Reconductoring: Boosting U.S. Grid Capacity Efficiently
- pdx_flyer 2y agoThe article doesn't say much about it but I am sure there is significant work being done at the transmission substations as well to support the extra capacity.
- ghouse 2y agoAs the new conductors will have lower impedance, some breakers may need to be replaced to interrupt higher fault current. Otherwise, it's likely the only substation equipment needing to upgrade would be series compensation stations which may have lower normal and emergency ratings than the upgraded conductors. More likely is that lower impedance on the reconductored circuit will cause increased flows on other, non-upgraded circuits, either requiring those to be reconductored, or installing phase-shifting tranformers or reactors to limit current.
- sitkack 2y agoIf substations are being upgraded, they should also be installing batteries and inverters at the substations at the same time.
- infecto 2y agoThis sounds like moving the goal and a much more difficult problem than just upgrading the substation.
- pdx_flyer 2y agoGood points. Have you seen a lot of phase-shifting transformers in the U.S.? In my experience they've mostly been in Europe with a few specialized applications in the States. I would think a utility would want to reconductor the other circuits otherwise they're leaving benefits on the table right?
- ghouse 2y agoI only know the western US. And my experience is consistant with your own -- specialized applications. They would love to reconductor the other circuits. In the US, the utilities make a guaranteed rate of return on investments in the transmission system. So, anything they regulators will let them do, they'll do -- not necessarily because it has technical benefits, but because it has economic benefits. This is one reason why reconductoring isn't that popular with utilities -- it allows the utility to get more capacity with less spend, so less profit.
- pdx_flyer 2y agoFair enough. I had a conversation with one utility that was fine with transformers popping (even if preventable) because a popped transformer becomes a capitalizable expense.
- specialist 2y agoSpot on. David Roberts (Volts) also asked about that in one of his interviews. IIRC, the expert answer was: substations generally need a retrofit (eg new transformer, breakers, smarts). Even so, reconductoring is much faster and cheaper than building new lines. Because retro doesn't require a new permit, often reuse existing footprint, and substations can be upgraded as needed (eg only for sections pushing more power).
- outside1234 2y agoThere is also a parallel technology that does a better job of understanding line conditions with regards to heat, humidity, etc. and enables higher utilization as well (versus having to rate the lines to the worst 20 year scenario).
- ghouse 2y agoYou may be referring to either 1) the real-time line ratings (directionally required by FERC order 881, or 2) technology like the "SmartValve" from Smart Wires which dynamically adjusts impedance to keep conductors within their operating envelope. Among risks that are managed is ground faults caused by sage (as the line heats, it expands, getting closer to the ground), or 2) annealing which is a permanent expansion of the conductor due to operating too hot for too long. The advanced conductors use composite cores allowing the conductor to carry more current at a higher temperature with reduced risk for annealing.
- specialist 2y agoGood explainer, thanks for posting. Volts recently interviewed Emilia Chojkiewicz of UC Berkeley (quoted in article) and Jason Huang of TS Conductor. "One easy way to boost the grid: upgrade the power lines" [Jan 31, 2024] https://www.volts.wtf/p/one-easy-way-to-boost-the-grid-upgrade https://www.volts.wtf/p/one-easy-way-to-boost-the-grid-upgra... Here's a prior episode about "grid enhancing technologies" in general, including reconductoring. "Getting more out of the grid we've already built" [Sep 13, 2023] https://www.volts.wtf/p/getting-more-out-of-the-grid-weve https://www.volts.wtf/p/getting-more-out-of-the-grid-weve Grids are a common topic on Volts. Permitting, policy, intransigent utilities, open data standards, biz models, decentralization, virtual power plants, creating a national grid, etc. A handful of climate crisis / net-zero podcasts like Volts connect and catalyze people, resulting in new startups, legislation, and giving people hope & energy. Highest recommendation. Aside: INTERGRID is my term for our future perfect grid-of-grids. Inspired by the internet, of course. One such effort is (Alphabet) X & AES' Tapestry project https://x.company/projects/tapestry/ https://x.company/projects/tapestry/ .
- aaron695 2y ago[dead]
- cool_dude85 2y agoStrange not to mention wire weight which I gather is an extremely important factor. If these are also heavier, they may sag more for strictly physical reasons and that would cause problems. I guess the modeling behind this article probably takes that into account.
- ghouse 2y agoIncreased weight makes reconductoring much more difficult as the structures are designed to carry specific weight. Increased size can also impact structure loading from ice or wind. So, generally, reconductoring does not materially increase weight. The primary difference between the traditional conductors and advanced conductors is temperature tolerance. Most transmission lines are aluminum conductors with a steel core for strength (ASCR). As current increases, so does temperature, causing lines to sag (or the steel anneal if too hot). Advanced conductors use a different composition to operate at higher temperatures, or otherwise carry more current (one example: aluminum conductor, composite reinforced, or ACCR) so as to have similar weight (and profile) to the original, traditional conductor.
- bcrl 2y agoAnywhere that icing is possible during the winter, the static weight of the conductors is not generally the dominant design constraint; it is the diameter of the cable and the resulting additional load when icing occurs. Weight really only increases sag, which constrains attachment height, but wind gusts with increased wind resistance increase horizontal load. In areas that don't get ice, diameter drives wind loading, again making wind gusts the dominant failure mode for pole lines. This comes about as most poles and/or other support structures for overhead conductors have far greater strength vertically than horizontally. I've spent far too much time over the last couple of years learning pole line design using QuickPole. The other factor that keeps cropping up in my designs are grading and/or positioning issues. Putting a pole even 50cm out of line with other poles can result in it failing loading due to the added horizontal load on the pole. On a recent design I had to add downguys and anchors to 2 poles because they were out of line, a mistake during installation that nobody paid attention to. The same thing happens when a pole that is too tall is installed in an existing pole line. The wires to adjacent poles add horizontal force to the top of the pole. On one design I had a pole failing because of that, but it was fine if all the conductors were lowered 5 feet. All I wanted to do was put fibre optic cables on poles to serve my home... Oh, rabbit holes....
- gok 2y agopreviously https://news.ycombinator.com/item?id=39485940 https://news.ycombinator.com/item?id=39485940
- wernerb 2y agoThese cables can run much hotter and so have better capacity. BUT there is a big downside. Because they run so hot (you can grill a burger on them with ease), there will be a lot more resistance resulting in net losses. Also fun, because they can run so hot when rain hits it literally sizzles and cooks resulting in extra noise.
- SketchySeaBeast 2y agoIsn't that going to be a fire hazard as well?
- aerostable_slug 2y agoThey already need to be kept away from vegetation to prevent faults.
- jeffbee 2y agoSomething that everyone is going to need to get used to is that with carbon-free, cost-free primary inputs the emphasis on efficiency that we have historically known is going to disappear. It fundamentally does not matter if something that we need to make the system work loses a few percent of the energy.
- Krssst 2y agoIt does when the grid is running on batteries for extended periods of time. I guess it just comes down to what is cheaper between x% more batteries and y% larger conductors.
- bsder 2y agoIt's not particularly cheap or effective. From the article: > Chojkiewicz says her team’s modeling neglected those alternatives because their goal was simply to lay out the “nationwide potential,” of reconductoring. They only compared it to buying new land and putting in completely new lines. They ignored simply increasing the voltage, switching to HVDC and any solution other than "putting in whole new lines". In particular, the fact that they just ignored HVDC is problematic. HVDC gets you not just cheaper transmission but lower losses so makes better use of what you have even if you don't immediately boost capacity.
- 7952 2y agoHVDC converter stations are expensive though. And you would need to have one every time you have a substation to directly replace an AC cable. It makes sense for longer distances.
- mastax 2y agoWouldn’t increasing the voltage require new towers in most cases? The towers are sized to give sufficient isolation.
- bsder 2y agoMaybe. But it wouldn't require new land. And new towers with simply higher voltage on the old cables may be cheaper than these really expensive cables. And has the advantage that you can upgrade towers piecemeal as part of your maintenance cycle.
- matt-p 2y agoHVDC is not a silver bullet. Converter stations are very expensive and also take more space. You need one every time you tap in/out of the transmission line, great for point to point links say Offshore windfarm to major IC, but general transmission gets tapped into and out of much more frequently. Even if today you plan for this link to be P2P from city A > city B today what happens tomorrow when someone builds a generation plant, or a new town, datacentre campus on that route? The "efficiency" gain is debatable, you do lose less on transmission but you now have this cost of getting from DC>AC AC>DC which costs roughly 1.1-1.6% - in the grand scheme of things for most schemes any overall efficiency gain is marginal to nil. Overall the most flexible thing to do is build AC at the highest voltage your towers/interconnect points support (and consider increasing that). In the UK we are building more lines and converting more substations from 275KV to 400KV.
- mikewarot 2y agoI was hoping Ultraconductors[1,1a] would make it out of the lab, and into general use... but the crash of 2008 apparently killed them off. (OR... it was a scam all along. The patent they reference [2] is for a polymer about as conductive as the nichrome wires you use in your toaster) The other patent they reference[3]... does claim 10^11 S/cm, which is about a million times as conductive as silver. Imagine what you could do with power cables a million times as conductive as silver. [1] http://www.superconductors.org/ultra.htm http://www.superconductors.org/ultra.htm [1a] https://web.archive.org/web/20090201200804/http://ultraconductors.com/about_us.html https://web.archive.org/web/20090201200804/http://ultracondu... [2] https://patents.google.com/patent/US5777292A/en https://patents.google.com/patent/US5777292A/en [3] https://patents.google.com/patent/US6552883/en https://patents.google.com/patent/US6552883/en