> In a 2-1 decision, the FERC found the regional grid operator, PJM Interconnection, failed to prove that the changes to the transmission agreement with Susqueh
by Dylan16807 2y ago
> In a 2-1 decision, the FERC found the regional grid operator, PJM Interconnection, failed to prove that the changes to the transmission agreement with Susquehanna power plant were necessary.
If the standard is "necessary" then you can shoot down anything you want on a whim. No particular connection or plant is ever necessary.
> “Co-location arrangements of the type presented here present an array of complicated, nuanced and multifaceted issues, which collectively could have huge ramifications for both grid reliability and consumer costs,”
...and? This is so generic, and you have even more potential for ramifications if the power has to take a less direct route.
What's the actual meat of the complaint here?