I like the saying “slow is smooth and smooth is fast” as applied to software development. For all the talk of Agile processes and breaking creative work down in
by Chris_Newton 3y ago
I like the saying “slow is smooth and smooth is fast” as applied to software development. For all the talk of Agile processes and breaking creative work down into bite-sized chunks and prioritising collaboration and team productivity over individual contributions, ultimately our work is about thinking and fundamentally it requires that each individual doing the work understands what needs to be done. Not investing enough time in gaining that understanding early on means wasting far more time later.
IME, a huge amount of rework in modern software development results from diving into the implementation before the requirements were properly understood, a reasonable design was created and both were recorded in some useful form and reviewed by the relevant people to make sure everyone was on the same page.
We seem to have gone from one extreme to another with our processes. We realised that waterfalls that start with months of requirements capture followed by months of BDUF aren’t a great idea. But now we often seem to have one-paragraph tickets, maybe spend a few minutes thinking of some class names that look about right for each one, and then dive into coding. And then a week later we find that two developers working on three tickets have implemented the same concept four different ways and each of them was a different 75% of what the customer actually needed.
- jamies 3y agoI love that you quoted “slow is smooth and smooth is fast” -- I learned it as a volunteer firefighter! It's a great saying, and can be applied to just about anything.
- nonethewiser 3y agoSex?
- JackMorgan 3y agoAnother wacker in the wild! I'm taking Fire 1 (final burn today actually) and the instructors are always yelling "don't run, just move with purpose. MORE PURPOSE THAN THAT NUMBER 14"
- m3kw9 3y agoSometimes software engineers forget coding should be the final step, and not the main step. Defining as much as you can,80/20 before starting will save you time. Certainly there are cases where you have an idea and you dive right in and it will work out but usually that won’t work out well from my experience
- liamN 3y agoFor me, as a rookie developer, I find I often have little to no clue what needs to be done until I've started coding and figured out through trial and error how to implement it and what the requirements even should have been up front.
- jon-wood 3y agoJust because I feel more people should hear this early in their career, that’s perfectly normal. I fairly routinely answer questions about how long a piece of work is going to take by saying I’m going to need n days to work out what needs to be done, after which I’ll be able to give an estimate. That sort of exploratory work is really good because you’ll end up reading relevant documentation, then actually trying to use whatever it is you’re learning about. Often I’ll throw together a hacky version of what we’re aiming for, but ignore anything but the happy path. No error handling, no UI beyond the bare minimum, just the very core of what’s being done.
- ess3 3y agoAnd on that note the ”trick” to being more experienced is being able to anticipate what’s coming up next and already have a mental model for how to solve that. Easier said than done though
- proper_elb 3y agoHeh, I don't think that will ever really change. What changes in my experience is your knowledge and confidence when it comes to translating requirements into maintainable technology. The real world stuff seems to be always messy. My attitude is to try to locate areas of potential unknown risk, plan how to deal with the known risk and then hack away, knowing that no matter how much time spent, the plan will be flawed. During this whole process, communication is really important (i.e. 30% feedback, where I just write comments of what I would change in the codebase and then talk about it with a collegue)
- Mizoguchi 3y agoIsn't changing requirements one of the key principles of the Agile manifesto? If so, why do we want to dive so much into requirements that are likely to change anyways? Not saying we should jump into design without understanding the requirements, but sometimes requirements are incomplete or not clearly defined and we cannot sit and wait until a new revision is out or someone becomes available to answer our questions. I guess this really depends on the area we operate. In my business domain we call requirements "wish lists" as the solutions we build are for complex hardware that generally doesn't exist yet and there's a good chance the requirements spec you got today will be rewritten in six months, yet we need to start working as soon as the project is launched. So we have learned to design things that are reasonably easy to adapt, replace and test, we even developed an entire framework for this very purpose that has become some sort of spinoff business as some customers wanted to use it for their in house development.
- Chris_Newton 3y agoIsn't changing requirements one of the key principles of the Agile manifesto? If so, why do we want to dive so much into requirements that are likely to change anyways? Who says all the requirements are likely to change anyway? That’s a whopping great hypothetical on which the entire premise rests, but YAGNI applies to development processes as much as to code! Yes, requirements often evolve and we often start with some gaps or ambiguities in the spec. However, that’s a very different situation to having no detailed requirements at all. In one case, you know where you’re trying to go right now and can set a course that will take you there. Even if the destination is changed a bit during the voyage, you can adjust your course to compensate and still be heading in roughly the right direction. In the other case, you literally don’t know which way to start. Moreover, jokes about skyscrapers turning into spaceships aside, the central requirements for a software project usually evolve relatively slowly. Business priorities or some of the details might change faster, but in most fields the underlying domain concepts and actors that the software models are going to be relatively stable. Big pivots where you’re effectively trying to build a completely different product afterwards do happen. However, a team that pivots so often that it never really understands where it’s trying to get to before changing direction again won’t last long because it can never get far enough in any direction to deliver real value.
- crazygringo 3y ago> and fundamentally it requires that each individual doing the work understands what needs to be done Which is precisely what agile is about, specifically the estimation process. No story enters the sprint unless there is unanimous consensus among the engineers as to its point value, and it's the process of coming to that unanimity that makes sure each individual understands what needs to be done. A lot of people like to complain that agile slows down their coding, and this is by design -- to achieve exactly what you're asking for. > But now we often seem to have one-paragraph tickets, maybe spend a few minutes thinking of some class names that look about right for each one, and then dive into coding. That isn't agile. If you're estimating a new story the team hasn't discussed before, it's usually going to take between 5 and 30 minutes to come to consensus on its size and what it is conceptually. So the main problem you're describing is what Agile solves. Then you seem to have a secondary problem which is about different team members working in incompatible ways in terms of coding architecture. That require a team lead who is in charge of architecture decisions, that team members consult with whenever they start a story that there's no precedent on how to build. And code review ensures code is written as planned.
- uhtred 3y ago>No story enters the sprint unless there is absolute consensus among the engineers as to its point value, and it's the process of coming to that point value that makes sure each individual understands what needs to be done. I call bs. Are you telling me that the less experienced / less confident devs on the team don't cave to pressure from the team lead or whoever happens to be the most forceful / loudest to agree that, ok, this is only a 5 pointer and we all understand what needs to be done, because DAVE says it's easy, 30 minutes work tops, and DAVE is tired and has better places to be. You write as if the team is all top engineers with equality and not one leader and his minions.
- re-thc 3y agoThat’s not an agile problem so where’s the bs? If your team is not following agile you can’t just blame it.
- asdfman123 3y agoAt my company we have a nightmarish combination of a lot of docs and meetings but also the pressure to produce a lot of artifacts, so we have “planning” but it could be a lot better, uh, planned.
- jcrben 3y agoOne problem of delaying the coding is that it takes 5 minutes to dream up requirements that could take a millennia to complete. Coding is often the hard part actually, especially in some of the large slow moving corporations where coding is often delayed by lots of requirements brainstorming.
- josephg 3y agoRight; but the problem is that you usually don’t really understand what you’re building until you’re halfway through building it. Specs inform code, and code also needs to inform the spec. Both because we learn more about how it will be used, and because there’s usually a clean, simple, straightforward way you can build something that won’t exactly match up to feature list in front of you. Worse, I never seem to get those abstractions quite right until I’ve gotten them wrong a few times. If you don’t take the time to iterate and build some knowledge of the solution space, anything you make will be a bit of a buggy, fragile mess. And I think it’s much easier (and more efficient) to do that iteration during development than spend years building something messy and then try and remake it from scratch, cleaner, later. But that means it takes more time to get to market, and that’s a really hard pill to swallow (for good reason).
- fzeindl 3y ago> ultimately our work is about thinking and fundamentally it requires that each individual doing the work understands what needs to be done. Usually the individuals doing the work do understand that, but it is really hard to properly divide work and describe requirements. Why people try do divide it in even smaller tasks which increases this kind of complicated creative-writing work is beyond me. > We realised that waterfalls that start with months of requirements capture followed by months of BDUF aren’t a great idea. What we should have realized by now is that we never did waterfall right because it's inventor Winston Royce required it to be done TWICE for each project. Two iterations. What this world needs is Atlassian hiring a number of work psychologists and theorists and have them streamline JIRA based on their learnings. Not in a UX "I want to create a story"-story sort of way. But in a "How do I deal with 50 tickets that are vastly different in quality?" sort of way. They should answer questions like: "How can we make it so that the user always immediately knows whether to put this text in JIRA or confluence"? Then Microsoft needs to hire the same people and improve text creation in outlook.
- namaria 3y ago>What we should have realized by now is that we never did waterfall right because it's inventor Winston Royce required it to be done TWICE for each project. Two iterations. Reading the original waterfall paper was eye opening for me. I saw that we're falling into patterns that are decades old. Someone insightful tries to explain that learning and building are two sides of the same coin, and companies read it as "ok, I need a learning team and a doing team" and run with it in the wrong direction. Taking the conceptual structure of some paper of manifest and applying it cookie-cutter style is missing the point entirely. What Conway and Royce were trying to convey is that the social process that underlies software matters. What people do with it on the field is using the examples employed in the explanation and mistaking them for the solution to their lack of respect for the intricacies of social processes.
- uoaei 3y agoA somewhat related tangent is the idea that "writing is rewriting". Hardly, if ever, is a first draft suitable for publication, not just because it's rough-hewn or unrefined but also because requirements for some chapters change once others are written. The feedback loops between dependent parts of a written piece are dynamic, not static. (Yet another reason why LLMs are so limited: they take their earlier writing as sacred and unchanging as a direct consequence of their autoregressive structure.)
- Falkon1313 3y ago>breaking creative work down into bite-sized chunks In my decades of experience in multiple companies doing 'agile', that's something that we've always ostensibly strived for, but in practice it almost never happens in reality. At least not as intended. Occasionally it happens, but only by pure chance. It seems the 'agile way' is to attempt to manage a project by taking a sizable but coherent and cohesive concept/feature/requirement/design/plan, shatter it into a thousand incohesive random fragments of varying sizes (all estimated to be bite-sized, but true size unknown until they're actually done). Then everybody grabs a few fragments and works on them, placing them somewhere more-or-less where they're hopefully supposed to be, hoping that in the end everything will come together somewhat similar to the picture on the box. Then everybody has to try to duct-tape and glue them all back together again on a herky-jerky schedule, like doing a puzzle with constant interruptions and distractions for the agile rituals. The results aren't necessarily worse than waterfall/BDUF, but not necessarily better either. There is in truth a lot more potential to course-correct along the way. But since everyone's spastically going different distances in different directions at different speeds on as-yet-unconnected fragments of varying sizes, and no one can see the big picture, that theoretical course correction en-route is not nearly as powerful as it sounds. I've seen some debates about shorter vs. longer sprints. The die-hard agile people tend to push for the shortest sprints possible or even shorter, leaving no time whatsoever to clarify requirements, work out integrations, or do any QA/testing. No time for thought at all, just spit out some code, any code, as fast as possible and then it's review/demo/retro time. The veterans push for longer sprints, with time to understand and coordinate, experiment and test. But that gets a lot of pushback for not being agile enough, so we usually end up somewhere in the middle. And a lot of things don't fit neatly into that timeframe. Which in my opinion is not the worst thing, but also nowhere near as efficient or as effective as it could be if things were not broken into bite-sized chunks with arbitrary deadlines, but instead developed as parts of a cohesive whole. Whether from the foundation up (risky) or by building vertical segments and linking them together. "Move fast and break things" indeed. That's the state of the art - breaking things as fast as possible. We could do better.
- chii 3y agoIt all stems from the desire by stakeholders (who are paying the money) wanting to know when something is gonna ship, before committing the money. I think it should just be accepted that it is not possible to know. Unlike building a building, you cannot know. It is possible to do a feasibility study, or a prototype, and time box it, but that is as good as it gets. The stakeholders don't want to hear this unfortuantely. They refuse to believe it isn't possible to know ahead of time how much work is needed. In order to appease, the engineers and managers have developed a set of "practises" such as agile, but in the end, it is a lie.
- hinkley 3y agoMVP works when everyone on the team is seasoned. All of the members of the Agile Manifesto were seasoned. As were many of the people they tended to work with. For the rest of us “slow is smooth” means you should work on something that is analogous to the most important functionality first, to build your ability to do that work. Then as you gain skill, tackle harder and harder problems. Sometimes the rule of three lets you go back and fix so,e of that early poor ordering, but that doesn’t always trigger at all and sometimes triggers when you still don’t know what you’re doing. And then everything you do later is hampered by getting things wrong up front.
- benji-york 3y agoMight I suggest that instead of working on "the most important functionality first" you consider identifying the riskiest aspects of the project and working on those first? Some times those are the same, but often the part of a project that sinks it isn't the core functionality but some prerequisite that turns out to be much harder than anticipated.
- hinkley 3y agoNo that’s the problem. The riskiest bits stay risky forever if you tackle them before you understand how. Junior people or new problem domains require exploratory development before committing to a strategy. In an 18 month or three year project, it doesn’t affect your deadline much if you do the hardest bits in month one or month four. Except in how much rework you end up doing to those parts that have already started to cement bad habits. When we have a Rule of Three situation in the product backlog, I usually recommend one of two strategies. Do the hardest one second, or do it third and allocate very little time for the first two - you’re going to rework the whole thing when you get to #3 anyway. On one project, no matter what order we did them in, the third one took the longest time. Even when we tried to take our time on the second. Took me a year to train them to stop doing that. I’ve never seen a team so sure of their abilities yet with such a low opinion of their product. Big ol’ echo chamber.
- turtledragonfly 3y ago> slow is smooth and smooth is fast Another phrase with similar meaning (and interesting history) is "festina lente" ("make haste slowly," in Latin). I named my company after it (: It's certainly an ancient concept. I feel like software is ultimately about humans organizing complex activities, and humans haven't changed that much in the past few millennia, even if the activities have gotten more complex and abstract. I feel like the ones-size-fits-all approach of trying to say approach X or Y is superior (eg: scrum vs. kanban vs. waterfall, etc) is totally off the mark. Different sorts of work require different sorts of effort. Creative and full-of-unknowns work is different from assembly-line sort of work is different from maintenance work, etc. On a meta level, I think part of the "slow is smooth..." philosophy is to take a deep breath at the beginning and think about what sorts of approaches are going to be best suited for the tasks at hand. As opposed to some mindless "scrum is in, so we'll do that for everything". Or "everyone is using NoSQL now, so we should too" or any number of other cargo-cult-y behaviors. Festina Lente!
- namaria 3y ago>I feel like software is ultimately about humans organizing complex activities Organizations are much like software: embodiment of domain knowledge. It needs to be codified, and if you're not actively cultivating it locally, you're outsourcing the one thing that matters: learning. It's a 100% in the interest of incumbent players to divulge ready-made pretenses of universal solutions. It precludes competition.
- rtp 3y agoAnother saying "work smart not hard", i.e. you can save a lot of time by thinking things through before jumping into executing.
- natmaka 3y agoFast is fine, but accuracy is everything. In a gun fight... You need to take your time in a hurry. -- Wyatt Earp
- GuB-42 3y agoAnother one is Blue Origin's motto: "Gradatim Ferociter", which translates to "Step by step, ferociously".
- jokethrowaway 3y agoAgile processes is an oxymoron. "Agile" coaches scammed you
- kqr 3y agoNot at all. There are repetitive elements of agile development too. Or do you invent a new way to e.g. deploy your code every time you put it into production? Come up with a new format for retros? Vary the lengths of sprints and the check-in points in them?
- atoav 3y agoFast and stressed is where The Mistakes™ happen, and depending on the thing you are working on those may not be recoverable in time. When I am under time pressure I slow down a notch. Over the years my slow speed has gotten faster as well.
- atchoo 3y ago> slow is smooth and smooth is fast I've been in enjoying the converse of this i.e. "fast is smooth". It was provoked by using an ultra-fine fountain pen nib - too slow and it would be scratchy and dig into the paper with poor ink flow but using it very fast and lightly and it would be really smooth and delightful. I am prone to perfectionism, overthinking, procrastination, majoring in the minors and getting derailed by little hiccups. I get motivation by seeing progress. If I pause I can struggle to get started again so momentum is really important or I fall into a negative spiral. For my personal productivity, it helps to force a pace and do things faster than I naturally want. I need to keep up momentum and quickly do the known things and discover the problems early that need time to percolate in the back of my mind to reach a creative solution. I guess we all need productivity epithets that counter our dysfunctional traits - too slow then speed up! too fast then slow down!
- deleted 3y ago[deleted]
- btbuildem 3y agoOne of my faves, for sure. I find the "slow is smooth" transition to "smooth is fast" especially holds true for physical tasks. Learning how to do something for the first time - carefully, slowly, awkwardly - you lay the initial record grooves of muscle memory, and if these are "right" the first time around, then you don't have bad habits to unlearn once you become proficient enough for them to matter.
- datavirtue 3y agoThe typical waterfall assumptions are very overblown. We are doing ourselves a great disservice by throwing it away. Hardly anyone developing today has ever used waterfall much less agile. The waterfall:bad, agile:good trope is really tiring. Like listening to a teenager that knows jack shit explain how the world works.
- datavirtue 3y agoDown voted by know-it-alls trapped in an agile doctrine.
- _gabe_ 3y agoI couldn't disagree more. The worst codebases I've seen in my career have been codebases that were religiously planned upfront, and then religiously adhered to The Plan. Irregardless of the revelations that popped up in the midst of development. This usually takes the form of pattern driven developers: the developers that must fit the entire problem into a predetermined pattern (which is ridiculous because every problem is unique and there are very few patterns that are truly applicable everywhere). This will also take the form of Amazon's famous 6 page design upfront. It's funny, they wanted me to prescribe what the expected latency of a system that would be running over an unreliable network was and figure out an SLA based on that, before I wrote an ounce of code! How in the world are you even supposed to begin getting accurate measurements, without measuring! So, planning is good yes. But the reality is every problem is unique. Unless you have somebody who's solved the exact problem you're trying to solve, planning is going to do no good and you're better off exploring first. Once you became a domain expert in your tiny niche domain you just explored, then you get to make a plan. But enough with this nonsense that we can magically figure out what the exact requirements are for a problem before we've even begun to measure the appropriate metrics associated with the problem. And one of the key ways we can measure stuff is by exploring the problem space with code.
- tornato7 3y agoI've recently become a big believer in Python notebooks to plan out these sorts of designs. It allows you to quickly mock up and iterate on a few prototypes to build your expertise, and then actually document a proposed design alongside working code that demonstrates the functionality. The bonus is, being a Python notebook, you usually avoid the common pitfall of shipping crappy prototype code to production; you are forced to rewrite it because putting a Python notebook into prod would make any software engineer shudder.
- lloydatkinson 3y agoOne paragraph tickets? At my previous job that would be considered a miracle!