Estimating Software Projects: So you messed up. Now what? (2021)
- donatj 3y ago> My suggestion: if a single week of overtime will help you meet a critical deadline, and you can promise your team it’ll be an extremely rare occurrence (like, once a year, at most), consider asking for overtime. Otherwise, just take your lumps and accept the late project. I am of the strong opinion that there are very few projects where the benefits of a couple more hours of work out of your employees a day is worth the cost on morale. Project gets out tomorrow versus a month from now? Will anyone still care two years from now? No? Wasn’t worth it. The human propensity for screaming “I want it now!” about things that don’t really matter never fails to frustrate me. And please don’t get me wrong. There are certainly cases where people’s jobs or the entire company hang in the balance. That is a legitimate reason for overtime. There’s also cases like the UI redesigns with no effect on the bottom line the last time I had to work overtime - and in my experience anyway this is way more common.
- mytailorisrich 3y agoIt depends on commercial pressure and on how overtime is compensated. Early in my career our main customer put huge pressure on the company to fix bugs ASAP and we had to work 2 weeks flat out with overtime late every night plus over the weekend. We managed to satisfy the customer AND I doubled my salary that month. If it is a rare event then I have no issue with that. This has no negative effect on morale (it can even be a boost and improve team spirit), and in fact would be happy to get the opportunity. It also helped that we had a good leader: our Director could not help on the debugging but made a point to stay with us and took charge of making sure we were kept well fed, paid for by the company, of course. Leadership and compensation are key.
- NeoTar 3y agoSadly it feels that overtime has been eliminated from the industry. Every contract I've ever signed (and this is in the supposedly more worker-friendly EU) has had text along the lines of 'Your working hours are 40h a week. Occasionally you may be required to work more. Overtime is not compensated.' The best I've had in a workplace is an informal policy of time-off-in-lieu for extra hours worked.
- em-bee 3y agois not compensating overtime even legal anywhere in the EU?
- hjadal 3y agoIt is in Denmark, my contract also states that I work 40 hours a week with uncompensated overtime. The only rules creating a cap on my working hours are the EU's, with 48 hours per week on average in a 4 month period.
- NeoTar 3y agoFrom what the Wikipedia page of Overtime says about the EU (https://en.wikipedia.org/wiki/Overtime#European_Union https://en.wikipedia.org/wiki/Overtime#European_Union) it seems that the laws are very concerned with working hours, but have nothing to say about overtime being required to be paid or not.
- 255kb 3y agoSome things may be urgent but most deadlines are bogus and created by sales and managers promising something to someone. And everything revolves around that, creating a toxic blame culture. Looking at you Scrum!
- nradov 3y agoSometimes the choice for salespeople is between promising to deliver by a certain deadline or losing the sale. Some companies simply aren't in the financial position to turn away revenue and still survive. If you don't want to ever be in that position, then make sure to only work for companies that are already financially secure.
- Aurornis 3y ago> Project gets out tomorrow versus a month from now? Will anyone still care two years from now? No? Wasn’t worth it. Depends on the industry and the circumstances. If this is a company shipping their own software product and the deadlines are arbitrary, then of course they should be a little flexible. But other software development is part of something bigger and/or accountable to third parties who are depending on it. If your software product must be ready for a scheduled run of a hardware build, a launch event that was planned months in advance, a date agreed upon with customers in a contract, or any other circumstance with real dependencies then getting it done on time is crucial. > The human propensity for screaming “I want it now!” about things that don’t really matter never fails to frustrate me. In my experience, people who have only worked in the first kind of environment (deadlines are arbitrary) are the most vocal about insisting that estimation is impossible or that deadlines shouldn’t exist. When they encounter a real deadline with real world consequences they struggle to track their own progress and have to do a lot of crunch mode in the last few weeks. People who have worked in the second type of environment (deadlines are real and have consequences) become quite good at estimating and managing progress toward deadlines without crunch mode at the end. They become good at communicating issues with deadlines far in advance to avoid surprises. I’ve worked a lot in the second environment. Eventually I learned that it’s important to screen for attitudes toward deadlines because many software devs have only worked in environments where they can deliver whenever it’s ready as opposed to working toward a target with a team. It’s a shock when they’re dropped into an environment where delivery dates actually matter, as opposed to being something a PM made up.
- sgarland 3y agoThis was also my experience in the Nuclear Navy, wholly disconnected from software development. I was my division’s maintenance planner, among other things, and so I needed to plan when we would accomplish preventative maintenance on approximately 20 different systems. Planning was usually done a quarter at a time, but there were semi-annual, annual, and greater maintenance items you also had to take into account. Further complicating things, many of the items had specific plant criteria to be met (some are easy, like “the reactor must be shut down”), some of which would only happen once in a given quarter at best. Finally, if you wanted to maximize efficiency, you also should carefully read every maintenance item to determine where there was crossover, so you could use one to partially setup for another. I made a huge dependency table in Microsoft Project, and generated Gantt charts from that. It worked flawlessly. A few key differences on the people side compared to software: * No one insisted that I plan for the nominal persons’ abilities. If Petty Officer Schmuckatelli happened to be a savant at a specific maintenance item, guess what, he’s always getting assigned that one. Others would assist (nuclear maintenance is always a two-person operation), but getting the job done correctly and efficiently was priority one. * I didn’t have to get consensus from a team on how long everything should take. This one is of course quite different from software, in that a lot of software work is novel to an extent; on the other hand, my submarine was of a new class, so there wasn’t a lot of institutional knowledge to fall back on. * Accountability is actually a thing. If you say something has been done, it’d damn well better be done. If you make a mistake, there is an all stop while you convene a meeting of god and country to hold a retrospective (though we call them critiques). There will be consequences. Not career-ending or anything – it’s quite common to cause a critique or three – but you also don’t get to just skip on out. They’re not blameful in that the point isn’t simply to say, “why do you suck,” but they’re also not oblivious to the fact that often, a person’s inattentiveness is in fact the root cause.
- gadders 3y agoYeah, I think "If we don't complete by XX we will be in breach of Regulation YY and will have to admit this to the SEC" is probably worth a bit of extra effort. "This milestone will go Red on my RAG report and make me look bad to my manager" - less so. But like anything else, hopefully there is give and take. "If you finish this version on time to help me out, we'll put half the story points in the next iteration so you can leave at 5/pay down tech debt/whatever."
- jf22 3y agoIt will never be "once a year" once you do it once. Once you start doing it, mandatory overtime will become a tool for making deadlines.
- scarface_74 3y ago> Project gets out tomorrow versus a month from now? Will anyone still care two years from now? No? Wasn’t worth it. 1. TurboTax 2. A game or other software that needs to get out before Christmas 3. A dependency is being shut down (https://www.honeycode.aws/ https://www.honeycode.aws/)
- notact 3y agoThe "No?" portion of the hypothetical you quoted is designed to filter out your examples. A few lines down from that clearly addresses the need for OT in critical situations.
- scarface_74 3y agoFair Side note: I was actually at AWS when Honeycode was introduced and on a team working on a popular open source “AWS Solution”. The Honeycode team wanted us to integrate with it and I vehemently opposed the idea. I said wait until it gains traction. Luckily, I won that fight.
- iamthepieman 3y agoI'm dealing with another common version of this right now. Another contractor (not from my company) had estimated a certain amount of time to fix everything and add some updates to code they had developed. Our mutual client didn't want to renew with them so asked if we could do it. But lo and behold, the deadline was two days from now so the sooner the better. I cut down the estimate by half but said it wouldn't include fixing anything since presumably they were living with existing bugs in production they could keep living with them if the new features were the priority. I did say that we would have to pay the piper eventually and that this rushed timeline would mean we would miss things and that it was only possible if we had everything in place to do the development work. Things like access, correct data, properly setup environment etc. Of course we started development and had none of those things. I did get it out on time according to my shortened estimated. But then they discover that they absolutely do need some fixes and that the assumptions the dev team had to make because we didn't have real data were wrong so the whole thing is delayed by about as much time as the original estimate but there's a whole bunch of hand-wringing and people thrashing about because of "slipped timelines". And I knew this going into it. No one ever hears "But we will have problems I just don't know what they will be" They just hear "I can get it to you in 3 weeks"
- pwthornton 3y agoThis depends. SaaS software with a sales window you need to make is way different than random software that doesn’t really need to go out at a certain time. Certain industries may have a few month sales window, and missing it could cost many millions against competition.
- pards 3y ago> if a single week of overtime will help you meet a critical deadline In my experience, every unit of overtime is followed by a larger unit of "undertime" where the team (usually subconsciously) goes through a period of low productivity. The ratio is often as high or higher than 1:2, so a week of overtime can result in two weeks of undertime. I present this as a fact when project sponsors request that the team work OT so that they're aware that they're trading future productivity at a loss for productivity today.
- pwthornton 3y agoA good UI redesign should have an impact on the bottom line.
- lowkey 3y agoI agree and would add the following criteria to identify the few rare cases where it is worth it to meet a hard deadline and where cutting scope is not an option. Specifically, if meeting the deadline is so important that it justifies unplanned overtime or a death march, then leadership should be happy to pay the team a one-time special bonus equal to 2-5x the time spent or even more. If faced with this choice leadership balks at the idea that’s a very good sign that a death march is unwarranted.
- bicijay 3y agoSaying that your future estimates will improve based on your last ones, is like saying you have more chances of winning the lottery if you lost some games before.
- jf22 3y agoNot at all. Estimation is not based on randomness.
- bicijay 3y agoI mean, unless you know all the variables in the feature scope it is pretty much random...
- jf22 3y agoYou know some. You don't need to know every variable to create an estimate.
- poszlem 3y agoCritics of estimation often use a sneaky trick called the motte and bailey fallacy. They mix up two different ideas: one that's pretty reasonable and easy to defend, like "we can't know _exactly_ what's going to happen in the future," with another that's way out there, like "the future is a total mystery, so trying to learn anything about it is useless because it's all just random noise."
- bicijay 3y ago"Critics of estimation" usually do this because managers don't actually know the concept of "estimation" and define your worth and paycheck on this concept. So it's just easier to simplify it to "just random".
- RaftPeople 3y agoPast experience can be used to drive good estimation. But it takes experience with the process of estimating to know when you "know" that your experience is relevant, and when it's not clear if the previous experience translates.
- tekla 3y agoHas all of software forgotten about Gantt charts?
- poszlem 3y agoFor better or worse Gantt charts turned into the poster child for old-school waterfall development and pretty much got kicked to the curb when Scrum showed up.
- ejb999 3y agoIn my experience, every scrum project I have been on became an exercise in satisfying the requirements of scrum, versus the requirements of the project. I actually had multiple scrum masters tell the developers that if they finished their assigned stories early, and there was still time left in the sprint - don't start any new stories, wait until they next sprint officially started, because it made the reporting better to upper management. People like that need to be fired.
- rgblambda 3y ago>don't start any new stories, wait until they next sprint officially started I think there's room for this kind of thinking, if the end of sprint is tied to a release, and spare capacity gets redirected to helping complete existing stories (both those things need to be true). I've never been in a team that did that though so I don't know how well that would work in practice.
- philomath_mn 3y agoYou can start on new work even if it doesn't get merged that sprint. Especially thorny tickets where 90% of the work happens before any code is written. But I agree with your point about assisting others on existing stories (if help can be given).
- sgarland 3y agoMy experience in writing (or performing) user stories for scrum was also annoying. Was someone else’s story too vague, but you know what actually needs to happen? Too bad, kick it back and make them write down what you already know. Did you write the story with such explicit requirements that there is essentially only one way to accomplish it? Don’t do that, because <reasons>. I hate scrum. I’ve found that poorly-done Kanban is also a nightmare, unfortunately. I’ve yet to find a happy medium.
- shubhamjain 3y ago> That estimate turned out to be wildly incorrect. The project ended up taking a year longer than I’d originally projected. The reasons are complex; the short version is that I made some major technical assumptions that turned out to be wildly incorrect. Several large architectural changes I’d thought we could avoid turned out to be unavoidable, adding all sorts of dependencies and additional work to the project. Honestly, I can't help but judge either the company or the author. What kind of project ends up taking more than a year to complete? Wait... it's "a year longer than I’d originally projected." So what was the original estimate? Six months? It doesn't matter how complex it was. If it is taking that long, the project should have been a smaller piece of what was planned. The author talks about re-estimating, communicating early, and owning up to your mistakes, which is all fine advice, but what if the project itself was too ambitious, and too broad to have a reasonable estimate?
- nradov 3y agoI think some HN users have only ever worked on web or mobile software and have no concept of what happens in the broader software industry. For example, on the F-35 (JSF) program they took about 10 years to ship the first real production release with multiple large schedule slips along the way. And that was despite deferring a lot of the planned scope.
- shubhamjain 3y agoThere is a difference in a "project" in your example and a "project" within a company (usually of a smaller scope and up for modifications). My opinion is that estimates are bound to be missed when there is so much scope for unknown variables creeping in.
- hallway_monitor 3y agoAgree, working in an enterprise where you need to integrate with many existing systems, conform to guidance etc is a different beast than startup code written by a single team. If you haven't worked in an enterprise it's difficult to understand why things take so long.
- 3y ago
- throwawaaarrgh 3y agoAll of this is very true! Thanks to the author for being open about their mistakes. If you want to avoid this scenario, your company needs good leadership. If you're at a company where the managers don't do any due diligence in terms of verifying the progress of work, you are at an either inept or toxic company. If all people do is ask you for a "status report" and they just hope it's correct, they're setting everyone up to fail. Good management is like a teacher in school who checks if students are completing their work, and if they aren't, gives them assistance. The teacher must actually check the work, and be interested in the welfare of the student as much as improvement.
- nine_zeros 3y ago> Good management is like a teacher in school who checks if students are completing their work, and if they aren't, gives them assistance. This requires the managers to know a lot about the technical aspects (nitty gritties if you will) of the work. In my experience, most line managers, and certainly the bosses above them, are so woefully clueless about the work that they are unable navigate timelines, scopes and challenges. Often, the bosses interests are also misaligned. Rather than take a step back and rescope/reevaluate the project, they want to squeeze engineers to get "something" done. Why? Because some upper manager will lose a fraction of their bonus or stock or promotion due to optics. The result of all this is Boeing of 2024.
- throwawaaarrgh 3y agoImmediate managers must have some experience with the report's work, absolutely. But farther up the chain, they still need to check work. There's certain details of progress you just can't fake. If you have 10 pieces of work, and you show each piece getting done at regular intervals, along with demos, then you can show your actual results and exactly how close you're getting to finished. Even someone who has no insight into the product can follow along and see the progress's results and trajectory. The more detail you get about the work, the harder it is to fake (you can fake a demo, but it's much harder to fake an entire Jira board)
- lowkey 3y agoThis is a great article with some valuable insights. I also noticed that it is part of a larger series of articles on Software Estimation which in my experience is one of the most challenging aspects of development in any organization. Worth reading: https://jacobian.org/series/estimation/ https://jacobian.org/series/estimation/
- jroseattle 3y agoI recently inherited a project that was "late". The team and project were 6 months into execution, and had nothing to show for it. The status on my Day 1 was "estimates were missed -- now what?" On appearances, everything should have been just fine. The SWEs and product leader were running two-week sprints, with all the ceremonies scheduled on all calendars (well, everything except the end-of-sprint demo.) Every two weeks, a status powerpoint slide deck came from the product leader espousing all the fantastic capabilities that were recently implemented by the team. I needed to understand what was going on. I chose to observe everything for two sprints (and not interrupt how everyone worked) while I focused on establishing a clear and comprehensive view of The Project. What I discovered: - An ambiguous and unclear definition of the project. Key facts, problem statement, overall solution ... did not exist. The product leader could give you some spin of this off the top of his head, which would invariably change from time to time. - Work stories (we used JIRA) were garbage. I'm an engineer and even I couldn't understand what work was being completed. - No capacity for the team to build & deploy software in a reasonable manner. - No agreement or understanding of expectations among stakeholders. So, what did we do? 1) Defined the project, with stakeholders in agreement. 2) Devised a solution, based on the project definition. 3) Broke down the work necessary to implement and deliver the solution. 4) Determined individual lengths of time to complete the list of work. 5) Reviewed everything, finding areas of risk and potential further problems. It sounds like BUD (big upfront design) -- but in practice, it was Big Upfront Discovery. We structured work and components to ensure we had plenty of two-way doors (only a few one-way doors, based on requirements from stakeholders.) And with that, we made our estimate. Another 6 months. The stakeholders did not like the timeline, but agreed "as long as we make that date." We provided weekly status updates, leaving out no details. Our stakeholder meetings went from contentious and confused to understanding and brothers-in-arms. We made the date and we didn't kill the team (morale actually went up.) The stakeholders loved the resulting solution. **************** No magic here, just a focus on attention to details and honest assessment.
- mason55 3y agoYes, ultimately if you don’t have a clear vision of the problem you’re solving and the value you’re providing then success will be impossible. And most people confuse building features with providing value or solving a problem and so most projects fail. If you’re able to define the problem you’re solving and what counts as “solved” then success it’s much easier. It’s also much clearer from the start when a problem is intractable. And it’s easy to tell if you’re not ready to start building yet.
- 23B1 3y ago0. Humans are bad at predicting the future. Make sure you're socializing that fundamental principle, especially to the customer. 1. You also need to model your project in more than one way as a self-validation. PMI-certified PMPs especially love a single, structured approach. 2. Provide estimates in ranges and fight for that to be the organizational norm. Once you win this battle, insure your first few reps are on time/on budget. 3. Don't let anyone pad their estimates. Do the padding at the end. Engineers especially love to pad their estimates since they hate giving answers based on unknown information, so show them that you're padding at the END and that their job is to provide the most accurate estimate. 4. Postmortem ALL THE TIME. At the macro and the micro. Your sales engineers should be sufficiently experienced to balance the hard with the soft skills AND have previous projects to draw on experience-wise.
- begueradj 3y agoUncle Bob said that you know your project's estimation only once you finish it.
- jacques_chester 3y agoHe might have pinched it from Watts Humphrey, who pointed out that the earliest estimate is the most valuable, but the last estimate is the most accurate.
- deleted 3y ago[deleted]
- cnity 3y agoIn which the industry continues to miss the core issue of estimation: task complexity is the shoreline paradox. The reason people fail to communicate lateness is the same reason they make "poor" estimates to begin with. You cannot "realise you are late" any more than you can "realise your estimate is wrong" before the task is complete. The hard part is deciding at what level of internal risk/concern you feel you need to raise the issue and suggest that the deadline is likely to be missed. The lower a task's fractal dimension is, the easier it is to automate. Therefore, the majority of ticketed engineering work has a high fractal dimension. That is, much of its complexity is unforeseen and unknown. It follows that estimates will be inaccurate. This is the reason people can continue to shill techniques, tools, and processes that proclaim to solve this problem. I propose leaning into this shoreline model and accept your tasks have a high fractal dimension, and use a multiplicative factor on all your estimates. Alas, this boring solution is both too mathematically motivated and sounds too much like an admission of failure (or of "messing up") to be accepted anywhere I've worked.
- bad_username 3y agoInvoking the shoreline paradox is very interesting, but not quite fitting. To continue the analogy, your task isn't to measure the shoreline length (which cannot be meaningfully done), it's to physically walk it. Walking the shoreline _can_ be done, and someone who's walked it many times in a practical way before would be able to give a reasonable estimate.
- Shrezzing 3y agoWhile it's accurate that task complexity is the shoreline paradox, it also has the same obvious solution as the shoreline paradox in day-to-day scenarios: Agree a resolution ahead of time and discuss the measurement in those terms. Nobody wants to know to-the-second when a project's Jira board will be complete, in the same way nobody wants to know to the atom-width how long the shoreline of Britain is. They want to know if the project is going to finish it in-or-near the last week of Q3, they want to know how many meters the shoreline is.
- cnity 3y ago
- johnny99k 3y agoIn my experience, software estimation's biggest problem is piss-poor management. A few years ago, I worked at a company that needed to move off of a legacy system. They had 5 years notice and the contract from the old legacy system had a hard stop (IE: after this date, we could no longer use the system). This system was running our entire business and had lots of moving parts. Management dragged their feet until there was 1 year to go. Our entire team ended up working nights and weekends and holidays From August->January. Most nights didn't end until 1am and we were expected to come in the next day at 8am for work. We would have worked Christmas day, but the director thought the company would get sued because it was a religious holiday. Management didn't have to work any of these long hours. There also wasn't any automated testing (and the company didn't want to dedicate any resources to it), so you needed to send in these hundred-column .csv files with various pieces of information on it and had to hope that after you got it all working correctly, that the next change to the system didn't break everything (this happened constantly, which also contributed to the longer hours). The deadline was overshot by about a month, but they somehow were able to get a contract extension. Management said this wouldn't happen again, but of course, they tried to do it again with a different project. At this point, I left.
- not_the_fda 3y agoThat's my experience as well. Most deadlines are bogus. The ones that are real are missed because management didn't fund the project appropriately, or started the the project way too late. I've worked in too many organizations where I was asked to give an estimate, and then asked to give another because they didn't like the number.
- deleted 3y ago[deleted]