3 ms·
And they’re planning to charge 2.6 cents per mile, per https://wstc.wa.gov/studies-surveys/road-usage-charge/ https://wstc.wa.gov/studies-surveys/road-usage-cha
by odysseus 5mo ago
And they’re planning to charge 2.6 cents per mile, per https://wstc.wa.gov/studies-surveys/road-usage-charge/ https://wstc.wa.gov/studies-surveys/road-usage-charge/
So that’s $364 per year for 14k miles. Vs. the $225 currently paid as an electrification fee.
- seanmcdirmid 5mo agoIt’s capped at $225, at least during the pilot.