How should I behave as a developer in a project that's headed for failure?
- Create 13y agoJust be aware of the stuff below: http://www.ribbonfarm.com/2009/10/07/the-gervais-principle-or-the-office-according-to-the-office/print/ http://www.ribbonfarm.com/2009/10/07/the-gervais-principle-o...
- Nursie 13y agoBe professional. State your concerns to your manager, and probably a level up as well. Make it clear that you don't have any confidence in the project as planned and you think that the cause is a hopeless one. Then (assuming you want to keep working there, as the author seems to) make it clear that if they still want to go ahead then you are fully committed to helping them to the best of your abilities. But a project in as bad a state as described? Get another job.
- adamrneary 13y ago+1. Communication and professionalism are your best bet, here. It's amazing how often engineers think the managers know all these things, as if they've mentioned it a million times, but no one is listening. Sometimes the problem is that the issues are communicated, but not the severity. So, you might raise that the database is too complex with 100+ tables, but if the manager does not have an intuitive sense for the consequences of that problem, it might not register as a project-destroying issue. That becomes the disconnect later, and when things go pear-shaped, these disconnects become issues of contention. The worst thing you can do is to raise these issues quietly and just keep trucking, as if you've done your job, and that's that. [wiping hands gesture] If management doesn't realize that the project is headed for disaster, that's on you (and the others on the team). But, if you're able to convey the severity of these issues clearly and professionally, the conversation might turn to what can get done in the near term that would be valuable. Or, to the point of other commenters, there might be other factors at play, and the manager might want you to keep trucking anyway. In this case, provided you have been clear about the risks and threats, you really have done your job. As a parting thought, you could also raise an issue around "what type of company" you want to work for. Perhaps if they need to rock out a rough proof of concept with no automated testing (or any testing!), that's one thing, but I wouldn't want to work at a company that doesn't take testing seriously. So perhaps if this is a manic sprint to prove something, we can all get on board with cowboy coding, but once the dust settles, it will take x amount of time to shore up the work with xyz types of tests. If they aren't on board with taking their medicine and putting the right tests in place, then that might be reason to depart even if the proof of concept succeeds.
- sageikosa 13y agoThe downside to such a strategy might be that the reason for the impending failure is the manager, and/or the level up as well. Most organizations operate (and should operate) according to what the top-level decides should happen. If the top-level defaults on that responsibility, then chaos will ensue. In those cases a value judgment of the process is a value judgment of the organization, and most astute managers realize it sometimes before the "innocent" (i.e., socially naive on organizational dynamics) system builder guy realizes it.
- Nursie 13y agoWell yeah, the reason I mentioned the level up is that sometimes your manager is the problem, and sometimes your manager isn't telling the business about the problem. If both of those are part of the problem (don't worry! All is well!), rather than realistic (we know there are serious problems here but we think there's a chance/we'd like to try anyway), then it's time to think about the systemic problems and consider finding yourself a new job (IMHO).
- edw519 13y agoChoose from 2 extreme alternatives: a. Treat this project as if it were your sick child on life support. b. Treat this project as if it were a gazelle being ripped apart by a pride of lions. If you choose (a), do anything and everything you can to save it. Be open and sincere and stop at nothing. If you choose (b), prepare a resume and run the other way. No sense risking your own well-being on a lost cause. The worst thing to do would be to make any choice in between these two.
- Trufa 13y agoI think you should post that comment as an answer, it is very graphical but helpful!
- epidemian 13y agoSeconded. I don't think the accepted answer is strong enough nor a very sound advise.
- ghaff 13y agoIt's deliberately dramatized but I don't really see it as wrong. Here's how I would (less dramatically--and less interestingly)phrase the choices. a.) If you're sure there's a path to success and you're invested in getting there, do whatever you can to achieve that goal--understanding that one of the possible outcomes is to be told to pack your things and leave. Now. The likelihood of this outcome obviously depends on the exact situation. b.) Accept that things are not going to end well. Do your job, keep your head down, and start seeking alternatives ex post haste. In some situations, seeking alternatives ex post haste may, in fact, involve fleeing (especially in a short time horizon such as this one) but I've certainly been in situations where the writing was more or less on the wall but more in the vein of a long ponderous collapse.
- brudgers 13y agob.) Accept that things are not going to end well. Fresh gazelle is delicious. Try not to overeat. There's a whole heard, and the pride will catch another one tomorrow. It's all a matter of perspective.
- deleted 13y ago[deleted]
- krumiro79 13y agowork hard, complain hard.
- harryf 13y agoIn a culture like that appears to be, it's pointless to be that guy screaming about the upcoming iceberg. No one will listen. Far better to be the guy with solutions once fail happens. Frankly this sounds like the sort of environment where introducing scrum would be a big step forward. As the developer, knowing a good scrum consultant to introduce to the company might be a good move, once the fail happens.
- 6d0debc071 13y agoIf it were me, I'd ask for reassurance on my concerns, and if that didn't lead anywhere I'd start looking for another job.
- smackay 13y agoI'd be hesitant to raise concerns, on what appears to be a relatively small project, in case you become the scapegoat and a way for either the manager or your colleagues to point the finger at you for not being a team member and hence the reason the project failed. Since it's only 6 weeks to the deadline it is probably worth pitching in and trying to make it work. If failure is going to be a big deal then you'll all be looking for jobs anyway. Alternatively it might turn out that the deadline was not so crucial and you will be able to sort out the mess. Always remember that rats are first to desert a sinking ship - you don't want to end up with being labelled as such.
- ctdonath 13y agoThe rats are first to know what's going to happen because they're deep in the bowels of the system - dirty, dank, ugly, but know the real story. Looking for and taking an exit can be the smart move if you know the boat is going to sink. Being upset at being labeled a "rat" means you're alive. This pervasive "don't raise concerns or you'll get targeted" is all too often WHY projects fail: people keep telling the decision makers "everything is fine, we'll deliver on time" while mumbling "ain't no way this thing's gonna make it" in dark corners, leaving those with the power to do something about it unaware of the problem approaching, and looking for heads to roll when it does. If you're going to be punished for speaking up (objectively, professionally) then it's time to get out of a toxic environment.
- smackay 13y agoI completely agree. It is the short timescale that makes toughing it out worth considering. If the project had several months to go and not just six weeks then speaking up or getting out would be the correct courses of action. From the problems described in the OP it seems unlikely any fixes can be applied to avert disaster.
- deleted 13y ago[deleted]
- michaelochurch 13y agoHonest, "be slightly evil" answer: say absolutely nothing. Just work. Get done what is asked of you. When you have free time (which you often will, due to the chaos as things start to shake) use it to build skills for your next gig. People will probably lose jobs. Sometimes that will happen based on seniority and sometimes it's just random. Sometimes, that will happens to the PITAs who spoke up and happened to be right. You don't want to be a PITA. PITAs become blame dumpsters even when they were right, because enough people hate them and no one will defend them. You're not the only one who knows that the project is fucked. Just keep your mouth shut about the fact. There's something I call the Welch Effect, which is that the people most likely to be laid off are junior/least-established members of macroscopically underperforming teams (who had nothing to do with its underperformance, because they had no power). Managers are sometimes sympathetic to the Welch Effect and will set a "no infanticide" rule, but not if you're a PITA. Keep your head down, do good work when work is asked of you, and start planning for your next move. Start networking and searching and building skills now, not when you need to. If you lose your job, don't take it personally. It's not your fault, and if you tell the story in the right way, no one will hold it against you. These things happen to good developers, especially early in the careers, all the time. Most projects fail. It's not like school where something has to be going wrong to fail a course, because only 5-10% get F's. It's probably 50-75% of software projects that fail.
- cateye 13y agoWith this behaviour probably you will survive this project but in the long run, you will be wasting your life and maybe miserably unhappy in the end.
- addandsubtract 13y ago"Do as you're told" and "Don't talk back" are probably the worst "rules" I've been taught in US grade school. Following that mentality will net you exactly this: a miserable and close-minded life. DO voice your opinion and professional expertise. DO make recommendations as to how to salvage or improve a project. Not doing so will not get you anywhere.
- cateye 13y agoIf you are the only one that is seeing the upcoming failure, this can mean 2 things: 1) You are wrong and paranoid. The project will be delivered with some hurdles but will not be catastrophic at all. Try to make sure that your concerns are clearly defined. Contrary to most people here advise: don't try to be the nice guy by being subtle. Be polite but be also confronting. 2) You are right and you will not be able to change the situation. In this case, I would choose the easy way and leave for another job. Watch out for the stockholm syndrome: there are other companies where you can enjoy your work. Don't feel to much sympathy for the current situation or be afraid of uncertainties that come with leaving.
- martin-adams 13y agoSometimes it's hard communicating the situation to a manager as opening that pandoras box can end up meaning you spend more time giving status than doing the actual work. But not communicating is not going to help anyone, unless you feel confident that you can get the project back into shape. So the deadline is missed. It happens. The stakeholders need to be prepared and they need to have runway to take action. Finding out in the final week then being asked to train up 10 new contractors is not going to work. Managers know that it doesn't work, but more often than not they feel that is the easiest way to help. You shouldn't give up your personal time unless you feel there is some reward, otherwise you will just feel bitter and leave the company in the next crisis. I gave up a lot of personal time to save a project. I did it for my own credibility and passion, but money, time off in lieu and promotion are the rewards that keep employees. I got one week off (after giving 5 weeks of personal time), and £250 of vouchers (but only if during this crisis, I worked a Saturday on someone elses project). I left that job within 12 months. If anything else, you'll learn the experience of what works and does during crunch time.
- euroclydon 13y agoIf a project is so obviously in bad shape, management should be aware, otherwise they are incompetent. Therefore there is nothing to be gained by telling them it's messed up. Typical business time-frames do not allow for an entire team to start over on a project. Going rouge and creating an alternative solution is an option if the developer feels strongly that there is someone in management who will appreciate a better alternative and only needs a working proof of the idea in order to embrace it, but lacking that confidence, it's probably a waste of time.
- sillysaurus 13y agoCommunicate your concerns in the most concise and non-confrontational way possible up the management ladder. Summarize the risks, but do not try to impose your conclusion on them. Management must always have the choice of what to do, but it is your job to assess and communicate the situation. Use email, so as to leave a paper trail when things go south. I hope future historians will be astonished that all of us chose to accept such insanity without doing anything to change it. Thought experiment: There's nothing stopping this developer from taking the requirements of the project and developing a solution from the ground-up in their language of choice over the course of a couple weeks. The project has been in development for 1.5 months and has 1.5 months to go before the deadline. Their current solution apparently involves relying on a relational database as some kind of programming language or configuration system (100+ tables). There's a good chance that a developer with ambition and talent could singlehandedly deliver a superior solution within a short timeframe. So what stops the developer from executing? Primarily his own (fully justified) fear of negative consequences. But the only reason his fears are justified are because of structural problems in how companies operate today: managers are expected to drive the direction of the project and are given the authority to do so, and the authority to fire anyone who won't go along with the manager's vision. That makes it impossible for a developer to make sweeping changes and be perceived as doing anything but challenging the manager's authority. But it's not about authority. It's about the customer. It's about making good products. Yet the environment is set up so that the developer concludes that it's entirely justified to be afraid; to sit quietly and do nothing. And it's precisely this collective fear that drives this sort of degeneration within companies. There has to be something better. I want to try to build something better. Some new way of thinking about how to build a modern software business. Profit sharing, maybe. It might be possible to set up a company such that it could pay its employees a percentage of the profits. The first employee would get 15%. The next employee would get 7.5%, and the next 3.75%, and so on. Then as the company makes profit, that profit is continually paid out proportionally to each employee. That system has all sorts of flaws, though. One example: an employee should only be getting a percentage of profits while they're at the company. They should be getting their full percentage on day one, and should give up their percentage on the day they leave the company. But I can't think of any mechanism which would actually let a corporation pay out like that. If you tried to pay out profit via dividends, then you'd have to allocate the percentages using stock, and employees don't typically get stock up front on day one -- it takes several years to vest -- and they don't lose it when they leave the company. So profit sharing via dividends wouldn't work. The idea is to provide an incentive to employees for projects to be useful to customers. There's currently no incentive. Employees are generally expected to play the politics/career game in order to secure a safe future for themselves. I guarantee you that if the employees at OP's company had been given some percentage of future profits, then they would currently be revolting and calling out that manager's behavior and incompetence.
- kyllo 13y agoIn fact, we actually just inherited this project (along with the mess) around 1-2 month ago from another dev team under the same manager, who have worked on it for a few month. That seems like a serious red flag to me. That manager's career is probably headed nowhere fast...
- patmcguire 13y agoPutting an entirely new team on an existing code base is madness.
- kyllo 13y agoYeah, everyone who's actually worked on a software project knows that reading code is harder than writing it, so just understanding the existing code (which is almost certainly under-documented and under-tested) will be more than half the battle.
- edderly 13y agoI would recommend Yourdon's book, "Death March" as mentioned in one of the answers. Although it feels a little dated it is a well reasoned analysis that at worst can give you perspective on a bad situation. When I was in a true Death March project I was surprised that there are so few books on the same issue.
- GFischer 13y agoNice, I haven't read the book, but I liked Yourdon's book on Structured Analysis (that was the state of the art being taught when I got my degree !!)
- damon_c 13y agoI was recently hired to complete a specific task on a project that sounds similar to this one. On the 2nd day of my involvement and having read through the code a bit, I realized that the task I was hired to complete was the last thing they should be worried about given some of the existential issues in the code and architecture given the deadline. I voiced some of my concerns to the manager of the project. He got upset and defensive. I quit on the spot. I had never done anything like that before but I'm glad I did. It could have been rescued but that would have taken a huge personal effort on my part that I didn't foresee being appreciated.
- jdavid 13y agoIt sounds like this is a 'Kobiashi Maru' Test, which is a no win situation that Starfleet gives to it's cadets. After this project you will have 5 developers, and several managers that will go on to other projects. I'd say half of those people know what you know, and no one knows how to fix it. If you just work hard on the project one of those developers or managers in years to come might come looking for you to join them on an endeavor. Other than school, I think this is how people develop trust in each other. If you choose to stay or go, either way you'll build character. It's up to you to decide if you are the sort that digs in and runs to the fire, or the sort that flees to live another day. NOTE: not everyone succeeds that runs towards the fire, but some do, and some consider them heros. Other's consider them fools.
- powatom 13y agoI was fortunate enough to experience this exact kind of death march over a period of around 18 months. Unless you have the authority to guide the project back on track, there are only so many options available to you: 1: Document your concerns and any problems you've identified. Be objective wherever possible (i.e don't bitch about your co-workers even if the reason the project is failing is because they're fucking it up). Any problems that you've spotted and are worried about, WRITE THEM DOWN and email them to your project manager. 2: Keep a cool head. This is incredibly difficult once endless frustration sets in. Bite your tongue, and don't get personal. You will probably fail from time to time, because knowing that you're going to fail is a horrible, insomnia-inducing feeling, and your patience will almost certainly be tested. 3: Offer solutions. If you think a particular decision is to blame for some aspect of the failure, then document it, what went wrong, and what any alternatives may be. Unfortunately, in my experience and from what I gather from other people, these kind of things tend to come along with ridiculous company politics and emotions. If your gut feeling is that it's going to fail, then your best approach is to try to raise the alarm as soon as you notice. You may be ignored or brushed aside, but you must document everything you do. Don't raise the concerns in conversation, make sure there is a paper trail. In my own case, the project failures ultimately led to me and several other developers abandoning the company. The project could have been saved if our concerns were taken into consideration and acted on. We even presented a proof of concept redesign which solved all of the existing problems AND presented new opportunities for growth, and were told that our new design would not see the light of day. Keep in mind that we had working code, schemas, deployment plans, addressed scalability concerns, and even had a development roadmap for the new design. Some battles are un-winnable.
- ctdonath 13y agomake sure there is a paper trail Unless the situation results in criminal prosecution, when the time comes to use that paper trail nobody will care about it.
- fr0sty 13y ago> nobody will care about it. I disagree. If the company in question is large enough having documentation that you were actively trying to avoid disaster, were competent enough to raise concerns and suggest solutions, etc. can be helpful when people come trying to assign blame after the fact. If the company as a whole will survive the impending train wreck then having evidence of competence, however meager, is certainly useful in many situations short of criminal prosecution.
- forgotAgain 13y agoPlan for the failure. What will things be like when the project fails? How can you best position yourself in the wake of the failure? Take the steps required to see to your own future. Do not get caught up in owing anything to your manager or your employer. Your manager transferred a failing project to your group. He is more responsible for you having this failure hang over your head than you are. To your employer you are simply a resource, not a person. Do not give them the loyalty you would give a deserving person. It will not be reciprocated. In a world where all employees are basically extended freelancers, you need to put yourself first. Failing to plan is planning to fail.
- codeulike 13y agoI found it interesting that his list of reasons why the project might fail sounds like pretty much every project I ever saw in the 1990s and early 2000s. Although some of them are definitely bad signs, some are just par for the course in organisations that arent big on software development. I wouldn't say its a guaranteed failure. He might just be unfamiliar with what real-world projects are like in an enterprisey environment. - deadline approaching many of the must-have features are not finished. - Application is unstable and very difficult to use. - System is very convoluted, code very hard to understand, very difficult to change. - complex relational database (100+ tables). - Unclear leadership, the manager responds to every new information with significant change in plans. - Almost no automated tests or unit test. - Heavily depends on other systems, but no integration tests yet. Perhaps upper management will fudge and extend the deadline (rather than be embarrassed) and the project will limp towards some sort of closure that everyone can just about accept.
- nahname 13y agoEnterprise software development. Plan, plan, plan, plan, execute, fail, extend, extend, extend, deliver. The PMs job is to get the project extended from day 1 because nothing was planned out correctly.
- rquirk 13y agoThing is... a lot of projects seem this way when you're in the thick of it, but towards the end the mess can untangle itself and provide a useful tool/product for someone. > Application is unstable and very difficult to use. Could be that there are a couple of "killer bugs", fix them and it might not seem so bad. Difficult to use is also subjective, people get use to stuff. > System is very convoluted, code very hard to understand, very difficult to change. This could be "I don't understand the code, or know how to change it". > Datamodel is too driven by a complex relational database (100+ tables). OK, this one I can't defend :-P > Unclear leadership, the manager responds to every new information with significant change in plans. Well, if the plans are adding new features, these should go to the "nice to have" list. If it's "we need to rewrite this" then that's not good. > Almost no automated tests or unit test. No autowhatnow? :-D I don't think a project is necessarily "headed for failure" just because there are no automated/unit tests. > Heavily depends on other systems, but no integration tests yet. Yet! That's good, there's still time to test this before shipping. > In fact, we actually just inherited this project (along with the mess) around 1-2 month ago from another dev team under the same manager, who have worked on it for a few month. Aha! The root of the problem "I don't feel comfortable with other people's code"?
- zenlikethat 13y agoInteresting take, in fact recently I was working on a project that I was convinced was going to be a huge mess but in the end out clients seemed fairly happy with it, and understanding on inevitable roadbumps. > OK, this one I can't defend :-P I'm curious as to the why of this? Surely some applications just require a lot of tables as they deal with a lot of [different types of] data?
- rquirk 13y ago> I'm curious as to the why of this? Surely some applications just require a lot of tables as they deal with a lot of [different types of] data? Maybe it's my lack of imagination, but I can't think how you'd create a design with hundreds of tables by hand - it would surely involve generating tables from some other source. For different types of data I'd lean more for a javascripty-style meta-table with key-values, since I bet all that different type of data wouldn't lend itself well to relations.
- dirkdk 13y agoDont be a negative force in the team. No technology exist outside of a business context. Be proactive, take control: cut the project up in parts and focus on those that you can deliver in time. Ever heard of agile?
- sigzero 13y agoVoice your opinion. Do your work. Look for other opportunities.
- alan_cx 13y agoTo come at this from a different angle, throw in some random thoughts, play devils advocate and all that.... What is the definition of "fail"? Maybe, given that the project is a hand me down, just barely working is good enough to the client. Maybe there is accepted scope for an over run. How do you know it will fail? Given my questioning of what a fail is, clearly knowing it will fail is up for grabs. Will the OP's negativity cause it to fail? This bothers me. An employee who is dooming a project is in danger of dragging the whole thing down. Perhaps the OP is prejudging things too much? If the OP "knows" it will fail, the likely hood is that so does every one else. What seems odd to me is the OP's seemingly isolated position, where it looks like he doesn't get to talk to his co-workers or management. If he knows it will fail, then surely so do his co-workers. Management must also know its not progressing. But, he seems unable to discuss this with any of them, even casually. If this is the case, then my concern would be for the future of the whole company.
- joepet 13y agothink about possible outcomes after it will become clear that it failed and think how to adopt to this situation as it's clear already that it won't be easy go
- babebridou 13y agoMy two cents: Ask for proper priorization and focus on completing as many features as possible, one after the other. It's far easier to build one feature while maintaining multiple others than to build multiple features at the same time, especially with a lot of legacy code. If they can't prioritize at this point, insist. Point out that in this situation where everyone is stressed for all the possible reasons, with proper priorization you're far, far more efficient than without. For all you know, you can be done with individual parts within hours if you can safely scratch other, less important features that are also in development, only to take them back up and running the next day as they become in turn the highest priority. If they still can't prioritize at this point, prioritize yourself. If you don't know it already, find a customer relationship contact and ask for one of the main timesinks for the users that the product is supposed to solve. Let him describe to you the usecase, or let him point it out to you in the functional specs, and do it from start to finish. This one has to work, and that's your new goal in life. Be proud when it's completed, your grunt work is done. Show it to your boss, and let him know that's what requires integration testing right now. Your new goal in life now, is to make sure that this usecase is viable in production. You will find new issues, encounter new problems, but these are better problems because they are not entirely up to your team, they are the kind of problems that a lot more people can understand since they are not purely dev issues. You will get a ton more help at this point, a ton more understanding, a ton more visibility on the project, and management will be able to make a much more informed decision about the so-called deadline. The key to proper "failing" of a project is to never let it be a complete failure. Finish a usecase and deliver it, so that at least someone could get added value from what the project committed. This is how the customer & management should prioritize for you: make sure that there are usecases where the product is fully functional from start to finish.
- ap22213 13y agoI've picked up so many of these types of projects, it's sort of become my specialty. The first thing to do is to ask oneself if it's worth completing the project at all. All stakeholders _will_ have to be ready to make some sacrifices; is it worth it? Also, like others have said, communication is key. If the team can't have open conversations up-front, it may be best to walk. But, if the team can communicate openly and most are on-board for an adventure, then there are things that are possible. This is also where a team 're-org' may have to happen, unfortunately. At this point, there may be a huge amount of internal tension that's probably slowing things down. This is a very difficult task, but identify those who have become burned-out and/or antagonistic. Sometimes it's better to cut the team down from 5 to maybe 2-3 instead of adding more people. Is there a 2-3 person team that works most effectively together? The others who are 'cut' will have bad feelings about this. If possible (it usually is), get them on part-time contract and affirm that they are important to succeed (they probably are). Let them cool-off and slow down and mediate conversations with them to use their existing knowledge most effectively. Don't think about the sunk costs. This will just depress you. Instead, think about all that you have (e.g. knowledge, code, documents, connections, relationships) as resources to help you get to a destination. Redefine the destination. Take an honest inventory of your current state and distance to the destination. Where can you realistically get to, with a best effort? Which promises will have to be broken? Which ones must be kept. This is going to irk some people, so it's going to have to be very calculated. Sometimes this means just finding a way to get the ship to a close port, if only just to refuel. If there isn't one, stand up an automated test harness with as many tests as possible, in the shortest period of time. If you can find a 3rd-party tool that's easy to set up, use it. But, you may have to write some throwaway code just to get something working. Don't worry if it takes a day or two to get going, it will be worth it. Shoot for broad tests, rather than unit tests, at first. Divide and conquer; Isolate and build out from the solid parts. Which parts of the system can be hidden behind a black box interface and add value? Which parts of the system are so rotten that they have to be re-written? Slice the system up into pieces and remove the bad ones. Unfortunately, this requires a bit of skill, art, and talent. I most often deal with systems in OO languages. So, it's quite easy to apply a refactoring interface/factory pattern to things. The really rotten parts can even be replaced with mocks for the short-term, if an interface can be defined. Another thing: the Pareto principle. Re-write the 20% of the system that is creating the 80% complexity. Aim for early, easy wins. Shrink the development cycle. Show some forward progress. That will help revitalize the team and add momentum. The gut feeling for a lot of people in this type of situation is to 'brute force' it. People get addicted to 'putting out the fires' But, that's completely the wrong path to take. Come up with a new plan. A plan that can be done with everyone working 40 hour weeks. Let some of 'the fires' burn, but contain them. Don't lose hope, and instead use brains. However, in the end, it is also completely ok to walk away, especially if there's no incentive to continue.
- notacoward 13y agoThey are paying you to do a full-time job, so do a full-time job. No less, no more, and record your time carefully. Remind people, if necessary, that retaliatory termination of someone who is fulfilling their employment contract is illegal. Do what you can to keep that kind of talk from going up the chain any further than necessary - ideally only to your immediate and somewhat sympathetic superior. In "extra" time, start Plan B. Find the parts of the code that might be usable for another project (possibly this one's successor). Make sure their interfaces and dependencies make that easier - which is good software engineering anyway, and can be justified as such if you don't want to explain the real reason. That way you and your employer will both be able to extract maximum benefit from the project when it does fail, helping you both to survive the aftermath. You will be criticized for not committing enough to the project. You might even be blamed for its failure. It's very unlikely that you'll ever get any credit for helping the phoenix rise from the ashes. That sucks, but it's a bad situation all around and you have a duty to try if that's what you think is best for the company in the long term. (P.S. To be perfectly honest, I'd already be out of there if I felt that way about a project, but that's the sort of advice the OP was explicitly not seeking.)
- seivan 13y agoBeen in one too many of these, it often makes you question wether it's your fault, and that is very devastating. Though unknown to most people as soon a project is treated as a project and not your own product, its faith is decided by someone else. You have no input on the stories, estimation and design decision. It's faith is no longer in your hands. They pull the wires, they decide. Hopefully their decision will be good and you'll do fine.
- deleted 13y ago[deleted]
- pullo 13y agoAs everyone said, keep a paper trail and update your resume. It would be even better if you are left out of the finger pointing-' blame circle' on D-day. The project might be doomed to fail but there will be individual tasks that can be completed successfully. Complete these tasks (and your tasks) and present them as your contributions to the win/progress column. If you are one of the few engineers who is getting stuff done, you will be noticed in positive light and it will be harder to throw you under the bus. you cannot stop the inevitable failure of a project, but no where does it say you have to walk towards it. Complete your tasks and just a little more. publicize your minor achievements, and stay out of the politics. this way you can do what is right and remain unscathed when all falls down. Good luck.
- FollowSteph3 13y agoRun around your desk with your arms flailing about screaming then after a few minutes crawl under your desk and go into the fetal position repeating over and over its the end of the world. But no seriouly, if you want to stay at the same company after do what you're asked. Don't burn yourself out. If you're in a position to make change then so it. And if not then fire up your résumé ASAP.
- Choronzon 13y agoEverybody is too focused on the project,the wrong question is being asked here.It should be "How do I PROTECT myself as a developer in a project that is heading for failure." All throwing together weekend solutions will do is waste your private time and put a big target sign on your head,its only worth doing that if you have a fair chance of solving it and you will get the lions share of the credit if you pull it off. Look for other roles internally or externally, protect yourself how you can and emotionally distance yourself from it. Worry about your career not the stupid project.
- gwgarry 13y agoAlso be weary of being blamed for the failure and not being paid.
- chsonnu 13y agoGet some QA engineers to manually test every build.
- larsberg 13y agoOne other possibility is that this developer is experiencing schedule chicken. I'd recommend reporting your time estimates to your lead, giving it the old college try, but going home at reasonable times and not pushing the clock too hard. In some large organizations (I've seen this previously where I worked), the first group to claim that the schedule was unreasonable became the scapegoat for slashing of features. So, everybody would look around and try to get a sense of who was furthest beyond making it and not say anything unless their team was the long pole, since you'd "benefit" from the increased schedule time anyway without the high-visibility hit for failing to deliver. Yes, totally dysfunctional. But, in some orgs, it may be the most realistic (or at least typical) way to save the scope of the project.
- yoster 13y agoWhatever you do, do not act negative in any way whatsoever. People like to point the fingers when shit hits the fan. Try to be as positive as possible about this situation.
- snorkel 13y agoYou should quit. Clearly you don't enjoy working n this and life is too short.
- jakejake 13y agoThe question is interesting but the scenario doesn't sound like that much of a disaster to me. Maybe I'm the only one here who's worked in the insurance business though...?! A 5-person project with 2 months of work plus another 1.5 months to go is not really that big. Maybe at a startup that's betting the whole company. At a large corp that can just be written off. If the deadline is missed, it just gets re-scheduled. This is not a freak-out scenario. The only concern I'd have is letting people know ASAP if you think the deadline is slipping. The other stuff about 100's of tables, no unit tests, other system integrations, etc. that sounds like every project in an old school large corp. In a large corp, as crappy as these apps are, they can go into use internally and process billions of dollars even though they're crappy to use. You then spend the next 10 years improving it.
- SonicSoul 13y agoi had a similar problem in my first real programming job. i was hired along with a very senior person to deliver a project. accept that very senior person didn't know what he was doing (something that was no immediately obvious to me since i was very junior). I panicked, and since stackexchange was not around back then, i went to IRC with a very similar question. I was basically told to stop blaming my problems on others, shut up and just do the job. Really it was an angry response and made me feel like i was stupid for even bringing it up. so i put my head down, and tried to do what it took (while not getting any guidance for the guy). the end result was 3 months of wasted time, the guy getting fired (and he did not see it coming a at all). Somehow i managed to keep my job and eventually being the main person supporting that product. The problem was with management of that place, by hiring new people, and not paying attention to daily progress and direction.
- eyourdon 13y agoOne of the implicit assumptions in this thread is that the developer actually has a choice -- e.g., he can "run the other way" if it's a bad situation. That's likely to be true for developers in the early stage of their career, especially if they don't have a lot of financial obligations (mortgage, spouse, children, etc). And it helps to have a resume and current technical skills that might be attractive to some alternative employer. But I run into a lot of situations where the developer is "trapped" by his/her circumstances -- including the current situation of a lousy economy in which there are few, if any, alternative jobs available. So for many, the relevant question is: what do you do if you're stuck in a death-march project, and don't have the freedom to walk away and get a better job somewhere else? Ed Yourdon
- cfesta9 13y agoYou should treat the project with extra effort. You have 1.5 months to go. This is what you know. You are signed on to a project. The project at hand sucks. The inner politics can not be manipulated. With you knowing all of these factors, maybe there is a way you can change the outcome of the project. At the least you gain something from this project.
- paulhauggis 13y agoI had this issue. I worked very hard to put the project on the right track, but the issue was the person at the very top (my boss) just wound't listen and do things his way every single time. Twice, I worked for months on new features that we discussed and outlined only to have the project be completely re-designed (and 90% of my work scrapped) because he had a new dream or a vision about how the project should look. I eventually quit. It's not worth my time, effort, or sleepless nights.
- dschiptsov 13y agoEverything that doesn't kill you makes you stronger.)
- rikacomet 13y agoApproach A: The more stenous one, which requires a lot of willpower, moral, positive attitude, and undying zeal.. is to point out the mistakes being done, in a respectable and proper manner on proper stage, where everyone can take it in a non-hostile way. This approach assumes that the current leadership is not capable of steering the team out of the wrong path, and since you can see the problem, you are more than ready to take the baton in your hand. Approach B: Stay back, perform at 110% but not 120%, if asked, then give your opinion on mistakes being done, do what is your duty, but don't go '"way" out of your way'. Since people might become hostile to you, and don't care if the ship lives or dies. This requires a cold heart, professional and non-positive. But we have to do this a lot of times, due to the behavior mismatch between co-workers. Sounds bad, but deal with it! That's how it is.
- ashwinaj 13y ago1. Work to the best of your ability OR 2. Leave and look for better opportunities elsewhere
- jaredsohn 13y agoOne thing learned the hard way is that if you are working for a contractor on a project managed by civil servants (especially where the lead civil servant used to work for the contractor), "success" isn't necessarily completing the project on time.
- LarryMade2 13y agoOne, own the project, think of what is the best approach - maybe a rewrite... Fess up, let them know what is wrong (since you aren't the one that created the mess, offer to be the one than can fix it... if you can do...). Do triage examples on what is there, offer solutions to potential problem points, give examples of a more perfect world. Make sure to point out things that worked good ideas (you are going to hurt feelings, but never tell them the whole concept was idiotic. Show there was good effort and value created in the current system - probably the analysis was spot on, and that's when a lot of the problems were realized and now it needs a rework. An excuse wont look good on a resume.
- orangethirty 13y agoThis one hits me straight to the heart. On January of this year I was involved on a big project. The company needed to have a piece of software written with their own custom ReST framework. The framework was/is undocumented, and was still under heavy development. The software I had to build had some requirements, but the actual design was not set in stone. I was given a "technical document" and told to build it as is. Turns out, the document was wrong, and did not follow their conventions of even architecture. I talked with the person in charge and we changed the architecture to have it fit correctly. But the client was asking for ridiculous terms. They were using Python/Gevent to handlea lot of connections at the same time. They had already achieved 3K connectionns in testing, and wanted my software to handle 30K per second. Ten times what they had achieved, in two months. Yeah right! I knew the writing was on the wall. But out of loyalty I decided to stay. I got fucked when the project was cancelled, because I wasn't paid for a months work. I really didnt pursue it because I just wanted to move on from it. And was in a good enough financial situation where that money really wouldnt make a big difference. I did learn a lot from it, and will now cancel a project if it shows signs of too much drama. There is nothing to gain in sacrificing yourself for others who dont appreciate it. The team who hired me? They tried to blame it on me. But their company is so fucked up that they were even the focus of a mayor PR incident during the past months. So much about being a great company to work for.
- raldenhoven 13y agoI don't get why there are so manny comments on the blame game. FIRST! If the project fails, you all fail. Every member is responsible for the succes of the project. SECOND! You're career, you decide at which level you participate. Choosing a carreer path as a developer is great, most of the time you are the last person to work on the final product. This means that most of the time you are directly linked to the final quality, do you want to be known as the person who makes crappy quality? If not don't deliver crappy quality. They might seem very harsh, but there are very few clients who actually understand what you are doing as a developer. They don't hire you for you're code, but because you are part of their solution to their problem. For myself I set a certain level for the endresult, being a developer we are the final ones to touch a product. This means we have to be sharp on every single deliverable someone before us made, if it doesn't meet my quality I am responsible to get it at my desired level. When reading the post it seems like all grip on the client is lost, before doing anything you're team has to regain control. If the client had the knowledge to solve his problem, he would not need you're team. Second you already know you won't be able to finish te product before the deadline (and maybe never, because of the legacy). Not loosing any more money on it might be the biggest success available, development is just one part you are losing at this point and in my experience other roles (like interaction/design/frontend/concept/sales/project management) are also part of the solution (and are able to take more then 60% of a budget). So be part of the solution...otherwise you're part of the problem.
- mortdeus 13y agoYou are pursuing the wrong profession if you think challenging problems and impossible deadlines are anything less than hackers ecstasy.
- angersock 13y agoThere's a difference between problems that are challenging because they're complex puzzles, and problems that are challenging because they're poorly defined or full of bullshit constraints. Asking you to empty a dumptruck with a spoon in four minutes, by your reasoning, is hacker ecstasy (and no, you aren't allowed to threaten the operator with the spoon).
- yekko 13y agoGet the hell out of there, find a better job, always be looking.
- jokoon 13y agoI feel that like 90% of the time, programmers don't really trust the project they're working on, because 90% of those projects are not actually worth a damn.
- TeaLeaves 13y agoMaybe the higher ups want the manager to fail. They've given the manager one team already which failed and now they've given him another team. The poor dev is just stuck in the middle of a power play.
- mmaunder 13y agoI found myself doing consulting work alongside running my startup for a company called The Point that had this dumbass idea to create a "cause" and if enough people joined the cause it would reach some kind of tipping point and the thing would happen. The founder I was reporting to, Andrew, was nice enough, but I had no faith in the idea. My job was to develop a web based widget which seemed to have no reason for existing, but I happily did it anyway and took their money. 3 months later they pivoted, rebranded and today their market cap is $4.9 Billion. 1.5 months is nothing. You probably don't have all the data. Be a big boy, stick it out, do a great job and then politely and professionally move on to your next gig.