Nuclear power plants can vary their output faster than most people think, see https://www.oecd-nea.org/upload/docs/application/pdf/2021-12/technical_and_econo
by PaulHoule 4y ago
Nuclear power plants can vary their output faster than most people think, see
https://www.oecd-nea.org/upload/docs/application/pdf/2021-12/technical_and_economic_aspects_of_load_following_with_nuclear_power_plants.pdf https://www.oecd-nea.org/upload/docs/application/pdf/2021-12...
... most of the modern light water nuclear reactors are capable (by design)
to operate in a load following mode, i.e. to change their power level once
or twice per day in the range of 100% to 50% (or even lower) of the rated
power, with a ramp rate of up to 5% (or even more) of rated power per minute.
One trouble is that changing the power output does put stress on components because of thermal expansion and contraction, potentially shortening their lifespan, but it something that can be designed for.
- Reason077 4y agoMost reactors in service operate at a constant load, and don't vary output according to demand. Certainly in the UK they do not. Sometimes reactors are operated for extended periods at reduced load for various reasons (eg: to conserve fuel and extend the time before a refuelling shutdown is required), but they don't vary output day-to-day.
- moffkalast 4y agoRamping it up is likely the problem, since all plants can reduce power on a dime by just varying the generator coil current I think. You could just keep it spinning nonstop without a load I suppose, but for anything but nuclear it's not gonna be economical.
- Reason077 4y agoA nuclear power plant can't just "keep spinning without a load" - all that energy has to go somewhere! If a nuclear plant is disconnected from the grid (tripped), the nuclear reaction must be stopped (eg: by inserting control rods into the core).
- moffkalast 4y agoOf course it can, just short the generator coils and you have a free brake. The turbine should then still have resistance and shouldn't overspeed. Or just idk, use it to pump some water in a loop or discharge through some resistors. Getting rid of power isn't that hard if you want to do it. Simplest solution would I suppose be to just have an outside radiator that brings the steam to cooling tower levels of manageability so you can throttle the turbine with just a valve. The thing is, they don't really want to do it if they can save fuel by shutting down.
- Reason077 4y ago> "just short the generator coils and you have a free brake" You'll soon end up with a burning/melted generator. > "pump some water in a loop" OK, but you're going to need huge pumps (1000+ MW!). Expensive. > "or discharge through some resistors" Again, you'll need extremely large resistors, and a way to dissipate an awful lot of heat. We're talking about a huge amount of energy here!
- Scoundreller 4y agosadly, my searches for "gigawatt resistor" and "gigawatt electric load" have been fruitless.
- blibble 4y agotry "reserve ultimate heat sink" instead of "gigawatt resistor"
- moffkalast 4y agoPump water in a loop through a radiator to cool the braking generators and the resistor bank :P Could try also melting some salt on the side.
- Gwypaas 4y agoThe problem is taking the most expensive power source with a large portion of the costs being the initial investment and then not running it 100% is economical suicide.
- cdogl 4y agoNot if the market provides incentives to curtail, which it does with negative pricing. If other energy sources can curtail enough at the same price, they’ll do it. Otherwise nuclear will. The costs you’re alluding to can’t be avoided, but they’ll be spread across the system. This is all predicated on the market operator actually having the systems in place to signal the need for curtailment effectively, of course. That’s a whole different question.
- eru 4y agoI'm not sure why you would ever curtail something like wind? Could you at least mine bitcoin or something like that?
- derriz 4y agoVarying output from a nuclear plant is mostly achieved by simply releasing the generated steam into the atmosphere instead of sending it through the turbine[1]. But operating a nuclear plant in this fashion pushes up the price per MWh considerably given their very high cap-ex and op-ex. And while fuel cost is negligible for nuclear, creating more nuclear waste per useful MWh generated is a further drag on costs. So as a solution, it "works" if the nuclear plant does not have to compete in terms of price with other sources of electricity. But nuclear fails to compete on cost even if operated continuously - it's uncompetitive with cheap, quick to deploy, low op-ex, modern tech like CC gas turbines or renewables in most western electricity markets and can only survive with government subsidy[2]. [1] https://www.nrc.gov/docs/ML0703/ML070380209.pdf https://www.nrc.gov/docs/ML0703/ML070380209.pdf [2] https://www.washingtonpost.com/business/2022/04/19/biden-administration-launches-6-billion-nuclear-plant-bailout/ https://www.washingtonpost.com/business/2022/04/19/biden-adm...
- liketochill 4y agoNit: the steam is not released to atmosphere, it is sent directly to the condensers. Treated water to use in boilers and turbines without leaving deposits and damaging them is precious, so it is a closed cycle and not vented to atmosphere whenever possible
- robryk 4y agoYour reference for [1] just states that bypassing the turbine is a thing, not that it's normally used. First, reactors are in a stable equilibrium when operating, so one will actually increase their power by increasing the rate at which heat is removed (and v.v.). Alas, that's workable only within some small range. A reason[1] load-following with PWRs was originally difficult is that traditionally PWRs use boron concentration in primary loop to regulate power and that can be decreased only slowly. The reason it's done that way is that it's the easiest way to ensure that power is adjusted uniformly throughout the core; if instead some control rods were partially inserted, the top part of the core would operate at lower power (and thus lower fuel burn-up) than the bottom part, which would cause compounding control issues later on. France is using their PWRs in load-following mode by (a) having additional less absorptive control rods ("gray rods") that can be inserted fully to adjust power by smaller increments (b) more complicated schemes to decide which combination of available actuations to use to change power. See https://hal.science/hal-01496376/document https://hal.science/hal-01496376/document for a paper that tries to optimize control designs so that power changes are more possible (and describes how the control schemes work). Note that the total heat capacity of even just the primary loop in usual reactors is quite large: in PWRs it usually requires ~0.5s of full power output of the reactor to warm it by 1degC, so this can easily cover, say, ~5% variations for something like a minute. [1] Another is that reactors are not stateless due to xenon poisoning.
- cm2187 4y agoBut using a nuclear power plant as a backup when there is no wind doesn't make any sense. If you build a nuclear power plant you might as well use it, costs the same either way. And if you use it, why building wind?
- sbaiddn 4y agoNot a nuclear engineer, but Im curious to know how they do it - throttling nuke is hard. I only know the stream "dumping" method. There's good reason why they are hard to throttle. For starters thermal contraction shortened lifespan; but also because the nuclear cycle itself doesn't lend itself to throttling safely - nuclear products create "retarded (?) neutrons" which are the cornerstone of a stable control system (as opposed to prompt neutrons) and also significant amounts of neutrons poisons which are normally "burned" at equilibrium steady state power levels but which accumulate if you throttle down (therefore be needing even more prompt neutrons). My understanding is that the more you need to rely on prompt neutrons for your neutron balance the more unstable your reactor (starting them up, therefore, is delicate). Throttling the power upsets this balance by at least two different mechanism.
- ccalloway 4y agoIt can be designed for, but it wasn't designed for when current UK nukes were built; they were intended to replace baseline coal plant.