3 ms·
> One of the parts that is mixed in, can be nuclear. Probably should be. But always a small part of the mix. Nuclear is slow: slow to power up, slow to adjust t
by Ancapistani 2y ago
> One of the parts that is mixed in, can be nuclear. Probably should be. But always a small part of the mix. Nuclear is slow: slow to power up, slow to adjust to demand or supply from others in the mix. And extremely slow to build.
All of those things, to me, mean that it should be a large part of the mix. Nuclear should be the backbone of our energy production, and should be sufficient to supply our baseline needs.
That said, in places where hydro or geothermal are practical, those should be used in preference to nuclear. They're cheaper, more reliable, and just better in almost every way.
Solar, wind, tidal, wave action, and so on should be what we build on top of that baseline. They should be cheaper to build and operate, but far less consistent.
If you want to train a huge LLM, or smelt metals, or do anything that's energy-intensive but not very time-sensitive, you schedule those loads during times where energy production exceeds existing demand.
... and you know when that happens by pricing energy based on availability. Electricity should be cheapest when we have more than we need, and more expensive when the inconsistent sources listed above aren't producing. In other words, market forces are sufficient to make this happen.
In fact, one of the cool things about solar and wind in particular is that they are so aggressively cyclical that it's possible that energy prices could actually go negative - not often, or regularly, but possible. That opens the door to all kinds of use cases that would otherwise never be profitable, and using those types of technologies often leads to efficiency gains that can eventually make them more efficient than the current alternatives.
- nradov 2y agoScheduling loads based on energy spot price tends to wreck the economics of manufacturing. If you have to shut down when energy prices spike then you're still paying fixed expenses for PP&E plus at least some labor. It's tough to finance that.
- berkes 2y agoDepends a bit on the "manufactoring". It's not "black"-"white". While it's certainly true for e.g. a brewery or a bike-factory-line, it's less so for aluminum, or chemicals. And even less so for systems like a freezer. A friend who makes juices and dried fruits on medium scale, plans his production ahead based on the spot pricing: steaming or deep-freezing can be postponed for days, apparently; I helped him with some dashboards and integrations of the pricing-APIs for this. What I'm trying to say is: yes, a lot of industry won't be able to profit much from these markets. But many can, if they are just willing to change their current ways a little. Not all: many.
- berkes 2y agoThis market thing is in place already. At least in Europe it is, I've done a project during my energy engineering study for APEX. The irony, however, is that it's not all that good for nuclear. When prices go down or even negative, a CHP or windmill is shut down in minutes. The nuclear plant (or ancient coal, or even hydro) will go below cost price, or even havs to pay to deliver electricity, because they can't not deliver. And in Europe we are having a few times of negatively priced electricty per year recently. And contrary to what many people think, nuclear power is rather expensive. For a small part that's political (subsidies and all), but mostly it's because running a nuclear plant is expensive; its fuel is expensive as hell (it does burn fuel), and storing its waste "guaranteed" safe for some 5.000 years is expensive (incredible timescales; egyptians building pyramids - to now, timescales). Also expensive is it's cooling facilities: nuclear operates on a steam cycle, so it needs a lot of cooling; many places don't have that (anymore). E.g. in France some plants were shut down because rivers dried up too much and they'd be heating up the remaining "trickle" too much with these plants. That makes it unreliable, the way hydro, tidal, etc can be unreliable too. There are just so much problems with nuclear power. Again, aside from the political "opinions" on it: these well known percieved risks and such. But that makes it a difficult part of that mix. I do believe it should be a crucial part, but also am convinced that part should be as small as possible, due to those downsides, costs. And, as you say, indeed, in places where there's alternatives, you'll find these alternatives are almost always a better option, cost, timescale and operational wise.
- chickenbig 2y ago> When prices go down or even negative, a CHP or windmill is shut down in minutes. Negative prices are a symptom that the (day ahead) market is not the real game being played. CfD, production subsidies and renewable credits are the order of the day. > The nuclear plant ... will go below cost price > its fuel is expensive as hell The fuel is cheap. https://www.iea.org/reports/projected-costs-of-generating-electricity-2020 https://www.iea.org/reports/projected-costs-of-generating-el... estimates 9.33 USD/MWh (2018 prices) for fuel. > in France some plants were shut down because rivers dried up too much and they'd be heating up the remaining "trickle" too much with these plants. https://www.politico.eu/article/when-the-water-runs-dry-why-france-is-freaking-out-over-a-tiny-swiss-dam/ https://www.politico.eu/article/when-the-water-runs-dry-why-... The Bugey plant is also the main reason France must ask the Swiss to let more water through the Seujet Dam. While most of the water is released back into the river, the reactors need a constant, cool flow — and climate change isn’t only making the Rhône’s water scarcer, but also warmer. > in France some plants were shut down because rivers dried up too much and they'd be heating up the remaining "trickle" too much with these plants Looking at https://www.euronews.com/green/2023/07/13/frances-nuclear-power-stations-to-limit-energy-output-due-to-high-river-temperatures https://www.euronews.com/green/2023/07/13/frances-nuclear-po... it appears power was reduced due to river temperatures, not river levels. That makes it more a regulatory issue, and probably one solvable with more hardware (extra cooling towers or greater extraction). One might also ask whether it is worth EDF investing to get the extra few percent total output across the year; the solar peaks during hot weather will tend to reduce the price of electricity, so why not just schedule maintenance at that time of year. Thus PV creates a problem that it partially solves.