Spain is about to face the challenge of a "black start"
- bigbacaloa 2y ago[dead]
- matkoniecz 2y agoBut according to production data it has never dropped to zero? Why it would be a black start? It dropped from about 32GW to about 8GW source: https://transparency.entsoe.eu/generation/r2/actualGenerationPerProductionType/show?name=&defaultValue=false&viewType=GRAPH&areaType=BZN&atch=false&datepicker-day-offset-select-dv-date-from_input=D&dateTime.dateTime=28.04.2025%2000:00|CET%7CDAYTIMERANGE&dateTime.endDateTime=28.04.2025%2000:00|CET%7CDAYTIMERANGE&area.values=CTY%7C10YES-REE------0!BZN%7C10YES-REE------0&productionType.values=B01&productionType.values=B02&productionType.values=B03&productionType.values=B04&productionType.values=B05&productionType.values=B06&productionType.values=B07&productionType.values=B08&productionType.values=B09&productionType.values=B10&productionType.values=B11&productionType.values=B12&productionType.values=B13&productionType.values=B14&productionType.values=B20&productionType.values=B15&productionType.values=B16&productionType.values=B17&productionType.values=B18&productionType.values=B19&dateTime.timezone=CET_CEST&dateTime.timezone_input=CET+(UTC+1)+/+CEST+(UTC+2) https://transparency.entsoe.eu/generation/r2/actualGeneratio... though admittedly https://en.wikipedia.org/wiki/Black_start https://en.wikipedia.org/wiki/Black_start mentions that partial shutdown may be also requiring a black start?
- scrlk 2y agoDropping from 32 to 8 GW usually means that an interconnected grid has fragmented into islands. If an island has a blackout, you need to black start it and resynchronise it with other islands.
- joha4270 2y agoBut what prevents you from connecting the stopped power plants to one of those islands and then running it from there? I'm not claiming that is easy, but its not a black start. It looks to me like the author of this article has fundamentally misunderstood what a black start is. The fact that some power generation remained both on the peninsula, but also on imported power being available means that to my understanding this cannot be classified as a "black start". A lot of overtime, a lot of careful coordination yes, a black start, no
- franga2000 2y agoA black start is a process, not a situation. The situation they're in might not fully necessitate a black start, but a black start procedure might still be the best course of action. Some plants have that capability and the rest (should) have a direct tie to one that does. For all practical purposes, that's a black start.
- MartinGAugustin 2y ago[dead]
- boxed 2y ago99% up now. It's pretty impressive how fast they can get the system up and running again considering how seldom they need to do these types of things.
- TheOtherHobbes 2y agoInitial estimates went from "No idea" to "Could take days". In the end it took about 12 hours to restore most of the power in two countries. There are some knock-on effects from trains being in the wrong places, but a solid result overall.
- vvillena 2y agoThis is not correct. The REE press conference held about two hours after the start of the blackout gave an estimate of 6 to 10 hours, which was about right. Any other estimations were misinformation.
- anonzzzies 2y agoSome outlets said days to weeks, but who knows where they got that info.
- Symbiote 2y agoThis article was published when over half of power was already restored.
- Animats 2y agoSpain is mostly back up. Plant startup is only the first step.[1] It's load pickup. Here is a PJM training module on load pickup during system restoration.[2] It gives a sense of how touchy the process is. Power network control has good control over generation and transmission, but limited control over load. When load is turned on, there are transient loads with different time constants. There's a huge load for the first second as inductors, capacitors, and incandescent filaments start up. That tails off in under a second. There's a second load as motors wind up to speed. Ten seconds or so. Then there's "cold load", where everything in HVAC starts trying to get temperatures back to normal. Maybe half an hour. There's no mention of computer control. Listening to this, you visualize people running around reading meters and throwing big switches. It's probably people looking at display boards and sending commands to remote big switches, but the concept is the same. Botching this means voltage or frequency goes out of tolerance, protective devices shut things down, and the system operators have to start over. More PJM training modules on related subjects.[3] Unclear what caused this yet. Something caused enough system instability to trip protective devices, but there's no good info yet. Once everybody has a chance to compare all the logging data from different points, it will make more sense. [1] https://pjm.adobeconnect.com/_a16103949/p622tuwooba/ https://pjm.adobeconnect.com/_a16103949/p622tuwooba/ [2] https://pjm.adobeconnect.com/p6e5csm81ter/ https://pjm.adobeconnect.com/p6e5csm81ter/ [23 https://www.pjm.com/training/training-resources https://www.pjm.com/training/training-resources
- amelius 2y agoSounds like these systems are extremely vulnerable to sabotage. But adding more complexity such as distributed digitally controlled loads will not necessarily make the situation much better.
- pjc50 2y agoIn theory maybe, but Ukraine are doing a great job of keeping their grid up in a hot war despite attacks on power infrastructure.
- justlikereddit 2y agoThe groundwork for the blackout will inevitably come back to a buildout and reliance of renewable sources that do not have spinning mass that can do frequency synchronization. There are costly means to compensate for the lack of spinning baseload but actually building these devices have been neglected, to no ones surprise.
- showsover 2y agoThat was a fun 10 hours or so that we were without power in most of Barcelona. Some barrios had ~some~ power but most of us were without. The one thing that surprised me is how quickly rumors started about power being out in Portugal (true), France (true to an extent), Belgium (false), and the UK (false). Walking back home from work you heard the names of Trump being mentioned as well. It's a bit scary to personally experience how quickly people can start panicking. On the other hand the bars that had some power had a great afternoon with tons of beer being served before it got too warm :-)
- consp 2y agoAs long as the beer is cool, you only need CO2! Great off grid mechanism. Or N2 in case of Guinness.
- xenospn 2y agoI never have any cash on me. That would’ve sucked.
- showsover 2y agoI spent my last 5 euros on a sandwich and a croissant to eat on the walk home. All in all a pretty decent experience.
- solarwindy 2y agoYour comment immediately brings to mind this classic of croissant eating in ‘interesting’ circumstances: https://youtube.com/watch?v=wp84sRpM1Js https://youtube.com/watch?v=wp84sRpM1Js
- fifteen1506 2y agoAdd the store on Foursquare, "good blackout sandwich, 5 stars"
- elric 2y agoIn my experience, shops you frequent will be sympathetic to that problem and will just let you come back to pay later. And I imagine that any shops that sell stuff that needs to be kept cool were especially amenable to that ...
- ashoeafoot 2y agoHow do energy intensive processes like aluminium smelters or window glass producers preven their machines from self destruction ?
- exar0815 2y agoCan't answer for aluminium, but I can answer for window glass: One of our plants was threatened by massive flooding 2021, threatening the float glass oven (which doesn't float itself despite the name). It was closed off with insulation, turned off, and everyone hoped for the best and no steam explosion. In the end, only the cellars with the control equipment flooded and it could be gradually (as the control cabinets were checked and restarted) brought up again without loosing too much heat a day later. In short: Heat Inertia of large molten bodies is massive with good insulation. If the time is too long tho, only dynamite will dismantle a solid chunk of material again.
- echoangle 2y agoIs the heater keeping the material liquid not enough to re-melt it again?
- xnx 2y agoI'm guessing that liquid glass gets into some spots/crevices that it cannot be remelted from using built-in heat sources.
- exar0815 2y agoIts not an oven alone, its a kiln that smelts up the components for glass of the desired recipe, then purs the glass on a long (~half a km) basin of molten tin where it stretches and cools slowly, pushing the solidifying mass down the basin until the end. Re-Melting it is as far as i know not possible, as the melting is done before the pouring. You can melt the tin again, but not the glass.
- LunaSea 2y agoInteresting! Does this mean that you could use intermittent energy sources, like solar power, to heat up the float glass oven during the day and it woul keep enough heat during the night so that it could keep running in the morning?
- ahmedfromtunis 2y agoWe had something similar happen in Tunisia in 2002. The reliance on diesel turbines meant a very long rebooting process. As a result, the government invested heavily in installing gas turbines all over the country. When we had another blackout event in 2018(?), it only took an hour or so to get things back again.
- rightbyte 2y agoWhy is that? Are turbines easier to speed regulate than diesel engines?
- brohee 2y agoYes, the huge rotating mass is inherently more stable than a diesel. They key to grid stability is mostly huge rotating mass, either producing or consuming.
- actionfromafar 2y agoOr I guess, by inference, huge battery banks.
- brohee 2y agoBattery tech is an upstart in the grid stabilization world, the standard is actually huge flywheels https://www.gevernova.com/power-conversion/sites/default/files/2021-12/BROCHURE_GEA34602%20GE%27s%20Rotating%20Stabilisers%20For%20Grid%20Stability_July%202020.pdf https://www.gevernova.com/power-conversion/sites/default/fil...
- deleted 2y ago[deleted]
- prox 2y agoI imagine a lot of sunshine in Tunisia (not too familiar with your country) , is there a big transition to solar?
- seanalltogether 2y agoIf you're interested in the process of a black start https://www.youtube.com/watch?v=uOSnQM1Zu4w https://www.youtube.com/watch?v=uOSnQM1Zu4w from Practical Engineering
- zeristor 2y agoI am no expert, however with solar power and more grid batteries (I don’t think Spain has many grid batteries) wouldn’t it be possible to charge the batteries and use that to drive a ‘black start’. Sounds simple, and I appreciate from experience a huge amount of prep and validation needs to be done in the background.
- myself248 2y agoAt an extremely abstract level, it is conceptually simple, but most inverters are designed with safeguards to prevent exactly this. They only produce power when the grid is up, and in phase with it. Because if not sequenced and interlocked, islanding behavior can result in back-powering parts of the grid that are supposed to be disconnected and down for maintenance, or creation of desynchronized islands that then cause more damage when reconnected. This is absolutely a problem that operators need to solve. Radio synchronization is possible, neighborhood islanding could be beneficial, etc. There are entire village-wide micro-grids in remote places where everyone's inverters do perform these functions, it just hasn't been embraced in monopoly environments yet. For instance, relays that close isolated parts back onto the main network would need to be phase-aware, to only reconnect if it's safe to do so. You could mandate that all island-mode inverters center themselves around 50.1 or 60.1Hz in the absence of outside influence so there's certain to be phasing opportunities. Distribution networks would need more switches to provide positive isolation during maintenance. And all of these things would need huge amounts of interoperability testing. It's possible, but it has a cost.
- zeristor 2y agoThanks for the excellent insight. I’m guessing this could be more of a thing in the future to make the grid more robust. Didn’t Australia have a similar issue a few years back, which Tesla built a large grid battery to resolve, not just for storage but for stability.
- LorenPechtel 2y agoIt's not just a matter of monopolies, but risk tolerance. Only dance to the master's tune is a failsafe measure, ensuring a malfunctioning (or deliberately hacked--think of people using gay extension cords to plug generators into their house rather than the expense of a proper transfer switch) inverter doesn't electrocute a lineman. If everyone's inverter can feed the line you have a situation where you can never be confident the line is dead and you must always work the line as if it were hot.
- flysand7 2y agoOh man, this reminds me of factorio. When you miscalculate your power needs and your generators eat up the fuel that isn't being produced enough. I've had to make a bootstrapping mechanisms and power switches for some of my powerplants to ensure I can get it back up in case it goes down and I can then re-enable my factory bit by bit.
- ffsm8 2y agoIt's even worse in satisfactory imo, because the game is build around your fabs consuming wildly varying amounts of power throughout their production cycle... And after a power loss, they'll not only need the initial burst (can be handled via batteries) but will also now all be synchronized to have their power spikes at exactly the same moment. Dyson sphere program is the by far most forgiving in that regard. You can overdraw to something like 200% before it becomes really problematic, and even that quickly resolves itself the moment you get more power online
- m4rtink 2y agoAlso in Satisfactory pumps need power to run, so coal power plants quite realistically won't start without extra power (unless you have a water tower on the input).
- deleted 2y ago[deleted]
- hnuser123456 2y agoMid-line pumps do, but "offshore pumps" that pull water from lakes don't actually use any electricity. Otherwise, they would have to build a whole new mechanic for how you power your first water pump. Maybe you'd have to make iron buckets and bring 10 buckets of water to your boiler to get it started, then the offshore pump could use the brief moment of electricity to start pumping water continuously. Maybe you'd have to salvage a solar panel off your ship to start the water pump, since you can't build solar panels in early game. Maybe we're assuming that the water is flowing and the water pump has its own built in water wheel power source. Same thing with all the coal burning... how does that coal get ignited? Do we secretly have an infinite lighter in our pocket? Are we rubbing sticks together but not showing it for the sake of gameplay?
- everyone 2y agoWhat caused it? Nowadays when anything like this happens in the EU, I immediately wonder if it was Russian saboteurs. They have certainly been destroying infrastructure here, eg. undersea internet and power cables.
- ZeroTalent 2y agoIt was American saboteurs. First thing that comes to my mind /s
- deleted 2y ago[deleted]
- tenthirtyam 2y agoI was wondering if a solar flare could cause something like this. But if it had been that on this occasion, the astronomers would've been warning about it for at least 8 minutes. :-)
- K0balt 2y agoI can only imagine the difficulties facing technicians and engineers black starting a nation-scale grid. I operate a microgrid facility in Hispaniola and have wonderfully cooperative users backed by a separately powered communications and control system. Even for us, a facility serving a small neighborhood and farm, a black start must be performed as a careful choreography of systems and loads…and we can just pick up a radio and tell people to turn the main breaker of their house on or off, and to leave their AC units off until we finish bringing everything up. In 12 years we’ve only had to do it twice, but even for us it’s a tedious process.
- LorenPechtel 2y agoHonestly, I suspect a true blackstart would fail, too many desperate people trying to survive, keeping the people who need to get places from getting to those places. We already see the roads fail when people are fleeing wildfires.
- d1sxeyes 2y ago> This has to be managed in a way that ensures that only other power plants get the first electrons to start moving on the grid Oh dear.