8 ms·
TSMC Outlines 2nm Plans: N2P Brings Backside Power Delivery in 2026, N2X Added
- d3mon 4y ago2 years behind Intel, as they release 20A with backside power delivery in 2024.
- gowings97 4y agoWe'll see if that - 1) Is actually released in 2024 2) In volume 3) Plays a meaningful role in getting Intel back into striking distance to the performance crown in perf per mm per watt. Intel has pulled every shortcut lever (larger dies, crank up the power) to continue to be relevant. They're running out of shortcuts.
- metalspot 4y agoIntel 20A is scheduled for mass production in 2H24 and TSMC N2 in 2H25, so 1 year according to current roadmaps. However, fabs get judged on what they ship, not what the promise. TSMC is shipping N3 in volume, and Intel 4 is still not shipping, and sounds like it will be a cut down limited volume release (https://www.tomshardware.com/news/intel-meteor-lake-cpus-for-desktops-incoming https://www.tomshardware.com/news/intel-meteor-lake-cpus-for...) most likely because the yields are not there. Based on prior delivery it is highly unlikely that Intel will ship meaningful volume on 20A before TSMC does on N2, but miracles happen.
- ksec 4y ago>Intel 20A is scheduled for mass production in 2H24 and TSMC N2 in 2H25, so 1 year according to current roadmaps. TSMC N2P ( Backside Power Delivery ) is 2026. So that is what OP meant by 2 years.
- metalspot 4y agoyou are right. but the claim that tsmc is "2 year behind intel" based on those roadmaps is assuming a lot. intel has consistently failed to deliver on their prior roadmaps and is currently behind tsmc in what they are shipping, so it requires a bit of magical thinking to believe that they will suddenly get a 2 year lead on tsmc. intel is still not shipping 4, which is their first part to use euv. based on what they are shipping, they cant do it at volume yet. the idea that they are going to scale euv and then jump to gaafet and bspd in the next 18 months is kind of beyond belief. when intel was failing to deliver 10nm (now called 7) in volume, they were saying the exact same thing, that 10nm was delayed but 7nm (now called 4) was on schedule (https://www.anandtech.com/show/15217/intels-manufacturing-roadmap-from-2019-to-2029 https://www.anandtech.com/show/15217/intels-manufacturing-ro...). back then intel 4 was scheduled for 2021. the magic leap didnt happen and it is 2 years late so really no reason to think that everything else wont get pushed back the same this time. tsmc has already been shipping euv products in volume for years and they have a roadmap for introducing gaafet and bspd incrementally which looks a lot more realistic.
- Miraste 4y agoIntel's scheduled release dates tend to be... optimistic.
- ksec 4y agoTSMC was never about being first, despite somehow they are now the leading edge Fab. TSMC has always been conservative with feature set. GAA was supposed to be 3nm but ultimately pushed to 2nm. Same with Backside delivery. TSMC is very clear about what their date does and means. Intel's 2024 ( and it is late 2024 ) will only be starting to producing and shipping to customer in 2025. The volume difference between Intel's 20A and TSMC is also not comparable. This is a similar case with Samsung where they announce their latest nm but you dont see actual product shipping with it. That being said I still think Intel would catch up by 2025. The question is whether they could find enough customers and volume.
- TheBigSalad 4y agoWhat makes you think they'll catch up so soon?
- svdr 4y agoAmerica and Europe need to start making these kinds of advanced chips themselves as soon as possible. Taiwan is now the only place where this is possible.
- brink 4y agoIf we have to go back to 4 or 5nm processors for a while, it won't be the end of the world.
- ChuckNorris89 4y agoEurope doesn't have 4 and 5 nm fabs on its soil nor European owned fabs aboard. GloFo Dresden goes down to 22nm.
- vonzepp 4y agoSmallest probably 7nm Intel in Ireland. Not sure it is online yet though
- osnium123 4y agoIntel Ireland (Fab 24/34) will be producing Intel 4 and 3, which is an EUV based node
- terminalcommand 4y agoSo potentially they could even go to finer architectures?
- worrycue 4y agoIntel has stopped using "nm" - it's meaningless anyway; hasn't been meaningful since 1994 (https://en.wikipedia.org/wiki/Semiconductor_device_fabrication#Feature_size https://en.wikipedia.org/wiki/Semiconductor_device_fabricati...). Now it's just Intel 7 (currently in use), Intel 4 (successor to Intel 7 for internal use) and Intel 3 (based off Intel 4 for their foundry services).
- Aissen 4y agoI like that we are moving away from (fake) nanometers and giving names to process nodes instead; comparing different technologies by Xnm was completely broken.
- amelius 4y agoAt least you could meaningfully compare using "<" and ">". You can't do that with codenames.
- Gasp0de 4y agoHow was it meaningful? What would the info "This one is called 5nm and this one is called 8nm" give you? Because it didn't really say anything about performance or watt or performance per watt. I have an old ATI Radeon HD4850 GPU, I bet it beats your Nvidia RTX 4090 since 4850>4090 ;)
- kevincox 4y agoThat is true, but just calling it the TSMC 2024 Process also allows comparing. But they don't like using dates because then if they stay on the process for a few years it is more obvious that it is "old".
- mastax 4y agoTechnically TSMC doesn't use nm. It's the N2 node, not the 2nm node, but tech press is the way it is.
- eis 4y agoUnfortunately TSMC does indeed use nm extensively https://www.tsmc.com/english/dedicatedFoundry/technology/logic https://www.tsmc.com/english/dedicatedFoundry/technology/log...
- dragonelite 4y agowell or else you will get intel naming scheme of using 10nm ++++++
- 4y ago
- alberth 4y agoSo is Apple planning to use the N3E this year (not the N3)?
- eis 4y agoAccording to some reports it might be both. N3 (aka N3B) for A17 and N3E for M3. N3E is probably too late to produce the numbers needed for the A17 which should hit the market in September.
- jokoon 4y agoquestion: isn't there a bottom transistor size that it's physically impossible to go below?
- bee_rider 4y agoSo far any prediction of the bottom has not really come true. There must be some limit, but these engineers are pretty crafty. I bet they won’t beat one transistor per atom! Any other prediction, I’m suspicious about.
- bick_nyers 4y agoPhysically impossible? I wouldn't say that. 2nm is a marketing term, depending on how you define it, it is actually 20nm or 45nm here.
- eis 4y agoIt's probably very hard to shrink further than a very low number of atoms but we're far from that. The "2nm" marketing name has no relation to the actual physical size of the transistors. The physical features of the "3nm" process node are something like 24nm and 48nm. The Van der Waals radius of a silicon atom is about 0.2nm. Transistors made from a single molecule have been demostrated. Maybe we could even shrink to elementary particles but that's in the realm of SciFi so far.
- pjc50 4y agoThe absolute hard minimum has to be one silicon atom wide, or 0.2nm. But note that "3nm" doesn't quite have any features that are that size, it's a non-precise marketing term.
- ksec 4y agoWorth noting GAA was suppose to come in N3, and Backside Power Delivery was originally scheduled for N2. So both feature got delayed and we end up with a fine tuned N3E. ( We could safely ignore N3.) As with TSMC tradition we should see a fine tuned, cost reduction of N2P in 2027/2028. That is when all the mainstream products could enjoy those features.
- metalspot 4y ago> GAA was suppose to come in N3 any source on that? as far as i know there was never any official roadmap or announcement by tsmc of gaafet on n3. this article seems to be from the n3 announcement (april edit: 2020) (https://www.techpowerup.com/265991/tsmc-3nm-process-packs-250-million-transistors-per-square-millimeter https://www.techpowerup.com/265991/tsmc-3nm-process-packs-25...) and it was announced as finfet then. another article from n3 announcement in april 2020: https://seekingalpha.com/article/4338843-taiwan-semiconductor-manufacturing-company-losing-process-leadership-to-intel https://seekingalpha.com/article/4338843-taiwan-semiconducto... ("Taiwan Semiconductor Manufacturing Company Losing Its Process Leadership To Intel")