10 ms·
I was one of those. The bigger - and hidden - advantage to me was that my homebrew power setup (16 solar panels + a 2 KW windmill with a backup generator, and 4
by jacquesm 5y ago
I was one of those. The bigger - and hidden - advantage to me was that my homebrew power setup (16 solar panels + a 2 KW windmill with a backup generator, and 48 KWh of batteries) was much more reliable than what Ontario Hydro & Power sold.
The fees are one thing, having your freezer contents spoiled a couple of times per year gets old really quickly, and in rural Ontario having a well stocked freezer is not optional. Especially in the winter the power would go out so frequently it was a serious limitation. Coming from NL, where powerfailures are so rare that they make the news when they happen this was one of those little things that I found it hard to adapt to. When the power in Canada fails you are in immediate trouble, your heater and sump pump no longer work, you risk all kinds of follow on damage.
So reliable power wasn't a luxury and it was relatively easy to get that sorted out to a degree that cutting the cord was a logical next step (because a grid connected system is supposed to shut down when the power fails, the only way out is to stop being grid connected).
Apropos high fees: the power company wanted some exorbitant fee for disconnecting us (the opposite of a connection fee), I asked them quite friendly what would happen if I shorted out the wires, 15 minutes later a truck came and someone pulled the road side fuses for free ;)
- vinay427 5y ago> Coming from NL Given the Canadian context, do you mean the Netherlands or Newfoundland and Labrador?
- Pet_Ant 5y agoIn a latter comment he says he moved “back to Europe” and links to his site reveal a Dutch looking name. https://news.ycombinator.com/item?id=28999144 https://news.ycombinator.com/item?id=28999144
- nervousvarun 5y ago> When the power in Canada fails you... I think contextually the very next sentence gives you your answer here.
- jacquesm 5y agoNetherlands.
- mytdi 5y agoOh, I had assumed Newfoundland and Labrador because of, as you say, the Canadian context. So it was actually Netherlands.
- rexreed 5y agoDo you have any blog posts and pictures of your setup? I'm quite curious to hear how it is working!
- jacquesm 5y agoThere are quite a few posts about this, it was working splendidly right up to the point where I moved back to Europe. https://jacquesmattheij.com/how-to-build-a-windmill/ https://jacquesmattheij.com/how-to-build-a-windmill/ https://jacquesmattheij.com/how-to-build-a-windmill-ii/ https://jacquesmattheij.com/how-to-build-a-windmill-ii/
- rexreed 5y agoCool. I always wondered why you chose St. Josephs Island to settle from Europe. Solar costs have certainly gone down since then.
- jacquesm 5y agoThey're a fraction of what they used to be, the panels that I bought back then you can now have for 20% of the price or so. Funny enough, installation costs have gone through the roof so effectively you still pay just the same for the total installation unless you do it yourself. You'd expect that increased competition would drive down installation costs but it didn't really work out that way. I'd stay away from movable panels, it was a lot of work to put it in and cost quite a bit, for that money you can now buy far more panels which more than offsets the ability to aim them better. Installing a windmill is something that I would not advise for novel installations unless you have a lot of room around you and quite a bit of spare time. Windmills, compared to solar are finicky devices and require a lot of thinking to get them right, solar power is much simpler. The 'DIY powerwall' scene has turned recycling Li-Ion batteries into an art form, not all of it is done safely but some of the results are quite impressive, battery power too is now a fraction of what it cost back then and the life-span has gone up considerably, with more and more interesting options right around the corner.
- 5y ago
- alex_duf 5y ago>because a grid connected system is supposed to shut down when the power fails, the only way out is to stop being grid connected On that note I believe there are electrical devices that automatically disconnect you from the grid. It allows you to use a battery / solar array to power the house, while not feeding back any power to the grid such that you don't harm anyone trying to fix the grid. Now whether or not this is allowed is very much dependent on which country you live in. This video is in the UK and demonstrate such a device: https://www.youtube.com/watch?v=gP51JjnWvLo https://www.youtube.com/watch?v=gP51JjnWvLo
- chiefalchemist 5y ago> Now whether or not this is allowed is very much dependent on which country you live in. So basically, to clarify, you're either 100% on the grid, or 100% off. There's no using both depending on conditions, is that it?
- ghaff 5y agoYou can have a backup generator (with a transfer switch)--which many do in more rural areas at least in the US.
- bluGill 5y agoI'm not sure about Ontario, but in many places you can be grid tied which means that you use both. While it is possible to change depending on conditions, the equipment to do that isn't very common. Solar systems are just starting to come out with single outlets that can run while the sun shines without the grid, but that is rare, most assume 100% on grid, or 100% off grid.
- iso1210 5y agoThe vehicle I'm currently sat in at the moment has a 32A electrical cable running in the back, currently pulling 2881W into a magic box provided by victron inverter/charger, that is used to charge a battery (which is currently fully charged). That battery is currently being drained at a rate of 2881W to run the equipment (via the inverter back to 230V) If I pull the 32A cable, everything carries on working (I believe it's a sub-20ms switchover). If the power goes for some other reason it carries on working. The truck can run on a 230V/13A source just as well (although when the aircon is on - not needed currently - we'll be pulling more than 13A so the battery will slowly drain). I can even plug into two different inputs. Now this is a mobile vehicle, and I'm no electrician, but my understanding is this is perfectly fine -- the victron presumably switches from the grid if the input is lost and doesn't feed anything back into the grid. Presumably the same setup could be used to power a home instead of several racks of equipment in the back of a truck.
- rdli 5y agoI've been interested in how to do this -- in particular, how you tie in your solar inverter, windmill, and batteries together. Are you using AC to tie everything together, or are you able to use DC everywhere until you use it?
- jacquesm 5y agoAC as much as you can. Wiring thickness quickly becomes a limiting factor so you site your inverters right next to your battery banks and you keep your solar voltage as high as your inverter allows you to (up to 400V these days).
- londons_explore 5y agoYou can do it either way. Tying together with DC usually works out cheaper, since MPPT tracking buck converters to charge the batteries are cheaper than having extra inverter capacity. As a bonus, you can buy quite a lot of 12V DC equipment made for cars and caravans which tends to be a lot more energy efficient.
- MisterTea 5y agoModern systems with multiple DC sources are usually all tied to a common DC bus (24-60V depending) that is parallel with the batteries. Devices called charge controllers take the unregulated DC from a DC source (PV, Wind, hydro...) and output a constant voltage which can be used to charge the batteries or be directly consumed by the inverters. The inverter takes care of tying the DC bus to the AC side of things including the grid and/or generator. Modern DC tied inverters perform multiple functions as they can be programmed to use AC or DC as the source, charge the batteries and even feed power back into the grid.
- eatbitseveryday 5y ago> rural Ontario having a well stocked freezer is not optional. Especially in the winter the power would go out so frequently it was a serious limitation. This sucks, but is it not cold enough to put freezer items outside?
- kache_ 5y agoYou try lugging a whole deer's worth of venison outside to the snow every time your power goes out
- windowsrookie 5y agoSure, that should take less than 20 minutes and I'd get my workout in for the day.
- smnrchrds 5y agoAlso, are there not bears in rural Ontario? If there are bears (or other large predator animals) in the environment, putting food outside can be very dangerous.
- EngCanMan 5y agoBears aren't usually a problem in the winter, with hibernation and all...
- gpm 5y agoOnly black bears, even in summer they're dangerous to the food, but not really that dangerous to you (as long as you act reasonably). Racoons are more dangerous to food, too. There are bear proof barrels, which are frequently used for camping (and I'm not sure if I'd bet on them against a bear, but they keep racoons out), or if you don't have them you can tie your food up a tree and that does a pretty good job too.
- forinti 5y agoI think the idea was to have the freezer permanently in a cold place like a shed attached or very close to the house.
- chaostheory 5y ago> having your freezer contents spoiled a couple of times per year gets old really quickly This is now becoming a reality for more and more people in the Bay Area due to a combination of corruption and failing infrastructure.
- laurencerowe 5y agoWhere I am in SF it seems to be the opposite. Until a few years ago the power would go out every time it rained heavily but at some point they fixed it and now we get electricity when it rains. (Major roads still become impassable when it rains because it happens infrequently enough they’re not built with a camber.)
- MichaelZuo 5y agoThere aren’t rainwater drainage systems for SF roads? Seems surprising.
- laurencerowe 5y ago280, the main motorway out of SF has standing water on it every time it rains heavily. Seems to be built with a different profile to motorways in UK which are cambered for the rain to run off. Guess it must just not be worth it given how rarely it rains heavily here.
- chaostheory 5y agoYeah SF right now seems to be the most resistant to power outages just because it’s not going through our fire prone nature preserves
- namdnay 5y agoHow long are your power cuts? If you keep it shut, a freezer is fine for 24-48h
- chaostheory 5y ago
- iso1210 5y ago> because a grid connected system is supposed to shut down when the power fails, the only way out is to stop being grid connected I've just had a tour of a hydrogen fuel cell setup we have here at our OB. I'm no electrician, but from what I could tell, it's plugged into the mains, currently drawing about 3KW, and hydrogen is producing another 12KW (we haven't got much demand for this event - the generator will produce 250kW if we want). It comes in from the mains through an isolating transformer, into the generator and UPS, and then outgoing power to us goes through another isolating transformer (to stop mains hum that we saw last time, in both directions) It seems it's perfectly fine to have this sort of setup connected to the grid in the UK. Obviously it's more expensive to do so than just wiring in your own diesel generator.
- jacquesm 5y agoThat's a very nice bit of kit that you have there. Pictures?
- LorenPechtel 5y agoYup. Fundamentally, the issue is whether there is any means by which locally-generated power can backfeed onto the mains. Typically cogeneration is handled by making the local generator have no ability to create the signal, it can only come from reading the line voltage. The mains voltage dies, there's no more signal to drive it and so even in case of failure it will shut down. Any system which absolutely prevents backfeed is acceptable, your use of the mains charging the UPS and the UPS driving everything is an acceptable way to do it--even if your system goes nuts no circuit exists by which that power can backfeed. It's more typically done by a mechanical isolation switch, you can either be connected to the mains and rely upon the signal from the mains or you can run locally with no physical connection to the mains. The reason for this is repairs. If a lineman opens a breaker the wires after that point must go dead no matter what--if your system backfeeds into the wire you could kill the guy working on the wires.
- quickthrowman 5y ago> It's more typically done by a mechanical isolation switch Do you mean (automatic|manual) transfer switch? A transfer switch transfers the load to the generator and isolates the generator from the line side(utility side, or ‘mains’ for the two tiny islands that like silly words like ‘mains’) A ‘mechanical isolation switch’ (safety switch, disconnect switch) is simply a disconnecting means.
- vmception 5y ago> Coming from NL NL in this context is Netherlands? Or another area of Canada?
- monkeybutton 5y agoProbably Newfoundland
- SavantIdiot 5y agoIs 2 kW a typo? That's pretty small. I typically see 12-15 kW residential turbines.
- jacquesm 5y ago2 KW is a 5 meter diameter windmill, which is pretty large for a homebrew. 12-15 KW turbines are major feats of engineering, I would not trust myself to put together something that size, besides the gear required to put it up. A 2 KW machine has an alternator/blade combo that weighs close to 100 Kg, about the limit of what you can raise and lower with normal equipment. Keep in mind that it sits on top of a 10 to 20 meter high tower, which makes raising and lowering it a job all by itself.
- SavantIdiot 5y agoThanks, I just did some researching thinking I was right and I was the one who was mistaken. Yes, you are correct: 12 kW are a big install: https://en.wind-turbine-models.com/turbines/1579-windkraft-zentrale-elektromat-12kw https://en.wind-turbine-models.com/turbines/1579-windkraft-z... https://en.wind-turbine-models.com/turbines/1664-psw-en-drive-2000-12kw https://en.wind-turbine-models.com/turbines/1664-psw-en-driv...
- bcrl 5y agoHaving dealt with Hydro One on permits and pole replacements from the telecom side of things, I can say that their methodology is not geared towards minimizing costs. They wanted me to pay $20,000 to replace 8 suspect / restricted insulators on one pole line, all of which were within 6 kilometers of each other. Done by a reasonable private contractor, all 8 insulators could have been done by a single crew in 1 day. Not Hydro One. Each one gets scheduled independently and assumes 2 hours of travel time to get to the job location (a not entirely unreasonable assumption for independent jobs, but ridiculous in the circumstances). What's worse is when Hydro One's shortsightedness ends up costing them gobs of cash. I've seen brand new pole lines replaced within 2 years of being built because the ADET didn't leave any Spare Capacity on the poles. Add a communications strand and multiple poles need replacement. Since they had 6 phases of power on 60+ foot poles, Hydro One's replacement cost is north of $15k per pole. All because the lower class pole was maybe a few hundred dollars cheaper. #FAIL
- mleonhard 5y agoThe company is supporting a lot of local contractors. Do you think they waste money because of incompetence or corruption?
- bcrl 5y agoActually, Hydro One doesn't use local contractors all that much as it's heavily unionized. Even in discussions about permitting, hands are often tied as it is almost impossible to assign work previously done by union employees to external contractors or even those of us submitting permits. For the last few years Hydro One has been trying to reform its internal processes for permits, and the folks in charge of that get huge amounts of push back internally, making the pace of change abysmally slow even though everyone knows they have a problem. There is also the perverse incentives of operating a regulated utility. As they are usually the monopoly LDC in a given area, the amount profits they are permitted to generate are limited relative to their costs (somewhere around 10-15% iirc). This creates a perverse incentive to inflate costs as they are then permitted to generate larger profits. If they reduced costs and profits grew too large, they would be forced to lower rates, which is clearly a bad thing in the view of Hydro One management.