4 ms·
>This should be contrasted with the originally envisioned costs of $118 per kilogram (approximately $53 per pound) of payload in 1972 dollars ($1,400/kg, [appro
by anovikov 13y ago
>This should be contrasted with the originally envisioned costs of $118 per kilogram (approximately $53 per pound) of payload in 1972 dollars ($1,400/kg, [approximately $630 per pound] adjusting for inflation to 2011)
Please check these figures. Whatever measure of inflation i try i can't see 12x inflation from 1972 to 2011. It was more like 4x.
Launch rate - correct, problem was Air Force which first dictated the oversized payload capacity and even more oversized payload bay dimensions, and a huge cross-range capability (to enable single-orbit missions), resulting in a system too big and expensive for anything else, then pulling out resulting in vastly lower launch rates. So Shuttle was commercially doomed long before its first flight. U.S. would be better off flying it a few times to prove it works, then getting back to drawing board to design something fitting the market better. Reusable launch systems have been, and still are, realistic, it's only epic fail of Shuttle which make it look too toxic to anyone to try (just like failure of GM EV1 delayed electric car revolution for a decade - nobody dared to try, engineering and business failure of a particular project was mistaken for the whole idea being bad).