> modern America’s ability to build anything big any more. The first transcontinental railroad took 6 years to 1,900 miles. All the grading, track laying, and
by WalterBright 5y ago
> modern America’s ability to build anything big any more.
The first transcontinental railroad took 6 years to 1,900 miles. All the grading, track laying, and bridge construction was done by muscle. Black powder was used for the tunnels, but the holes to put the power in were bored by hand.
In contrast, Seattle Transit will take 30 years to build 22 miles of track, with modern construction equipment, and that's in the remote possibility they'll be on schedule.
Seattle used to have rail networks. The right-of-ways are still there, but Sound Transit very carefully avoids using them. Nobody is ever able to explain why. Some even still have rusting rail on them, while the ST crews are blasting new right of way a block over.
- Hypx_ 5y agoYou should be aware of the death toll for the construction of the first transcontinental railroad. It's not something we can legally replicate.
- WalterBright 5y agoLife was generally more dangerous and harder those days, and medical practice was terrible. Horses, for example, regularly killed people in those days (more than cars do), and their use is not the romantic image we have of them today. If you can show that the railroad was built on blood, I'd be interested.
- throwaway0a5e 5y agoExactly. It was a high dollar construction project. If anything it was safer than a mundane bottom dollar "cut whatever corners we need to be the lowest bidder" project. Everything was just that much more dangerous then.
- WalterBright 5y agoWorkers also flocked to those railway jobs, because they were better than their other options.
- secabeen 5y agoMost of the work was done by Chinese immigrants, who didn't have many other choices.
- killjoywashere 5y agoThis combative assertion of race-based victimization is not as productive toward the conversation as people may think. Indeed, it tends to drive a great many people into defensive positions where they hunker down. I grew up in Omaha, the end of the transcontinental railroad that Californians tend to forget about. I'm very sorry that so many Chinese immigrants died working on the railroad. I am also saddened by the many others who died, even though they were not immigrants of Chinese extraction. I'm also saddened by the atrocious conditions these immigrants escaped in China and compelled them to the US (I assume they did not desire to come to the US, and it's worth noting many no doubt landed elsewhere). While the CRPP may have preferred Chinese labor, I do not find evidence that they did "most of the work". Indeed, the main employer of the Chinese was the CRPP, which laid 690 miles of the 1912 miles of track. The Union Pacific labor was primarily sourced from the remains of the Union and Confederate armies. It is correct that 80% of the CRPP labor force was eventually (not initially) Chinese. It is also correct that the CRPP laid 36% of the rail by distance. First order approximation would suggest that the Chinese fraction of the built distance is between 15 and 29%. https://en.wikipedia.org/wiki/First_transcontinental_railroad https://en.wikipedia.org/wiki/First_transcontinental_railroa... https://railroad.lindahall.org/essays/brief-history.html https://railroad.lindahall.org/essays/brief-history.html
- WalterBright 5y ago> I assume they did not desire to come to the US If you have evidence of Chinese slave ships coming to the US, I'd like to see it.
- jcranmer 5y agoIf I recall correctly, the Central Pacific had to resort to advertising for railroad labor in China to get sufficient labor force (so not merely able to recruit from recent immigrants, but having to induce immigration to get labor). The Union Pacific, for its part, relied heavily on Irish immigrants and ex-soldiers from the Union and Confederate armies. That's hardly people flocking to the railway jobs.
- asdff 5y agoPretty normal accident rates are found worldwide for modern HSR construction that doesn't take two decades to build a single line like CA HSR. Look at what China or Spain can build in that time span for less money.
- bullfightonmars 5y agoThe build out of the Sound Transit light rail is taking 30 years for the following reasons: 1. ST only has the funds to build out a small % of the project at any one time. The work has to be staged because they can't take out all the $ at once. 2. Project managing the build out of the whole thing at once would require a much larger organization, which would be more expensive 3. Building the whole thing at once would require a much large workforce and much more equipment, which would be more expensive. 4. Staging construction gives them the time to work out the details of the next phase while working on the current phase.
- WalterBright 5y agoThe railroad wasn't built all at once, either. It was two teams, one going east, the other west. The companies were paid as work progressed, they did not have access to all the funds in advance. They didn't even know the route to be taken, they had survey crews working ahead of the construction, marking the best route. If you don't think they had a much larger logistics problem, consider the problems with supplying the crews with food, water, clothing, rails, ties, horses, wagons, everything they need, from a thousand miles away. The most important thing, though, was the companies were paid by the mile. The faster they built, the more money they made, because that would push the meeting point further away. They had ENORMOUS incentive to move fast. And it worked. ST, however, has no incentive whatsoever to move things along. They have every incentive to delay, invent problems, all so they can go back and demand more money. At a company I used to work for, they hired a team of old software engineers to write a piece of software for a good customer. It took them 3 months, and arrived on time and under budget. Want to know the secret? They had a huge bonus for being on time (I think it was ten grand apiece), which would shrink away for every day late. I asked if that was what motivated them to be on time, and they all denied it with "we're professionals". I openly laughed at that. It's amazing what happens when the incentives are aligned with the desired results. We saw that last year when vaccine developers wanted 18 months to develop a vaccine, and Trump gave them a big financial incentive to get it done before the end of the year. Later came the usual denials that these incentives motivated them in any way :-)
- deleted 5y ago
- IkmoIkmo 5y agoWhich Seattle transit of 22 miles? The Line T took 3 years to construct, Line 1 is 22 miles but it's already built, it took 6 years of construction. Indeed it took longer to plan, but we're talking building in a major metropolitan area, not empty land. > All the grading, track laying, and bridge construction was done by muscle. It's both an argument to applaud efforts of the past, as well as criticise the nature of the past. I certainly wouldn't want to be a labourer in 1865, when life expectancy in the US was less than half (37) of today's 78 or so. It's not all labour standards of course, but it certainly must have played a role.
- WalterBright 5y ago> empty land Boring through two mountain ranges, crossing many rivers (including the Mississippi). Endless bridges for ravines, creeks, and rivers. Lots of snow sheds, the longest was 29 miles, using 29,000,000 board feet of lumber. Done with muscle.
- imgabe 5y agoBut there were no neighborhood activists protesting every foot of track, demanding endless environmental impact studies, attending every city council meeting to complain about the project, etc, etc. Building a bridge across a ravine is a fairly well understood and easy to solve problem as long as no one is actively trying to stop you.
- staplers 5y agoBut there were no neighborhood activists protesting every foot of track Well, there were, but they were killed/displaced.
- deleted 5y ago[deleted]
- spookthesunset 5y ago> But there were no neighborhood activists protesting every foot of track, demanding endless environmental impact studies, attending every city council meeting to complain about the project, etc, etc. People love to get their pitchforks out against eminent domain but I assert without it not a single large public works project would ever get built. No dams, no sewer treatment plants, no water lines, no power lines, no power plants, no trains, no highways, no anything. Without eminent domain, there will always be some holdout somewhere that throws a wrench in things no matter how many truckloads of money you toss at them. To actually build massive public infrastructure, you need a way to force people to cooperate. Without, you'd never get the project off the ground.
- weaksauce 5y agoyeah i'm sure we could have those breakneck speed railway construction in the middle of the open, unihabited plain for the majority of it and then for the incredibly dangerous stuff we could send in the marginalized at the time chinese/irish workers to handle unstable dynamite paid half that of other workers and ignoring any and all safety regulations and building codes of today.
- WalterBright 5y agoThey used black powder, dynamite only became available towards the end. You have good points, but consider it ran TWO THOUSAND MILES, not 22, and still took only 10% of the time. You say "open plain", but try driving it some time. It had to go through two mountain ranges, for example. The workers came because they got better pay than anywhere else. This includes the Chinese and Irish. It was not built by conscripts.
- weaksauce 5y agodeath toll is not known but it's over 1000 they estimate of just chinese laborers. at the peak there were 15,000 or so workers working on the rail. in fact the main suspected etymology of "chinaman's chance[0]" (aka no chance) was because they were the demographic that did the super dangerous work that killed 6% on the low end. The construction was also not one large project but two large projects constructed in parallel and the blasting/excavating was done ahead of the time. Sure they could lay down 10 miles of track a day on open plains but the hard work was through the mountains and that's the stuff that slows the construction down like if you were to build 22 miles of track in a heavily populated area with land already claimed by other entities and having to deal with easements and other legal battles + logistics. Nitroglycerin was used in large quantities on the central pacific railroad construction and were predominantly chinese laborers whereas the union pacific was more irish laborers. The central pacific rail owned their own TNT factory even. I am not sure what you are getting at; black powder was used but it certainly wasn't the only thing in use especially in the west. 0. https://en.wikipedia.org/wiki/Chinaman%27s_chance https://en.wikipedia.org/wiki/Chinaman%27s_chance
- 5y ago
- coryrc 5y agoBecause they had a government mandate. ST continually must renegotiate with every level of local government. This could all be sidestepped by a state law, but this is just another cost of FPTP voting.
- WalterBright 5y ago> Because they had a government mandate. It wasn't quite that simple. It was a giant project, and there was the usual squirrel fire drill one sees with any large government project where everyone has their hand out for bribes and corruption.
- WalterBright 5y agoIn another display of modern government engineering, the I-5 / I-405 interchange in Lynnwood was under continuous construction for 20 years.
- asdff 5y agoThe 5 is a disaster of a freeway. It sees such an amazing amount of traffic and I feel like the state honestly has no idea what to do about it as it gets worse and worse each year with more commuters and increased trucking traffic, since freight rail is evidently at capacity in California. I have hit gridlock on that freeway at 10pm dozens and dozens of times. The entire way from LA to SD is marked by death, with scrape marks on every single barrier pretty much continuously over hundreds of miles, and tire marks of cars careening in a spin across all the lanes into a wall.
- reportingsjr 5y agoThe solution is not to build more highways and roads, as much as many people hate to hear that. Basically as soon as it is made slightly easier and faster to drive, people will adjust by driving more. There are quite a few instances where an already large interstate has been increased in size and the traffic got /worse/ after the fact. Cars just aren't an efficient way to move people around for the money they cost. I'm genuinely curious if things are going to start swinging back in the other direction where there is more focus on other transportation modes outside of cars. There have been some small scale rail expansions in larger cities, some intercity rail lines opening (brightline) and being built (california high speed rail). It hasn't been enough to hit a sort of tipping point yet though.
- asdff 5y agoWhile it is true that commute times might go down when freeways get wider, that's only half the coin. The purpose of the 5 is not to facilitate commuters like many other local highways in SD and LA, but to facilitate international trade between the U.S. and the world. Speed goes down, yes, but throughput goes up. Throughput is what is needed when you are trying to move trucking traffic from Central America through the southland north up the the central valley of CA, or east along the 10. It is what is needed when you need to move trucking traffic carrying all goods ordered by Americans from Asia from the port of long beach or LA into the heartland, because the freight rail grades are already at capacity. It's like having a bucket of water with a few holes vs a lot of holes; rate of flow might be unchanged per hole (lane), but you are moving more water (trucks) in the given span of time with the bucket with more holes. Right now there are dozens of supercarriers anchored off the coast of Long Beach, waiting weeks to unload goods into clogged logistical networks. In a future where everyone takes a bus or a train or a bike to work, they are still ordering all their shit online from Asia and stocking their grocery stores with food from Central and South America, and there will therefore always be increasing demand for the movement of more goods over time as the population continues to grow.
- thatfrenchguy 5y agoPeople do things fast when they think it’s the most important thing, like the Covid vaccines. Government officials and most of the contractors are going to keep on using their stupid inefficient 25mpg SUVs and pickup truck and never take the train anyway, why would they want the project to go any faster?