Y
HN Search
Hacker News Search
new
|
comments
|
top
|
jobs
windchick
searching PlanetScale…
1.
▲
2.
▲
3.
▲
4.
▲
5.
▲
6.
▲
3 ms
·
1.
▲
by
windchick
10y ago
They imply 45 cap factor with the 1,000,000 MWh which is expected for Scurry Co and the newer turbines. 1000000/(253*8760) ...rounded ignoring leap year.
2.
▲
by
windchick
10y ago
We are seeing capacity factors well over 45% in Panhandle now. ERCOT rated the various windy areas of the state back in 2006. Scurry Co. was 10th or 14th if I remember correctly. Not as high cap fac as Amarillo and other areas north of Lub
3.
▲
by
windchick
10y ago
There will be a few hour lull after Texas solar goes dark and before night wind kicks in. In Texas, all of our wind is night peaking with the Gulf Coast having a significantly better curve for servicing ERCOT day load. So storage will pla
4.
▲
by
windchick
10y ago
T Boone was too far ahead of the transmission infrastructure with his plan. The SPP lines were not capable of moving much wind (pre ITP build-out) and the ERCOT CREZ plans were just a twinkle in our eyes at the time. We came up with ERCO