3 ms·
They imply 45 cap factor with the 1,000,000 MWh which is expected for Scurry Co and the newer turbines. 1000000/(253*8760) ...rounded ignoring leap year.
by windchick 10y ago
They imply 45 cap factor with the 1,000,000 MWh which is expected for Scurry Co and the newer turbines. 1000000/(253*8760) ...rounded ignoring leap year.