4 ms·
This seems terribly fragile and ad-hoc. It doesn't even take into account sampling rate and it clearly depends on it. I guarantee there are better methods.
by IshKebab 11y ago
This seems terribly fragile and ad-hoc. It doesn't even take into account sampling rate and it clearly depends on it.
I guarantee there are better methods.
- vajrabum 11y agoThat's exactly right. They are heuristic. Control charts were designed to be used on a manufacturing floor by workers who updated their charts manually on paper and called an engineer to aid in further investigation when a manufacturing process might to be out of control. Making out of spec parts or having an expensive machine break because it's operated outside it's limits cost real $$ so some false positives on a low frequency signal can be worth it. Also manufacturing engineers or QC would be responsible for the frequency of testing and sampling procedures so it's unlikely to be as naive as you might assume from the outside.
- sevensor 11y agoIt is terribly fragile and ad-hoc. It depends on what you're trying to detect, but the control charts in the OP produce a maddening number of false positives. I had a job that, for about six months, consisted almost entirely of adjusting control limits by hand so the false signal rate would drop.