2 ms·
It may not be a solved problem entirely, but there is so much battery storage in interconnection queues right now across the US that here, at least, the bottlen
by LUmBULtERA 2y ago
It may not be a solved problem entirely, but there is so much battery storage in interconnection queues right now across the US that here, at least, the bottleneck is regulatory and interconnection cost, not the cost of battery storage itself.
See, e.g.: https://emp.lbl.gov/queues https://emp.lbl.gov/queues
- 7thaccount 2y agoYou have to take the queues with a grain of salt as there is so much speculation going on where a developer submits 20 projects to multiple queues at the different ISOs in order to find the best project with the lowest upgrade costs.
- LUmBULtERA 2y agoNo one is claiming everything in the queues will be built. But I'm talking about identifying bottlenecks. Also as some projects are removed from the queue, other projects will enter it, so the ratio of types of projects in the queues is relevant as well.