepends on what you mean by calm. I work as a developer for a company that sell a somewhat niche B2B software that integrates with a lot of customer systems. However we got several large, well-known companies that rely on our products for their daily operation (and a ton of smaller ones). We got a lot of stuff to do, between new customers pouring in and gov't changing their systems with little warning[1] and such. However we also don't have most of the other stuff you talk about. Sales ask for estimates, but if our provided estimates don't work for the client, say because the contract with our competitor is due in a month, then they'll work with us to try to find some way of making it work rather than force it through. There's a lot of freedom with responsibility, so sure for low-impact stuff a developer might try some new tech to learn. However for larger shifts it'll have to be discussed in the dev group, especially if it impacts support. We do have a mature codebase so some tech dept is inevitable, but we have it as a goal to try to improve those things if we need to work on a particularly bad area of the code. As for people leaving, in the years I've been here there's been a very stable group. So stable our customers ask us how their systems work that we integrate with, as they have much higher churn. I don't think we're particularly unique though. But we're a relatively small company with a name that you can't flash on a CV, and at first glance our niche might sound boring. [1]: "yea we redesigned our API, we will be doing a hard cut-over in a couple of months"
- GoToRO 3y agoBecause managers already "know" how long it will take, based on how little budget they have, and they get very upset on anybody who contradicts them.
- sam_goody 3y agoHofstadter's Law: It always takes longer than you expect, even when you take into account Hofstadter's Law.[1] The above universal constant was not taken into account by the article. (I mean, edge case that are impossible to complete exist and are annoying, but mathematically they are a kludge. Hofstadter already explained why it takes so long. ;) [1]: https://en.wikipedia.org/wiki/Hofstadter%27s_law https://en.wikipedia.org/wiki/Hofstadter%27s_law
- ramses0 3y agoConversely: “chicken nugget” estimation. Traditional agile suggests “sizing each task” (work estimated to be less than one sprint). I’ve found that simply “counting each task” is more effective... instead of trying to estimate the difference in sizes, it's easier and more accurate to try to divide the work into similarly sized chunks. There may be "the usual" variation around delivery pace, but at the end it all averages out. Usually 5-10 chicken-nuggets-per-sprint (or 10-20 or whatever your pace is) gives you the "fine grained" velocity or pace that is useful for getting rough estimates in the medium-term. Extraordinarily large "chicken nuggets" become clearly visible because they "take too long" and that's a conversation with the task owner about trying to keep sizing down, or a clue to break them down or add more people (and consequently- more tasks/stories). For overall project size estimation, you can/should have more S/M/L/XL concepts, with effectively back-testing of estimated size to task breakdown count, or be able to state "in the last quarter, this team delivered 2XL, 4L, 3M, 8S". Who knows the true size differential between the 17 delivered (well, maybe if you do further breakdown, and simple task counts you can...), but it's a starting point. Team size may change, focus may vary, vacation varies, amount of non-productive (maintenance, planning, migration, compliance) work may change, but at least it starts giving you a starting point. Finally, recognizing that variance should narrow over time. Driving from SF-to-NY may have an initial estimate of "1234", but if you get to Iowa and you're at 800, then you have a much better chance/estimate that the remainder will be another ~800. Your variance should be smaller because you're estimating a smaller sized item (only half the work), and you're estimating (nay- duplicating!) actual observed delivery pace. TL-DR: don't size stories, do size "epics/features", consistently track delivery, backtest based on previous data, refine estimates as you get closer, be able to estimate when you're "past" the 50% mark
- commandlinefan 3y agoThis kind of cheerleading is a big hit with the people who consume estimates... not so much with the slobs stuck producing them.
- ramses0 3y agoThe slobs stuck producing them (aka: myself) then break down a project into: Project => Area(epic/feature) @ T-Shirt Size => ...you're done... If you can backtest/backport simply the COUNT of stories associated with enough epic/feature sizes, then you can forward-predict an arbitrary new "@ SIZE" to determine an approximate story-count. Inputs: XL @ [ 25 stories, 33 stories, 52 stories, ...etc... ] => Mean/Median/StdDev L @ [ 20 stories, 15 stories, 18 stories, ...etc... ] => Mean/Median/StdDev ...etc... ...basically "the slobs producing estimates" are on the hook _MOSTLY_ and _ONLY_ for accurately accounting/tracking/submitting _CURRENT_ work (ie: put your stories in the sprint/board/backlog). The only other responsibility is being _CONSISTENT_ on submitting and tracking mostly "similar sized items" instead of "wildly varying sized items of indeterminate complexity. If there are "large and wild" areas, they should be bumped up and "promoted" to an epic/feature rather than tracked as a sub-task on an existing epic/feature (talk to your manager/product-owner ;-). It's relatively straightforward to maintain that "story hierarchy" of "Project => Feature/Epic => Story/Task". It's relatively straightforward to estimate Feature/Epic sizes (S/M/L/XL, with extra attention or avoidance of L/XL, strictly because there tends to be more variation on those sizes). With relatively straightforward math tracking backwards four quarters (how many stories in total were closed by this team?), breaking down a "new project" or "new work" becomes more an exercise in "is this big or small?" rather than "what precise date or size is this particular piece of work." For a high confidence interval, commit to _LESS_ Projects/Features than you'd done before (and you have StdDev to guide you on the probable upper and lower bounds), other than that, just prioritize at the Project/Feature level to get the most important or most valuable work scheduled ASAP.
- amelius 3y agoCan we train a DL model to predict the duration/outcome of software projects?
- d3ckard 3y agoSoftware projects take longer than expected because every single time it turns out what actually gets build is nothing like what was originally planned. It’s as simple as that.
- taeric 3y agoI have two simple parameters I use to apply to all estimates. How many people are involved? And how many times has each person done exactly this thing before? The more people involved, the more invisible work there is. Not just meetings, but handoffs and general coordination. And things are only predictable if they are done to the point of being known things. Rehearsed activities are known activities. Even if you shake up a part of it, people that have rehearsed are more capable of dealing with the shake ups and keeping things moving.
- gilbetron 3y agoMy favorite paper on this matter is: https://www.researchgate.net/publication/247925262_Large_Limits_to_Software_Estimation https://www.researchgate.net/publication/247925262_Large_Lim... A crude tldr is: writing software is solving a math problem and time estimating how long it will take to solve a math problem has an infinite error bar.
- greenie_beans 3y agothis blog made me realize that i don't think i'll ever pursue deep knowledge in stats. i find it boring, personally. thankful for the folks who find it interesting.
- revskill 3y agoBecause most of leaders/architects are bad.
- dimal 3y ago> I have two methods for estimating project size: > (a) break things down into subprojects, estimate them, add it up > (b) gut feeling estimate based on how nervous i feel about unexpected risks > So far (b) is vastly more accurate for any project more than a few weeks Here lies one of the main problems with “estimates”. They don’t capture a confidence interval. You can only give one number (and it’s usually story points, not real time). “That’s a five point story”. How confident are you in that assessment? How many unknowns are buried in there? So, a five point estimate that’s arrived at after careful consideration has the same weight as one given off the cuff with no investigation at all. Of course estimates go wildly wrong.
- AssertErNullNPE 3y agoManagement: We've got a great new project that has all the features that our users have been asking for. We need it done as fast possible, it's the number one priority. How fast can we get it done? Engineers: For all of it? At least a year, probably more. Even a subset of those features will take six months, minimum. Management: That's too long. You can have all the resources you want, we need to have it done in 90 days. Engineers: That cannot be done. No amount of effort or engineers will get it done in 90 days. Management: It will be done in 90 days. 180 days later Management: Why are so many of our projects late?
- markhalonen 3y agoRelated project of mine is https://uncertain.io/ https://uncertain.io/ -- I have no statistics background but this is a caveman chart drawing tool that I thought made sense
- noveltyaccount 3y agoOne of my favorite techniques is to estimate the average and, critically, "the worst case if everything that can go wrong does go wrong," and plan on the range. It's an honest approach, albeit more difficult to plan around.
- pmontra 3y agoIt's not only software. Ask to masons how long it will take to perform some significant multiday or multiweek task. They will complete it with as much delay and variance as a comparable software project.
- rnburn 3y ago> "A reasonable model for the “blowup factor” (actual time divided by estimated time) would be something like a log-normal distribution. Research has shown a power-law distribution to be a better fit. See "The Empirical Reality of IT Project Cost Overruns: Discovering a Power-Law Distribution" https://papers.ssrn.com/sol3/papers.cfm?abstract_id=4204819 https://papers.ssrn.com/sol3/papers.cfm?abstract_id=4204819
- kelseyfrog 3y ago> Decent fit, in my opinion! Why wouldn't running an Anderson–Darling test answer that question?
- egberts1 3y agoSoftware engineering down to at most 60-lines per function goes a very long way to knocking down the fluctuations of project management by the most. Largest I have done is a 120,000 code line project to within two months of missing its original project deadline; of course, you'd need some block time just to do the planning, architecturing, and with existing manpower. Most fluctuations are geared toward the unit and integration tests coding and making it "work". This is what I have been doing to nail any project planning to a promotional-level degree.
- azornathogron 3y agoThis seems pretty reasonable to me. Maybe some of the details are wrong, I don't know. But my big question from this article is... why isn't this a well known aspect of project planning, scheduling, and software engineering? It's not even specific to software really - I mean it's possible that software tasks have higher variance than others but I'd be surprised if task variance is irrelevant for scheduling non-software projects. Is it really the case that no one has applied mathematical modelling to the problem of project planning, scheduling and estimation before? Do the ideas in this blog post represent the core of a new avenue of research? Seems unlikely. So how come this, or something like it, wasn't taught as a basic and critical part of project planning, in the same class that taught me the term "Gantt chart"?
- Wicher 3y agoI wonder why people are so focused om probability distributions that look like one peak sided by two tails. There's another way to look at it. For project estimations I've made people give up on the whole fiction of estimates by simply confronting them with the fact that maybe it's going to be very easy (eg, there's an API for it already, or there's a nice library), or maybe it'll be quite hard (eg, it may require writing a sqlite extension, or using multipath TCP, or something else you haven't done before). That's a probability cost landscape with two peaks! And the number you get by interpolating between the peaks will be the most wrong. Makes some people's heads explode, because they want to slot a single number into a field, and you're just not giving it. Some others will see the light and leave you to your explorations, after which you'll sync with them on your findings and where to go from there.
- jjk166 3y agoThis is a simple project, it shouldn't take nearly that long. Let's set the deadline a little earlier and leave the rest as buffer. This project is ahead of schedule, so you're not going to need the buffer, we'll reallocate resources for that time. The project is on schedule, let's move up the deadline a little just so we have a bit of buffer at the end. This project is slightly behind schedule, let's schedule a daily hour long meeting to go over everything to get things back on schedule. The project is further behind schedule, how about you redo a major part of the project to try a different approach that will hopefully be sufficiently faster that you'll not only recover the cost of the reimplementation but also get back onto the original schedule. The project has fallen even further behind schedule, and other things are starting to pile up, we need to pull some resources away to deal with them. The project is ridiculously far behind schedule, people are losing faith in your ability to deliver, you need to get back on schedule before they'll approve more resources for this project. The project has fallen too far behind schedule, we're pulling the plug. I've scheduled a lengthy post-mortem meeting so we have plenty of time to go over how you failed to bring this project to completion so you will learn from your mistakes.
- magicink81 3y agoHas anyone tried the Shape Up method by Basecamp? Their concept of “fixed time, variable scope” seems like it might break the Gordion Knot of software estimation challenges. Their book is available for free online, here's a link to the chapter "Estimates don’t show uncertainty " https://basecamp.com/shapeup/3.4-chapter-13#estimates-dont-show-uncertainty https://basecamp.com/shapeup/3.4-chapter-13#estimates-dont-s...
- awinter-py 3y agoimposing uncertainty on task estimates is a natural way to push back on management pressure to low-ball estimates if everything has a potential 2x blowup, you monte carlo all the tasks to produce a distribution of finish dates, not a single 100% delivery date institutions naturally push risk away from political power, so mostly this uncertainty is applied to line workers by managers. but senior managers have an incentive to push uncertainty to middle managers, not to line workers. uncertainty is a management trick to do this.
- zackmorris 3y agoThis is great, and reminds me of estimating random walks and stochastic processes. Basically, the time estimates for uncorrelated steps can be added together, but if there's correlation then the times should be multiplied. Because a change in one step can require a rewrite of one or more of the other steps. Which means that a 3 step process with average step time t can take t * 3! (factorial) units of time instead of t * 3. Also it might have been exponential instead of factorial, I wish I could remember.
- john_the_writer 3y agoI had one project where I estimated and gave a "project price" based on that. Mid way through (right after I wired up the payment provider) the client found out they were not approved to use that provider. So now I had to delete a weeks worth of code and start over. After the change I sent a revised bill, and the client ghosted me. Specs change, but people don't understand. If you have a wood framed house and mid way you decided it should be metal framing it changes the price.
- mikewarot 3y agoIt's my observation that the primary obstacle to software completion is specification and feature drift, not estimation. The reason VB6 and Delphi for Windows were such great tools isn't because it eliminated the need for programmers, nor made programming that much faster... it's because those systems were comprehensible to domain experts, who could rig together something that actually worked, albeit in an unpolished and buggy state, skipping a cycle or two of prototype, requirements mismatch, adjustment, etc. This gave the programmers an executable specification they could refactor and bug fix and polish up a bit. (And document.... you should always write good documentation) Backstory: My first major software project was writing an inspection system that utilized HP handheld computers, and I was able to crank out a prototype in about 2 months. The client didn't like the hardware (an HP box running basic with lots of "smart buttons"), and chose a different vendor to try again (after he did his own hardware testing and reviews) My second major software project was the same system via the different vendor... and my estimate was about 2 months... it took 3 months (one week was away at Norand, the vendor of the new rugged handhelds, learning PL/N). There was a final month tweaking UI design, etc. and user testing. (Back in the days of MS-DOS, code in Turbo Pascal on the PC, and PL/N on the handheld) This included building a set of screen based editing libraries to allow forms based CRUD, customizing questions directly by the customer, the ability to flow through questions, etc. It was a greenfield project. The client loved it, we met all the specs that were agreed upon, but it was totally unusable in practice. We made a deal to sell the system to 10 more locations, but would spend all the time required for me and the customer to work together and ruggedize/customize it for a better fit. That took a year. Everyone was happy, and it got integrated into some other products over time. Then Windows and networks showed up, and the cost of handhelds fell like a stone. I moved into IT administration.
- przybytniewski 3y agoEstimates != 100% project time spent. I'd say the main issue is misunderstanding of concept we are planning between business and tech people. Those groups think so differentely. We use Planning Poker tool - https://scrumhub.it/ https://scrumhub.it/ for each user story, but still there area projects unestimated with strongly extended timeline compared to initial estimates. But on the other hands mostly it happens when business add new features, change requirements and the wheel comes full circle, we do retro and it is what it is :)