I thought one of the whole points behind separate (non-mono)repos was to help enforce loose coupling and if you came to a point where a single feature change re
by eikenberry 2y ago
I thought one of the whole points behind separate (non-mono)repos was to help enforce loose coupling and if you came to a point where a single feature change required PRs on 4 separate repos then that was an indicator that your project needed refactoring as it was becoming to tightly coupled. The example in the article could have been interpreted to mean that they should refactor the functionality for interacting with the ML model into it's own repo so it could encapsulate this aspect of the project. Instead they doubled down on the tighter coupling by putting them in a monorepo (which itself encourages tighter coupling).
- marcosdumay 2y agoThe issue is that you can't "enforce" loose coupling. The causality is reversed here. Your software artifacts will have loose coupling if you divided them well enough on their creation. As soon as they are created, you can't do anything else to change it, except for joining or splitting them.
- eikenberry 2y agoIt's not about enforcement, it's about encouragement and path of least resistance. In monorepos the path of least resistance is tight coupling (unless discouraged in other ways). In 'microrepros' (?) there is added resistance to tight coupling as was presented in the article. This encourages people down the correct path but cannot enforce it (again, as was presented in the article).
- MajimasEyepatch 2y agoIt leads people down a different path, but that's not necessarily the correct path. For example, between the lack of discoverability of separate repos and the hurdle of modifying multiple separate repos, teams might be tempted to duplicate functionality and data instead of figuring out the appropriate relationships between services. Some amount of coupling is normal and reasonable. There are ways to manage it well.
- ted_dunning 2y agoCoupling happens due to other reasons than poor contracts. The discussions from Hyrum Wright from Google about large-scale refactoring are great in this respect. https://www.youtube.com/watch?v=TrC6ROeV4GI https://www.youtube.com/watch?v=TrC6ROeV4GI
- friendzis 2y agoEvery decoupling point is based on certain contract. You can get away with a lot with well thought out contracts and interfaces, but sometimes the contract has to change and then both sides of the contract must change in lockstep. Usually it is possible to isolate changes to a contract, but the overhead is just not worth it most of the time.