So, the key ideas are: - Smaller diameter tunnels. 14' is suggested. This is slightly larger than the deep London Tube lines. - Electrically powered TBMs. T
by Animats 10y ago
So, the key ideas are:
- Smaller diameter tunnels. 14' is suggested. This is slightly larger than the deep London Tube lines.
- Electrically powered TBMs. Those exist. However, often the business end of the machine is hydraulically powered. Musk is probably thinking of going all electric, at least for the cutter head. After all, he has lots of experience with high-torque electric motors.
- Do cutting and tunnel ring assembly simultaneously. Some TBMs already do that. Those exist; they're called double-shielded TBMs.
Issues glossed over:
- Soil variability. Very different techniques are required for different soils. Sometimes the soil has to be "conditioned", adding something to make it solid enough it can be drilled through.[1] This is the biggest practical problem in tunneling. Too much water is the usual problem.
- The back end. TBMs are long machines. The front end does cutting and ring assembly. The back end, which can be several hundred feet long, is mostly material handling. There's usually a two-track narrow gauge railroad behind the TBM, carrying ring segments forward and dirt backwards. It's constantly being extended with new track sections. That's part of the TBM's job.
Here's a good overview of TBMs design, from Machine Design.[2]
[1] http://www.therobbinscompany.com/wp-content/uploads/2014/08/FastEPBAdvance_NAT2014.pdf http://www.therobbinscompany.com/wp-content/uploads/2014/08/...
[2] http://www.machinedesign.com/archive/art-digging-hole http://www.machinedesign.com/archive/art-digging-hole
- erentz 10y agoYeah this is all very odd and everyone is lapping it up. He claims to want to reduce tunneling costs by a factor of 10, but starts by quoting a very high benchmark of $1 billion per mile which is quite easy to beat. Then he reduces diameters to something much smaller than all the expensive mega projects, into the range of something where technology is well established and costs are already 1/10th of his quoted $1 billion per mile. But then for some reason the solution has to involve putting cars into these tunnels. If what he thinks he is on to is viable with cars in those tunnels, it's even more viable with trains carrying 1,000 passengers each coming every 3 minutes. So why aren't we building these subways with trains? The largest part of the problem to solve here for the US is not the technology of tunneling. It's the process of engineering and building infrastructure like this that seems to become way more expensive in the US compared to places like Spain. I do believe he could reduce costs by vertically integrating the whole thing. But then we should ask why don't we do that anyway?
- CodeWriter23 10y agoHe's trying to hit a price point. We're not completely allergic to the $20M freeway bridge that's about 100ft long, and comes with heavy upkeep costs over the long term. So, $100M per mile with Upkeep Lite™ sounds good when making conversation about the topic. Also the $1B/mile is the cost of the Purple Line extension in Los Angeles. Worst case cost no doubt. A real figure nevertheless.
- objclxt 10y ago> So, $100M per mile with Upkeep Lite™ sounds good when making conversation about the topic. Also the $1B/mile is the cost of the Purple Line extension in Los Angeles. Worst case cost no doubt. A real figure nevertheless. The figure is way out. Crossrail in London has a $20 billion total budget (£15b GBP), with 26 miles of tunnel[1]. But the tunnel is only part of the project, several billion is being spent on new regular track and station rebuilds, so the tunneling figure is really closer to $15 billion. That's about $570 million per mile, but the Crossrail tunnels are just shy of 50% bigger in diameter than what Musk wants to build (20.5' vs 14'). And as the FAQ says, "reducing the diameter in half reduces tunneling costs by 3-4 times". LA's tunnel might be costing $1B/mile, but how much of that cost is actual construction versus bureaucracy and mismanagement? [1]: http://www.crossrail.co.uk/construction/ http://www.crossrail.co.uk/construction/
- tomjakubowski 10y agoI don't know where this "$1B/mile" just for tunneling figure comes from. That's certainly not the tunneling cost for any current subway extension project in Los Angeles: all-in (i.e. not only tunneling) estimates for the first phase of the Purple Line extension are at $2.8B for 3.9 miles of heavy rail subway; the full Purple Line Extension is estimated at $6.3B for 9 miles of heavy rail subway. The closest thing is the Regional Connector project, which will be 1.9 miles of light rail and has a budget of $1.8B. But that's the entire project budget. Tunneling costs are only part of it; it's hard to find a finely grained budget, but total construction (including four new underground stations) is budgeted at $1.2B here [1], which is still "just" $600M/mile. [1]: https://mtadash.mlmprojectservices.com/projects/5773#/cost https://mtadash.mlmprojectservices.com/projects/5773#/cost
- ChuckMcM 10y agoIn my fantasies I've got a microtbm which digs a 4" diameter tunnel over to San Jose right under MAE-WEST so that I can pull a fiber right to the Internet :-)
- a_d 10y agoMaybe the explanation for glossing over some of the obvious hindrances (that you and several other commenters wisely point out) is that these projects are not conceived out of an organic need or to problem-solve issues - even though they are projected as such...but, these are projects that are born out of some (unpublished) masterplan/roadmap for learning to establish a colony on Mars. Just learning how to build tunnels is interesting from that respect. The reason that isn't stated is because Musk likes to create projects around a "purpose" and business plan for them to succeed (even if they are retro-fitted - that is, he decided first that it would be important to tunnel, and then arrived at the "why tunnels on earth"). edit: not a new thought. some other commenters already pointed this out. I read those after posting this.
- TeMPOraL 10y agoYeah; come to think of it, any reasonable project of bootstrapping a viable Mars colony with present-era tech would have to involve tunnelling, as it offers many benefits at the cost of only shipping construction equipment and delivering electricity. I could totally believe Elon has Mars in mind with this project.
- espadrine 10y ago> Issues glossed over: Soil variability. … The back end. Good points. And beyond the technical aspects, there's a lot that the FAQ doesn't say about the service: - How do you tell your sled where to go? Does it always go to the same place? If so, do you merge lanes? If you merge lanes, wouldn't there be jams there? If instead you build many parallel tunnels, don't you remove the gains you had from building smaller tunnels, by having many more tunnels? - How is it meant to compete on price or human bandwidth with subways? Surely at 200 km/h you need to maintain space between sleds in case one fails. Plus, the sleds are not large, which limits human bandwidth. Finally, if you have lots of tunnels (at least one for each origin/destination, instead of subways with many stops), you will need to maintain and repair that infrastructure, which will require service tunnels and backup tunnels, which adds to the cost. Another thought: they don't mention how they'll design the tunnel network yet. My guess is that it will be backboned by double circular tracks (one for clockwise driving, the other for anticlockwise), from which you have regular exit/entrance ramps at each stop. The circularity would avoid having a terminus where everyone slows down. Still, any design would have a maximum capacity corresponding to how fast vehicles can exit in the worst case, if they all suddenly decided to leave at the exact same stop.
- hwillis 10y agoTBMs can turn, albeit slowly. Bigger tunnels are not necessarily more efficient than parallel tunnels. Consider changing a 1 lane to a 2 lane tunnel. You can dig two adjacent tunnels, or you can use a TBM that is twice as wide, and therefore has to remove 4x as much material. Even if you can only build 2 or 3 TBMs per bigger TBM, it's a win. The tunnels are still pretty big, and the sleds could be 10' wide and 10' vertical if the tunnel ID is 14'. That's pretty comparable to a subway or bus, and the increased distance between the sleds is made up for by the increased speed.
- elif 10y ago>How do you tell it where to go? the giant ipad on the dashboard of your tesla, or your phone otherwise. >If you merge lanes, wouldn't there be jams there? If instead you build many parallel tunnels [etc] because if the increased speed, one lane is the equivalent of about 2.5 highway lanes in terms of throughput per hour. Regarding safety distance, I think you can actually safely achieve smaller spacing with a roller-coaster style mechanism than with tires on asphalt. I would say that as well is a 2x throughput multiplier. So parallelization seems largely unnecessary. >How is it meant to compete on price or human bandwidth with subways? ok so take an 8 car subway train with 40 people per car on a 10 minute interval. 8 * 40 * 6 = 1920 people per hour travel from A to B. then take sleds each containing a car with 2 people, paced 300ft apart traveling at 125mph. that is 2 people * (125mph / 0.0568182mi) = 4400 people per hour
- ferongr 10y ago>he has lots of experience with high-torque electric motors. From where?
- TeMPOraL 10y agoTesla, obviously.
- ferongr 10y agoElectric car motors are not anywhere near high torque. They're mostly designed for high speeds and go through a reduction gearbox (in addition to the reduction of the differential itself). Furthermore, the motors in Tesla cars are pedestrian in design.
- Animats 10y agoTesla pioneered mass-produced liquid-cooled electric motors. Those were rare before Tesla. Now they're much more widely used. Tesla was forced into that technology. The original Roadster had a two-speed transmission and an air-cooled motor. The huge jolt on the transmission when it shifted during acceleration wore it out in months. So Tesla had to develop a motor with a wider power range that would fit in the original space. That forced them to liquid cooling. Previously, liquid cooling an electric motor was considered unnecessary complexity; just make it a little bigger and use air cooling. Now, it's common for electric cars and is being used for electric powered aircraft.
- ferongr 10y agoLiquid-cooled motors are widespread in many applications already and technically it's not something complicated. Furthermore, high torque, multi-pole motors (assuming you want to direct-drive a cutting head moving at 2-4 RPM) have little to do with with the kinds of motors used in cars.
- scirocco 10y agoFor someone interested in tunnel projects whose budget has gone overrun: Hallandsåsen in South Sweden. Mudy soil made for difficult digging. https://en.m.wikipedia.org/wiki/Hallands%C3%A5s_Tunnel https://en.m.wikipedia.org/wiki/Hallands%C3%A5s_Tunnel
- johnlbevan2 10y agoFor the soil variability, is that hit when the TBM gets to a bad patch, is some kind of geophys carried out beforehand, or are there probe TBMs? I suspect having mini TBMs which go ahead of the main machine, boring small tubes would be an effective way to give feedback on what's coming up; avoiding nasty surprises / helping to prepare ahead of a change of soil type.
- Animats 10y agoSoil testing by drilling small vertical test holes with well-drilling equipment is routine. This would be essential in Los Angeles, which is a mountain range covered by sedimentary basin fill. Here and there the mountain range peeks above ground, which is why you see some rock outcroppings in mostly flat LA. The mountain range is still there, underground. It is well-mapped. LA used to have an oil industry, with oil wells all over the city. So the underground has been explored and studied by the oil industry. UCLA has been studying Los Angeles area geology since the 1920s. Exploring horizontally has been done for a few projects that lack vertical access. Eurotunnel drilled the service tunnel first. Some mountain tunnel projects in Japan did horizontal test bores. You can't do this directly ahead of the main TBM without interfering with the main dig.
- jaclaz 10y agoJFYT, that is a technique widely used, but normally not on tunnels that are (final diameter) TBM excavated, only or those that are excavaed through more traditional means (explosives/excavators). Basically if you want to excavate a tunnel (say) 12 m in diameter, you first bore a tunnel with a much more small TBM, typically 3.6 m in diameter. This pre-bore provides three great advantages: 1) Ventilation of the tunnel during the enlargement is greatly simplified 2) You have a very sensible saving on explosives (if explosives are used) or however faster excavating times (because a large part of the amount of explosive is needed to "start" the demolition of the rock, i.e. pull the center "core" out) 3) From the pre-bore you can (when you encounter problematic terrain) drill radial holes for consolidation of the surrounding terrain (though cement injection or other similar techniques) If the final diameter is TBM excavated as well, #1 advantage above is only partial, #2 is almost non-existing while of course #3 remains, BUT, you cannot make the pre-bore much smaller than the 3/3.6 m diameter as otherwise it would be only useful as a geo prospection mean, as it wouldn't be practical to use it for anything else, and there would surely be issues (for smaller diameters) with ventilation. AND the other bad news are that - more or less and as a first approximation - a TBM has an operative tunnelling speed of roughly 400 m/month that is almost independent from the diameter (while a traditionally excavated tunnel is more around 100 m/month without pre-bore and 120/130 m/month with the pre-bore), so while it may make sense (of course a lot of factors are involved), if you have a 4 Km tunnel to make a pre-bore that will add roughly 12 month to your 50-60 months project excavation time (traditional), it won't make much sense unless for other very particular considerations to add those same 12 months to the 12 months a full face TBM would take. What is often done on full face excavated tunnels with TBM is prospection holes (horizontal, drilled from the face of the TBM) in the 30-50 m range, to explore what lies ahead in the immediate future.
- tpurves 10y ago"- Soil variability. Very different techniques are required for different soils. Sometimes the soil has to be "conditioned", adding something to make it solid enough it can be drilled through.[1] This is the biggest practical problem in tunneling. Too much water is the usual problem." Too much water won't be a problem on Mars... where I think the end-game here is for Musk on why he's learning how to build tunneling machines.
- Animats 10y agoFine, dry sand is also a problem. It leads to "over-excavating"; you keep digging and removing material as more slides down. You either get a big unwanted cavern that has to be supported, or break through to the surface.