Ask HN: How do you roll back production?
Once you have pushed code to production and realized there is an issue, how do you roll back?
Do you roll forward? Flip DNS back to the old deployment? Click the button in heroku that takes you back to the previous version?
- robbya 7y agoSpecifically, I tell Jenkins to deploy the commit hash that was last known good. Jenkins just deploys, and doesn't really know that it's a "roll back." Generally, going back to a known clean state should be easier, safer and relatively quick (DNS flip is fast, redeploy of old code is fast if your automation works well). In some cases changes to your data may make rolling back cause even more problems. I've seen that happen and we were stuck doing a rapid hot fix for a bug, which was ugly. We did a lot more review to ensure we avoided breaking roll back. So I'd advise code review and developer education of that risk.
- mooreds 7y agoHow do you find the commit hash that is the last known good? Looking through jenkins release logs, asking someone, something else?
- zootam 7y agohaving the jenkins build history reflect release deployments generally works well enough. if build #20 is bad, build #19 deployed with hash XYZ was last known good, click 'rebuild' or 'replay' and it'll deploy #19 again.
- httpsterio 7y agoIn our case its quite simple. All commits should be tested and if we need to roll back, it means either that tests have failed and it was pushed nonetheless, tests were missing or tests didn't catch the issue. In the first two cases, we revert to the commit where untested or failed code was introduced to the master. This basically never happens. In the third case, you need to do some debugging and try to figure out why it's broken and either fix it or revert it. Basically just look at the git history. If the code has dependencies then you might need to do code triage and produce a hotfix. If it's a relatively isolated piece, then just revert and fix it at a better time. We use semver and gitlab's tags so we know just by the versioning if the code that is broken is important or not and if we can roll back.
- StreamBright 7y agoWhat about logical errors? math.pow(2, 4) vs math.pow(4, 2)
- ISL 7y agoA test can test for those: "does the code give mathematically correct results?"
- StreamBright 7y agoI meant pow as an example to point out that there are logical errors in code that you cannot catch with unit tests.
- weaksauce 7y agothose kinds of errors should be caught a little higher in the hierarchy... some kind of feature or integration test.
- Scarblac 7y agoEven the best tests only catch like 50% of the bugs though.
- WrtCdEvrydy 7y agoThat's not really correct. Properly input space partitioned tests have something like 90 to 95 accuracy if properly written. The issues always come from people not wanting to add sufficient tests.
- cortesoft 7y agoDoes that mean that 1 in 20 deploys breaks, then?
- 7y ago
- msbarnett 7y agoTag your released commits in git. Then just ask your deployment infrastructure to deploy whatever tag was in production immediately prior to the failed deployment.
- pedalpete 7y agoWe create a release branch for each release so we know we can always go to a previous branch which was safe.
- ccmcarey 7y agoHow do you deal with DB migrations?
- timdorr 7y agoMigrations should be separated out from other code changes. If you have a rolling deploy process, then you need to make sure your database changes are forwards and backwards compatible. Assuming you've got a CI in place, making the migrations a separate, testable commit will let you do this easily. We did this at my last company with a small GitHub bot and a CODEOWNERS file.
- kyriakos 7y agoExactly this. If your db changes are compatible in both directions then you are safe. It's not hard to achieve. Just make sure new columns have default values and your orm can deal with extra undefined columns and don't drop anything during migrations.
- seanwilson 7y agoWhen do you drop the old e.g. columns and tables that are no longer in use though? You schedule it for say a week later when you're sure you won't need to roll back that far?
- rvdmei 7y agoRolling back is usually a bad practice and can get quite challenging if not impossible in distributed environments. If you can pinpoint a specific commit that is causing the issue. Revert that commit and go through your standard release process.
- mooreds 7y agoWould love to know more about how you roll forward in that case. Or do you canary so thoroughly that bugs never get to prod?
- rvdmei 7y agoBugs do get to prod, that’s just reality. If you keep changes small and release often you won’t see many big bugs in production. We typically keep master in an “always deployable” state. If a bug gets found in prod, we either fix it or create a new commit that reverts the commit that caused the problem. If it’s a faulty migration, reverting the commit usually won’t work and we have to fix the bug. For QA we use a mix of automated tests and manual tests.
- EliRivers 7y agoTell people we need to roll back, clone the repo to my hard drive, open up git, undo the commit that merged the bad code in, push it. All done. "Production"? Does that mean something that goes to the customers? Very few of our customers keep up with releases so it's generally not a big deal. We can have a release version sitting around for weeks before any customer actually installs it; some customers are happy with a five year old version and occasional custom patches. I bet it's a bigger problem for those for whom the product is effectively a running website, but those of us operating a different software deployment model have a different set of problems.
- sqldba 7y agoYou’re being downvoted but it’s a totally reasonable reply for normal vendor software.
- EliRivers 7y agoSomething I remind myself of regularly is that the entire software world I have ever experienced is actually a tiny, tiny piece of the real software world.
- MetalGuru 7y agoYeah, these strategies are really only critical to client-server architectures where newly deployed code is immediately used by customers.
- sbmthakur 7y agoAt my workspace, we use Gitlab. We pick up the old(stable) Job ID and ask Devops to deploy it.
- rinchik 7y agoroll back (step back), is an inherited from waterfall anti-pattern. Now we should only march forward with small, on demand releases, this way we will know exactly where the issue is and will be able to fix it forward quickly. Rollbacks were a strategy with monthly (or even quarterly [insane huh?]), giant, stinky, release dumps, knowing there is no way we could quickly identify and deploy the fix. aka lets throw production 3 months back and take another 2 month for figuring out there the issue that happened during last release is. And to finally answer your question: we never roll back. We always march forward.
- ISL 7y agoUntil the fix is identified, can't one 'march forward' by rolling back recent changes to a known-good state?
- rinchik 7y agoNope, you are "pretending" that a step back is a step forward (which is not true). I never had to roll back anything within last couple years and very happy about that. Also note, that roll back was a valid strategy back in the day and still can be useful tool in your garage of tools. It can be useful when, for example, dealing with complex legacy systems that were created decades ago, or complex systems developed by outsourced development teams. You'll know when roll back is useful when you see it.
- nprateem 7y ago> Nope, you are "pretending" that a step back is a step forward (which is not true) If the business is losing $BIG_BUCKS per minute of downtime, it is most definitely a step forward.
- mooreds 7y agoCongrats, that sounds awesome. So when a bug affects prod, do you: * Find the code that is affected * Write a test * Have it go through ci/cd * Deploy to prod. Or is there a different way of deploying a big priority bugfix to production than normal deploys?
- drubenstein 7y agoDepends on the issue - if there's a code / logic bug that doesn't affect the data schema, we use elastic beanstalk versions to go back the previous version (usually this is a rolling deploy backwards), and then clean up the data manually if necessary. Otherwise, we roll forward (fix the bug, clean up the data, etc). It's more often been the case for us that issues are caused by mistaken configuration / infrastructure updates. We do a lot of IAC (Chef, Cloudformation), so with those, it's usually a straight git revert and then a normal release.
- dxhdr 7y agoPush different code to production, either the last-known-good commit, or new code with the issue fixed. I imagine that much larger operations likely do feature flags or a rolling release so that problems can be isolated to a small subset of production before going wide. But still the same principle, redeploy with different code.
- thih9 7y agoWe devs are usually prepared for failures during larger operations; but smaller, routine deploys with unexpected failures could be just as dangerous.
- sunasra 7y agoWe use chef framework. Each deployment has specific tag. If something goes wrong, we revert to most stable chef tag and redeploy to all the tiers.
- atemerev 7y agoBlue-green deployment is the only way to fly: https://martinfowler.com/bliki/BlueGreenDeployment.html https://martinfowler.com/bliki/BlueGreenDeployment.html There are two identical prod servers/cloud configurations/datacenters: blue and green. Each new version is deployed intermittently on blue and green areas: if version N is on blue, version N-1 is on green, and vice versa. If some critical issue happens, rolling back is just switching the front router/balancer to the other area, which can be done instantly.
- gfodor 7y agoYup, can't beat blue/green. A big part of the reason I recommend it is because unlike most other rollback schemes, the actual mechanism for rolling back is the same as for a normal release (a load balancer flip), so it's continually exercised and validated. To roll back, you literally do a deploy, but you just skip the step where you alter the bits on the dark cluster. This is highly unlikely to fail, since the only thing that has to not go wrong is the part where the software update is skipped, which basically boils down to a conditional. Any mechanism for rollbacks that isn't tested continuously is likely to fail during incident response. It's a huge anti-pattern to have 'dark' processes only used during incident response -- same thinking behind why you should also be continually testing your backups, continuously killing servers to verify recovery, etc.
- Angostura 7y agoThey you just have to worry about rolling back the changed database schema that you have rolled out to both green and bluie variants - I presume. That bit feels tricky
- gfodor 7y agoYep, that's a fair point. In scenarios where you have made non-backwards compatible database changes, this approach cannot be used. Typically the dark cluster is accessible for pre-flight testing, so you can run tests there to determine if the service is still operating as expected despite the database being one migration step ahead. In your response runbook, you should have a contingency for the scenarios where that happens. (For many projects, the % of changes that have this characteristic are small enough that it doesn't move the needle on the risk profile, but Murphy's law can mess with you :))
- yellow_lead 7y agoFor our Kubernetes apps, every merge to master creates a tag in GitHub. If there's an issue that doesn't result in a failed health check (these would be rolled back automatically), we can rollback by passing the older tag into a Jenkins job.
- emptysea 7y agoIdeally we'd have the problematic code behind a feature flag and we'd turn the flag off. For other issues we press the rollback button in the Heroku dashboard. Heroku has its problems: buildpacks, reliability, cost, etc, but the dashboard deploy setup is pretty nice.
- cddotdotslash 7y agoWe actually just implemented something like this. Our entire environment is AWS CodeBuild, CodePipeline, and Lambda-based, but the process would be similar for more traditional environments: 1. Developer creates a PR. To be mergeable, it must pass code review, be based on master, and be up-to-date with master (GitHub recently made this really easy by adding a one-click button to resync master into the PR). 2. Each commit runs a build system that installs dependencies, runs tests, and ZIPs the final code to an S3 bucket. 3. Once the developer is ready to deploy, and the PR passes the above checks, they type "/deploy" as a GitHub comment. 3. A Lambda function performs validation and then updates our dev Lambda functions with the ZIP file from S3. Once complete, it leaves a comment on the PR with a link to the dev site to review. 4. The developer can now comment "/approve" or "/reject". Reject reverts the last Lambda deploy in dev. Approve moves the code to stage. 5. The above steps repeat for stage --> prod. 6. Once the code is in prod, the developer must approve or reject. If rejected, the Lambdas are reverted all the way back through dev. If approved, the PR is merged by the bot (we have some additional automation here, such as monitoring CloudWatch metrics for API stability, end-to-end tests, etc). TL;DR - Don't merge PRs until the code is in production and reviewed. If a rollback is needed afterwards, create a rollback (roll-forward) PR and repeat.
- jacobkg 7y ago“GitHub recently made this really easy by adding a one-click button to resync master into the PR” I’m trying to find this feature but my google-fu is failing me. Can you link to an announcement or doc page for this?
- cddotdotslash 7y agoI can't find any announcements about it, but you can try it out: open a PR based on master, then push a separate commit (or merge a different PR) to master and return to your original PR. If you scroll down, there will be a box saying the base branch is out of date and a button asking to resync with master. If you click it, they will merge the master branch into your PR. I'm not sure if there are specific settings required for this to work. For example, we have the master branch protected and require the status checks to pass and the PR to be up to date before it can be merged.
- wickedOne 7y agointeresting question. we roll forward and thus far never ran into the situation that that wasn't possible in a reasonable amount of time. nevertheless i've wondered more than once what would happen if we run into such a situation and there's a substantial database migration in the process (i.e. with table drops). curious to learn what the different strategies are on that point: do you put your table contents in the down migration, do you revert to the last backup, etc.
- ht85 7y agoGenerally a good strategy for dropping columns or tables is to rename them instead (e.g. `table_deprecated`). If things look stable after whatever time you deem necessary, you can write a second migration to actually drop them. If you run into issues, your down migration simply undoes the rename.
- perlgeek 7y agoWe use https://gocd.io/ https://gocd.io/ for our build + deployment pipelines. A rollback is just re-running the deployment stage of the last known-good version. Since the question of database migrations came up: We take care to break up backwards incompatible changes into multiple smaller ones. For example, instead of introducing a new NOT NULL column, we first introduce it a NULLable, wait until we are confident that we don't want to roll back to a software version that leaves the column empty, and only then changing it to NOT NULL. It requires more manual tracking than I would like, but so far, it seems to work quite well.
- cdumler 7y agoYou are asking a very generic question without really stating what environment you are using. The ability to "rollback" is really a statement of how you have defined your deployments. A good environment really should have a few things: * A version control system (ie. git) that has a methodology for controlling what is tested and then released (ie. feature releases). If you want the ability to revert a feature, you need to use your version control to group (ie. squish) code into features they can can be easily reverted. Look up the GIT Branching Model [1]. It's a good place to start when thinking about organizing your versioning to control releases. * You should be able to deploy from any point in your version control. Make sure your deployment system is able to deploy from a hash, tag or branch. This gives you the option of "reverting" by deploying from a previously known good position. I would highly suggest automating deployment to generate timestamp tags into the repo for deployment so you can see the history of deployments. * Try to make your deployments idempotent and/or separate your state changes so they can be independently controlled. If you have migrations, make sure they can withstand being deployed again, ie. "DROP TABLE IF EXISTS" then "CREATE TABLE", so redeploying doesn't blow up. If you need to roll back, you can rollback as much as you need to the point you want to deploy. A trait of a well designed system is it needs few state changes to add new features and/or those state changes can be easily controlled. * Have a staging system(s). You should be able to deploy to a staging system to verify the behavior of a deployment. It should be able replicate the production every way except in data content. Ideally, should also build this from scratch every time so that you can guarantee if production dies hard death you can completely reproduce it. A great system will also do this for production, bring it up for final testing, and then you can switch over to it once tested. Notice the trend here is to breakup the dependences between how, what, and where code is deployed so that have many ways to respond to issues. Maybe the solution is small enough to just make fix in the future. Maybe it is create an emergency patch, test it on a new production deployment and then switch over. Maybe it is so bad you want to immediately deploy a previous version and get things running again. All of these abilities depend on building your system such that you have these choices. [1] https://nvie.com/posts/a-successful-git-branching-model/ https://nvie.com/posts/a-successful-git-branching-model/
- SkyLinx 7y agoI deploy to Kubernetes with Helm, so I just do an Helm rollback.
- technological 7y agoYou can do rolling deployment. Setup environment with previous version of production code (which does not have issue) and then using load balancer switch the traffic to this new environment
- wwweston 7y agoOnce automated this feels like the simplest approach, and it lets you temporarily suspend the continuous integration between source repo and the application if that turns out to be useful in managing response to an issue.
- billconan 7y agoeach of my deployments is a zip file. I just redeploy with an older zip
- antoineMoPa 7y agoHow do you manage data migration?
- billconan 7y agoMy database is relative stable. I'm also using mongodb, it has some flexibility.
- DoubleGlazing 7y agoMy almost universal experience has been to simply do a Git revert and let the CI pipeline do its thing. Pros - It's simple. Cons - It's slow, especially in an emergency. My last job had an extra layer of security. As a .net house all new deployments were sent to Azure in a zip file. We backed those up and maintained FTP access to the Azure app service. If a deployment went really wrong and we couldn't wait the 10-20 mins for the CI pipline to process a revert, we'd just switch off the CI process and FTP upload the contents of the previous last good version. Of course, if there were database migrations to deal with then all hell could break loose. Reverting a DB migration in production is easier said than done especially if a new table or column has already started being filled with live data. To be fair though, most of the problems I encountered were usually as the result of penny pinching by management who didn't want to invest in proper deployment infrastructure.
- jekrb 7y agoAt the agency I used to work for, we used GitLab CI/CD. We were able to do a manual rollback for each deployment from the GitLab UI. https://docs.gitlab.com/ee/ci/environments.html#retrying-and-rolling-back https://docs.gitlab.com/ee/ci/environments.html#retrying-and... Disclaimer: I work at GitLab now, but my old agency was also using GitLab and their CI/CD offering for client projects for a couple years while I was there. At that agency they have even open sourced their GitLab CI configs :) https://gitlab.com/digitalsurgeons/gitlab-ci-configs https://gitlab.com/digitalsurgeons/gitlab-ci-configs
- folkhack 7y agoGitLab CI/CD is amazing. I run a private instance on a VPS with a single worker (probably the simplest setup you can imagine) and it's astoundingly powerful. I can't say enough great things about it - solutions like Jenkins and Travis CI just feel antiquated and clunky anymore. I always thought it wouldn't really be worth it to run CI/CD on my personal projects due to the complexity inherent in setting these solutions up until I saw the light... I had a coherent "one-click" deploy setup from scratch within an hour with GitLab.
- gingerlime 7y agoI'm curious about the difference. Jenkins, ok. Sure. But in what way are Travis/CircleCI/Semaphore vastly different from Gitlab CI/CD? honest question.
- folkhack 7y agoRight on. GitLab has everything right there for me from SCM, to it's own Docker container registry, to static site hosting capabilities (think generated documentation), issues management, etc etc. I've tested the setup of many of them and GitLab was the quickest/easiest/most configurable. What GitLab gets right is having TONS of enterprise-quality solutions available to you in _one place_... for 100% free as their community offering is AMAZING. That's insanely valuable to me as a startup engineer who doesn't have the time to run 4-5 disparate solutions that are difficult to integrate in a secure/simple way. Having one solution for the above list has been a "game changer" to me because I've got one monolith piece of software to keep updated/manage vs. stringing a whole bunch of solutions together - and I say "monolith" in a 100% positive context =) Then there's just the speed issue... I did DevOps at a huge mega-corp not long ago and the expectation of "major things to get done" was 3-4 things a week. Now that I'm doing my own startup my expectation on my self is 3-4 major things _in a day_. GitLab is the only tooling that I can imagine keeping up with me with near-zero BS, and because of that I'm a _huge_ brand advocate for them! (Not directly affiliated, just a passionate user!) All-in-all I understand people have different tools and that's totally cool, but I did a lot to test out different CI/CD tooling and GitLab was amazingly simple, secure, and quick to setup. Check out for a solid feature comparison: https://about.gitlab.com/devops-tools/travis-ci-vs-gitlab.html https://about.gitlab.com/devops-tools/travis-ci-vs-gitlab.ht...
- helloguillecl 7y agoBefore implementing CI with containers I used to deploy using Capistrano. One thing I loved about this setup was that in case of needing to rollback, I would just run a command which would change a symlink pointing to the previous deploy and restart. All usually done in a couple of seconds.
- elliotec 7y agoClick the button, revert master, then fast follow with a fix.
- folkhack 7y agoI have multiple strategies because I've got one foot in Docker and one foot in the "old-school" realm of simple web servers. Code rollbacks are simple as heck - I just keep the previous Docker container(s) up for a potential rollback target, and/or have a symlink cutover strategy for the webservers. I use GitLab CI/CD for the majority of what I do so the SCM is not on the server, it's deployed as artifacts (either a clean tested container and/or .tar.gz). If I need to rollback it's a manual operation for the code but I want to keep it that way because I am a strong believer in not automating edge-cases which is what running rollbacks through your CI/CD pipeline is. Also for code I've been known to even cut a hot image of the running server just in case something goes _really_ sideways. Never had to use it though, and I will only go this far if I'm making actual changes to the CI/CD pipeline (usually). The biggest concern for me is database changes. You may think I'm nuts but I have been burnt _sooooo_ bad on this (we were all young and dumb at one time right?)... I have multiple points of "oh %$&%" solutions. The first is good migrations - yeah yeah yell at me if you wish... I run things like Laravel for my API's and their migration rollbacks can take care of simple things. TEST YOUR ROLLBACK MIGRATIONS! The second solution is that I cut an actual readslave for each and every update of the application and then segregate it so that I have a "snapshot" that is at-most 1-2 hours out of date. Have redundancy to your redundancy is my motto... and although my deployments take a 1-3 hours for big changes (cutting hot images of a running server, building/isolating an independent DB slave, shuffling containers, etc.) I've never had a major "lights out" issue that's lasted more than 1hr.
- bdcravens 7y agoOur app is in ECS, our database in RDS. I'd roll back to a prior task definition, and if absolutely necessary do a point in time restore in RDS. (I tend to leave the database alone unless absolutely necessary but our schema is pretty mature)
- nodesocket 7y agoWith Kubernetes and deployments simply: kubectl rollout undo deployment/$DEPLOYMENT
- sodosopa 7y agoDepends. For base code moves we restore from the previous release. For larger things like websites we use blue green deployments.
- crb002 7y agoLiquibase
- mnm1 7y agoBuild previous working version. Deploy to elastic beanstalk. Rollback any migrations. Fix the issue and redeploy at leisure.
- aasasd 7y agoA place I worked at had a symlink pointing to the app directory, and a new version went to a new dir. This allowed us to do atomic deployments: code wasn't replaced while it's being run. A rollback, consequently, meant pointing that symlink to the older version. For the database, during a migration we didn't synchronize code with one version of the db. Database structure was modified to add new fields or tables, and the data was migrated, all while the site was online. The code expected to find either version of the db, usually signaled by a flag for the shard. If the changes were too difficult to do online, relatively small shards of the db were put on maintenance. Errors were normally caught after a migration of one shard, so switching it back wasn't too painful. Database operations for the migrations were a mix of automatic updates to the list of table fields, and data-moving queries written by hand in the migration scripts—the db structure didn't really look like your regular ORM anyway. This approach served us quite well, for about five years that I was there—with a lot of visitors and data, dozens of servers and multiple deployments a day.
- wy35 7y agoSince you mentioned symlink, does that mean you have each production version of the app on the same machine?
- twunde 7y agoTypically yes. This pattern was more common prior to containers and I think built into Ruby's Capistrano. The main benefit is that rollbacks were _quick_ especially compared to kubernetes or ecs
- aasasd 7y agoNot ‘each,’ but a few recent versions. Not sure what you mean by ‘on the same machine,’ though. It's not like we flip server roles between releases. Multiple backend servers all had those several versions of the backend code, and the machines serving the frontend stuff had corresponding versions of that.
- ransom1538 7y ago"A place I worked at had a symlink pointing to the app directory" This is the way to go. Have your root web directory be a symlink. EG. /var/www/app -> /code_[git_hash]/ You can whip through a thousand vms less than a second with this method. Connect, change the symlink. Other options: Pushing out a new code branch, reverting with git, launching new vms with reverted images, rsync'ing with overwriting -- is slower, and more dangerous with prod. "For the database, during a migration" There is no such thing as a database migration on prod. There is just adding columns. Code should work with new columns added at any point. Altering a column or dropping a column is extremely dangerous.
- faissaloo 7y agoI don't rollback unless it's for work, I just take the time to fix it, the site can stay down for as long as it needs to.
- m00dy 7y agoI rollback by deploying previously tagged docker image.
- ericol 7y agoWe have a rather simple app that we manage with Github. When a Pr is merged into our main repo's master branch it gets automatically deployed into production. whenever we need to roll back something we just use the corresponding Github feature to revert a merge, and that is automatically shoved into production using GH hooks and stuff. Again, we have a rather easy and ancient deploy system, and it just works. We do several updates a week if needed. We try to avoid late Friday afternoon merges, but with a couple alerts here and there (Mostly, New Relic) we have a good coverage to find out about problems.
- ralusek 7y agoCtrl + Z. Hit me up if anyone hiring Dev Ops.
- rolltiide 7y agoRollback the master branch and deploy that again. Similar to "clicking the button in heroku"
- WrtCdEvrydy 7y agoDepends on the issues. 1) Issues that cause a complete failure to start containers will fail healthchecks and are auto rolled back in our new CI/CD flow. 2) Issues that are more subtle are manually rolled to one back hash until it goes away (then we create a revert branch from that diff between HEAD and WORKING).
- karka91 7y agoAssuming this is about web dev. Nowadays - flip a toggle in the admin. Deployments and releases are separated. Made a major blunder? In kubernetes world we do "helm rollback". Takes seconds. This allows for a super fast pipeline and a team of 6 devs pushes out like 50 deployments a day. Pre-kubernetes it would be AWS pipeline that would startup servers with old commits. We'd catch most of the stuff in blue/green phase, though. Same team, maybe 10 deployments a day but I think this was still pretty good for a monolith. Pre-aws we used deployment tools like capistrano. Most of the tools in this category have multiple releases on the servers and a symlink to the live one. If you make mistake - run a command to delete the symlink, ln -s old release, restart web server. Even though this is the fastest rollback of the bunch the ecosystem was still young and we'd do 0-2 releases a day.
- Shalle135 7y agoWhy not canary releases? You can load balance for example 1% of the traffic to the new deployment and see if you experience any issues. If you do - you just change the loadbalancer to use the known good pods.
- pojzon 7y agoHow you take care of DB updates when using cannary deployments ? For example those which are not backwards compatible ? Ps. Releases are about building new versions of code packages. Deployments about pushing them out to environments.
- bpicolo 7y agoBest way is to not write forwards / backwards incompatible database changes.
- karka91 7y agoThis depends a lot on the databases used and flexibility of the code that's accessing the data. One method is to deploy in multiple stages and to use views. In pre-deploy you create a view with schema/data needed for the release. In deploy stage you roll-out the canary code. In post-deploy stage remove either the old data/schema on success or new data/schema on failure. It's quite an overhead to implement and maintain this process.
- MaxGabriel 7y agoFor our backend, we deploy it as a nix package on NixOS, so we can atomically rollback the deployed code, as well as any dependencies like system libraries. Right now this requires SSHing into each of our two backend servers and running a command. If it’s not urgent we’d just revert with a PR though and let the regular deploy process handle it. The frontend we deploy with Heroku, so we deploy with the rollback button or Heroku CLI. Unfortunately we don’t have something setup where the frontend checks if it’s on the correct version or not, so people will get the bad code until they refresh
- adev_ 7y ago> For our backend, we deploy it as a nix package on NixOS, so we can atomically rollback the deployed code, as well as any dependencies like system libraries Same for us, but we use nixpkgs directly over CentOS. Nix is perfect for rollback. It can be done on an entire cluster in seconds. For the DB, We use schemaless DBs with Devs that care about forward and backward compatibility.
- MaxGabriel 7y agoOh, I forgot to add since many people mentioned this: we currently have nothing in place to automatically rollback migrations. So far that hasn’t been an issue, though.
- ksajadi 7y agoSince we run on Kubernetes, rolling back the code is a matter of redeploying the older images. Rolling back database changes is more challenging but usually we have “down” scripts as well as up scrips for all dB changes allowing us to roll database changes back too. We use Cloud 66 Skycap for deployment which gives us a version controlled repository for our Kubernetes configuration files as well as takes care of image tags for each release.
- protonimitate 7y agoSimilar set up here... except our CI doesn't handle "down" scripts, so bad db migrations are roll-forward only. Which.. isn't as bad as I thought it would be (so far).
- KaiserPro 7y agoWE have two things that could need to be rolled back, the app/api and the dataset. The App is docker, so we have a tag called app-production, and app-production-1(up to 5) which are all the previous production versions. If anything goes wrong, we can flip over to the last known good version. We are multi-region, so we don't update all at once. The dataset is a bit harder. Because its > 100gigs, and for speed purposes it lives on EFS (its lots of 4meg files, and we might need to pull in 60 or so files at once, access time is rubbish using S3) Manually syncing it takes a couple of hours. To get round this, we have a copy on write system, with "dataset-prod" and "dataset-prod-1" up to 6. Changing the symlink of the top level directory is minimal.
- savrajsingh 7y agoGoogle App Engine, just set previous deploy to live version (one click)
- Cofike 7y agoWe use Elastic Beanstalk so we just deploy whatever application version we'd like. Honestly not the biggest fan of that strategy because there is at least a 5 minute period of time while the new instances are provisioned and healthchecked that you just need to wait for. When compared to our Fastly deploys which are global in seconds, it leaves me wanting a faster solution.
- nine_k 7y ago100% of my rollbacks were like this: * Deploy new code in new VMs. * Route some prod traffic to the new nodes. * Watch the nodes misbehave somehow. * Route 100% of the prod traffic back to old nodes (which nobody tore down). Rollback complete. In the case of normal deployment, 100% of prod traffic would eventually be directed to new modes. After a few hours of everything running smoothly, the old nodes would be spun down.
- mooreds 7y agoSo all of your new code was completely backward compatible with your old code (in terms of state)? That is, the database didn't care which version was interacting with it?
- nine_k 7y agoYes, it was backwards-compatible for at least one DB migration step. That is, you can roll forward / back the database schema without breaking other code, or roll forward / back the code without affecting the DB. This does take more planning and gradual deployment, but saves the day when it matters.
- ryanthedev 7y agoI mean it's not rolling back or rolling forward. It's just doing another deployment. It doesn't matter what version you are deploying. That's the whole point. My teams go into their CI/CD platform and just cherry pick which build they want to release.
- mooreds 7y agoHow do they know which release to cherry pick?
- ryanthedev 7y agoWe usually tag the release with something. I work for an enterprise. We automated the change control process and integrated it with our CD dashboard. So a quick peak at the dashboard will tell us. Though depending on the criticality of the app. We may only retain a previous release for a specific time period.
- insulfrable 7y agoFlip dns back, keep the old stack around for a few days. The only case that doesn't just work is with db schema updates that no longer work with the previous version of prod, but this is true for any rollback.
- markbnj 7y agoWe revert the bad commit and redeploy. We do this for our workloads on vms as well as those on kubernetes, but it is both easier and faster for the kubernetes workloads.
- mister_hn 7y agoI simply build a new install package and send it to customer or build a new VM and send it to them. Not everything is web-based
- lelabo_42 7y agoWe started using docker and kubernetes not long ago. Every deployement in production must have a release number as a tag. If one element of our environment need a rollback, I redeploy an old image on kubernetes. Its very fast, only a few seconds to rollback and you can do rolling updates to avoid downtime.