3 ms·
The elephant in the room is that the choice today is llm limits. Tomorrow 2 engineers at 50% token time will change to 1 engineer with 100% token time for the
by unified101 2mo ago
The elephant in the room is that the choice today is llm limits.
Tomorrow 2 engineers at 50% token time will change to 1 engineer with 100% token time for the same work.. the latter is too cost effective.