> using renewables and batteries? and they’d have results in 2 years instead of 2 decades We have nothing close to the battery fabrication pipeline to make tha
by JumpCrisscross 2y ago
> using renewables and batteries? and they’d have results in 2 years instead of 2 decades
We have nothing close to the battery fabrication pipeline to make that timeline true, certainly not at scale. If this move works, Google will have cemented its power needs and economics for decades to come.
- iknowstuff 2y agofrequently asserted but not true. https://x.com/DavidOsmond8/status/1843840160842350779 https://x.com/DavidOsmond8/status/1843840160842350779
- JumpCrisscross 2y agoNobody claims renewables + battery doesn't work long term. (And not only work, but do so at rock-bottom costs.) The problem is the timeline. Time out building that additional infrastructure, including expected demand growth, and you always need more power in the interim. Particularly if you're planning on taking coal offline. If there is an arugment that we can ramp up battery production even faster than we are, the math changes. But we're already in a Herculean effort to mass produce more batteries faster.
- pfdietz 2y agoBattery manufacturing capacity is greatly underutilized in China. That was battery cell prices there fell by nearly 1/2 in the last year. There is tremendous room for expansion of production.
- iknowstuff 2y agonuclear literally takes 10x the time to build as renewables+batteries. That's like the whole reason why it doesn't get built.
- sien 2y agoDuring the Messmer plan the French installed 56 reactors in 15 years. https://en.wikipedia.org/wiki/Nuclear_power_in_France#Messmer_Plan https://en.wikipedia.org/wiki/Nuclear_power_in_France#Messme... So you're saying that in 1.5 years the same thing can now be done with renewables and batteries? In 2027 it will easily have been done in a bunch of places ?
- throw0101d 2y ago> During the Messmer plan the French installed 56 reactors in 15 years. Canada (mostly Ontario) built 25 reactors in 35 years: * https://en.wikipedia.org/wiki/Nuclear_power_in_Canada#Power_reactors https://en.wikipedia.org/wiki/Nuclear_power_in_Canada#Power_... From the 1980s to the 2000s, it took Japan roughly 4-5 years between start of construction and commercial operation for a number of reactors: * https://en.wikipedia.org/wiki/List_of_commercial_nuclear_reactors#Japan https://en.wikipedia.org/wiki/List_of_commercial_nuclear_rea...
- adrianN 2y agoStart of construction is many years after start of the project though.
- pfdietz 2y agoAnd now that's not realistic, given their track record on EPR.
- ckdarby 2y agoBased upon? Looked through the thread and it looks asserted but I don't see the counter not true point.
- toomuchtodo 2y agohttps://www.bloomberg.com/news/newsletters/2024-07-09/china-s-batteries-are-now-cheap-enough-to-power-huge-shifts https://www.bloomberg.com/news/newsletters/2024-07-09/china-... | https://archive.is/DklaA https://archive.is/DklaA ("Bloomberg: China’s Batteries Are Now Cheap Enough to Power Huge Shifts")
- matthewdgreen 2y agoGlobal battery manufacturing capacity was 2,600GWh in 2023 [1], and has probably already exceeded that this year. The IEA projects closer to 4TWh by 2025, and nearly 7TWh by 2030 [2]. You need to pay attention because this is happening fast. [1] https://www.bloomberg.com/news/newsletters/2024-04-12/china-already-makes-as-many-batteries-as-the-entire-world-wants https://www.bloomberg.com/news/newsletters/2024-04-12/china-... [2] https://www.iea.org/data-and-statistics/charts/lithium-ion-battery-manufacturing-capacity-2022-2030 https://www.iea.org/data-and-statistics/charts/lithium-ion-b...
- JumpCrisscross 2y ago> nearly 7TWh by 2030 That's a big number. Here's a bigger one: 30,000 TWh, about our current electricity consumption [1]. 7 TWh in 2030 is less than 1/4,000th total electriciy production today. (You obviously don't need 1:1 coverage. But 2 hours in 2030 against a year's demand today is still a nudge.) Now consider EVs. Then add the tens of TWh of annual power demand AI is expected to add to power demand [2]. (And I'm assuming a free market for battery cells, which obviously isn't where we're heading. So add local production bottlenecks to the mix.) Battery numbers are going up. But they aren't going up fast enough and never could have, not unless we ditch electrifying transportation. Nukes or gas. Anyone pretending there is a third way is defaulting to one or the other. [1] https://www.iea.org/reports/electricity-information-overview/electricity-production https://www.iea.org/reports/electricity-information-overview... [2] https://www.goldmansachs.com/insights/articles/AI-poised-to-drive-160-increase-in-power-demand https://www.goldmansachs.com/insights/articles/AI-poised-to-...
- UltraSane 2y ago[dead]
- lukeschlather 2y ago> and never could have I could just as easily assert the same of nuclear or gas. It doesn't make it true, although there seems to be evidence that nuclear cannot scale as fast as batteries/solar/wind.
- 2y ago
- slashdave 2y agoMaybe you just found a great place for a company like Google to invest in.