Doing is normally distributed, learning is log-normal
- weinzierl 2y ago"Software estimation is such a mess in part because it has trouble recognizing that, at least, just-in-time learning is at least non-normally distributed. Everything we know about traditional project management, from Waterfall to Gantt charts to estimation practices, are on some level based around the idea that each individual step in the chain is bell-shaped: [..]" From experience I 100% agree with this, but it always caused a certain cognitive dissonance when thinking about project management approaches. A project is by definition a time bound one time endeavor. It is something where the crucial parts have never been done before. The unknown is the defining characteristic. Learning should be a defining characteristic as well, yet many approaches pretend it's a small part at best. My working theory is that the majority of "projects" that are typically used as comparison with IT projects (like construction) are not real projects at all. Real projects are rare (e.g. Burj Khalifa). In IT the ratio is the opposite. The real projects dominate and the "construction sites" are still the minority. But we can expect this to change. Thinking this to the end would mean that we could see a resurgence of waterfall in IT - likely under a different name.
- deleted 2y ago[deleted]
- Normal_gaussian 2y agoWhilst waterfall-like may be the approach, at least some (often the largest) steps are tough to estimate. The problem waterfall has is that it attracts deadlines like roadkill attracts flies. Presenting as following "agile" gives a strong body of literature to fight this - and actually do something else. We've all seen the criticisms that nobody does agile right - and for many, thats deliberate.
- weinzierl 2y agoDeadlines are good. The world operates on deadlines and IT is the exception. We can build bridges on time and budget most of the time because we've built millions of them in modern times and have been doing it for more than 3000 years. In software we are not there but I have no doubt that we will, and hopefully it won't take us that long.
- tempaccount420 2y agoOh man, software development will be so boring when we get to that point.
- danielbln 2y ago"GPT, I need this thing built to spec." "Sure thing boss, come back in 25 minutes."
- cameldrv 2y agoIMO a waterfall like process can work for a lot of projects, but you need a lot of time for estimation/derisking, and this work is hard, so often developers don't want to do it, and management/customers often don't want to pay for it. Some of the most successful projects I've worked on have started with an estimate that had only a few items with more than 4 hours attached to them. If you get estimates down to that level, that means that most of the significant technical decisions have already been made, and you've determined that your technical approach should work. If you do that, and then add a calibrated amount of padding for mistakes, you can very often hit estimates pretty much dead on (+-10%). How much time it takes to prepare the estimate depends a lot on the nature of the work though. If there's something pretty similar the team has done multiple times, and you have access to estimates/tickets/timesheets, you can often get it done in about 5-10% of the total project time. However, for example, if it's an ML project, there may be a lot of unknowns that have to be clarified first. For example, data quality is almost always not what it is claimed to be at the outset, so this needs to be resolved before the estimate is generated.
- yarbas89 2y agoThe project is the project side of the construction project and not construction side of the construction project =D Typically, in construction projects, 90%[1] of the challenges are encountered and resolved in the design office by a multi-disciplinary, multi-organisation design team effort across multiple years... [1] - Anecdotal evidence drawn from my experience as a structural engineer.
- weinzierl 2y agoMy point is that the "project" side is not really a "temporary endeavor undertaken to create a unique product" [1] in the majority of cases. Sure the environment, circumstances and result differs for every construction project, but the variance doesn't justify to call it a project in most cases in my opinion. We've built millions of modern bridges that are in operation and we've been doing it for more than 3000 years. The number of environments, configurations and requirements we've not already encountered is very limited and these are the real construction projects that - no doubt - do exist. Now, contrast this with the number of CRUD apps we've built and for how long we've been doing it. There is still a lot to learn there. That's the reason why more bridges are on time and budget than CRUD apps, in my opinion. [1] https://www.pmi.org/about/what-is-a-project https://www.pmi.org/about/what-is-a-project
- yarbas89 2y agoI sort of understand what you're saying but I'm struggling to agree with your examples in the comparison. Even if you're working on a "project" comprising hundreds of near identical houses, there could be massive differences in the project constraints and their solutions for adjacent plots for any given selection of houses. There could for example be a large tree with root protection zones on site where you would have to carefully design the foundations to account for this and their future effects such as heave due to volume change potential of the underlying soil. My point is that there are many "hidden" problems solved by the design team during the project / design phase even for seemingly insignificant or simpler "projects". In my experience of analysing and designing hundreds of buildings for over a decade every project was unique and as such treated like a "project".
- 0x000xca0xfe 2y ago"Construction site" projects in IT would be Wordpress sites/small business eCommerce etc. and there are millions of successful projects of this type out there. Building them might be messy, but rarely fails from a technical point of view.
- weinzierl 2y ago"there are millions of successful projects of this type out there." I wish and believe we are getting there but I don't see it today. Just as an example: I traveled a lot after COVID and almost every tourist attraction has a photographer or photo site and they upsell by offering you pictures. I have yet to encounter two attractions that use the same system, they are all different and terrible in different ways. They all do basically the same thing, so there is no reason not to have a standard solution. I have no doubt one will replace the existing solutions sooner than later. So, millions of them but I would hardly call them successful. Them being messy is the collective learning process that has been mostly completed for real construction projects, but is still in full swing for IT projects.
- rolisz 2y agoI think you two agree: there are millions of successful projects out there, but they are not standardized. But the guy who made 1000 of them knows exactly how long it will take him to build the 1001th
- 0x000xca0xfe 2y ago"they are all different and terrible in different ways. They all do basically the same thing, so there is no reason not to have a standard solution" Sounds exactly like small construction projects. I have heard this sentence almost word by word from somebody who owns multiple small rental objects.
- sanxiyn 2y agoPharmaceutical companies know this by heart. What you are doing is learning about your drug candidates. Learning is not normally distributed.
- mif 2y agoReminds me of [1]. We are good at estimating the median but not the mean. [1] https://erikbern.com/2019/04/15/why-software-projects-take-longer-than-you-think-a-statistical-model.html https://erikbern.com/2019/04/15/why-software-projects-take-l...
- baq 2y agoAlso made this exact association. My takeaway: when estimating unknown quantities in software development you can treat means as infinite thus making any project unestimatable (management hates this reasoning - a friend told me, pinky promise); otherwise assign some non-zero probability than any mean will be 10-100x of the estimate.
- yabbs 2y agoSimilar idea [1]: >Engineering mode shuns uncertainty, because uncertainty may involve risk that corresponds to bad surprises. Discovery mode thrives under uncertainty, especially when a rare but beneficial result leads to finding something new, or a reduction of uncertainty in the face of making strategic decisions. In summary, to understand the distinctions of Discovery and Engineering modes, one needs to have an appreciation for variation and the underlying distribution of outcomes expected while operating in each mode respectively. Without understanding the asymmetry in their outcome distributions, it would be difficult to convey how these work modes are different. [1] https://jabustyermancom.wordpress.com/tag/discovery-vs-engineering/ https://jabustyermancom.wordpress.com/tag/discovery-vs-engin...
- psychoslave 2y agoThat doesn’t look so specific to software field though. We, mankind, are making buildings since even before we had writing systems. Are they perfect methodologies to make any building in expected time? Sure you can maybe make a bit more of rationalization and replicate a house many time with affordable local material. But you will not replicate the same house everywhere, because they don’t have the same material near them and move it from far might be economically prohibitive and not competitive with local material. Also your house design is probably a poor fit for many environments. And people have different cultural expectation in term of architecture due to historical factors, plus each individual comes with its own whims. Where is the standard scalable (both shrink and expand) omni-environment bridge design, hmm? All bridges have the same basic purpose, and yet I have no doubt building most of them have been a challenging endeavor of its own.
- Sharlin 2y agoI'd say that's just a function of how much learning you have to do while doing. If you have all the information required to do something, the the time needed probably approaches a normal distribution. But any unknown unknowns that you encounter are vastly more likely to delay than expedite the project, making the right-side tail both fatter and longer.
- nabla9 2y agoChapter 11: Prepare to throw one away Pilot Plants and Scaling Up Chemical engineers learned long ago that a process that works in the laboratory cannot be implemented in a factory in only one step. An intermediate step called the pilot plant is necessary to give experience in scaling quantities up and in operating in nonprotective environments. For example, a laboratory process for desalting water will be tested in a pilot plant of 10,000 gallon/day capacity before being used for a 2,000,000 gallon/day community water system. Programming system builders have also been exposed to this lesson, but it seems to have not yet been learned. Project after project designs a set of algorithms and then plunges into construction of customer-deliverable software on a schedule that demands delivery of the first thing built. In most projects, the first system built is barely usable. It may be too slow, too big, awkward to use, or all three. There is no alternative but to start again, smarting but smarter, and build a redesigned version in which these problems are solved. The discard and redesign may be done in one lump, or it may be done piece-by-piece. But all large-system experience shows that it will be done.[ Where a new system concept or new technology is used, one has to build a system to throw away, for even the best planning is not so omniscient as to get it right the first time. The management question, therefore, is not whether to build a pilot system and throw it away. You will do that. The only question is whether to plan in advance to build a throwaway, or to promise to deliver the throwaway to customers. Seen this way, the answer is much clearer. Delivering that throwaway to customers buys time, but it does so only at the cost of agony for the user, distraction for the builders while they do the redesign, and a bad reputation for the product that the best redesign will find hard to live down. Hence plan to throw one away; you will, anyhow. You know the source.
- BigglesB 2y agoHadn’t thought of it in this context before but in game development a “vertical slice” could potentially be thought of as akin to the “pilot plant” in that it’s about proving out the _processes_ for creating game content (and working out how long each piece of content should take to make) before committing to “scaling up” said content production to deliver the full game…
- seventhtiger 2y ago
- qp11 2y agoLook at the Explore-Exploit Tradeoff - https://en.wikipedia.org/wiki/Exploration-exploitation_dilemma https://en.wikipedia.org/wiki/Exploration-exploitation_dilem... All Problems are not created the same. And therefore what learning and doing happens depends on the Kind of Problem. Exploring an unknown jungle for gold is a very different problem than Exploiting an existing goldmine. One problem is more biased towards learning, while the other is biased towards doing. The managers and teams you end up producing for each type of problem is very different. The distribution of skills/knowledge/experience/creativity/curiosity etc at the end of solving an explore problem is very different from what you end up with solving an exploit problem. Issues arise when you take a team thats good at Explore and make them work on Exploit. Or vice versa. In our current chaotic ever changing environment most problems have elements of both that keep changing.
- krona 2y agoAt least superficially, doing is not normally distributed either since a task cannot take negative time, but could take an infinite time to complete.
- dxdm 2y agoWhat's wrong with having a normal distribution of only non-negative values? Or is somebody specifically talking about a _standard_ normal distribution?
- krona 2y agoWhat happens to the distribution as it approaches zero?
- mrks_hy 2y agoSee my sibling reply, there is no requirement that you observe negative values for a process to be normally distributed.
- mrks_hy 2y agoA normal distribution is infinite so there is always a (small) nonzero expected value for any real number, so technically, even for "mean" much larger than zero. However, GP is accidentally reversing the causality, which is incorrect: We say that something follows a normal distribution if the samples we observe fit, e.g. shoe sizes or height, which are clearly non-negative. It doesn't mean that any possible distribution value must occur in the original samples for the population to be normally distributed.
- zmgsabst 2y agoI think the OPs point is that it’s bounded below at a point not-distant from the mean, and hence you have a one-tailed and not two-tailed distribution. That non-trivially changes the distribution. And then commented why: you have a finite amount you can do a task faster; but an infinite amount you can do it slower. That is in contrast to heights or shoe sizes, which are (effectively) bounded on both sides while having the bounds distant from the mean.
- vasco 2y agoPeople who are super into software estimation can never explain how estimations would go for Ron Jeffries implementing Sudoku in TDD vs Norvig. When you understand that difference you mellow out about estimation.
- kbrkbr 2y ago> You’re about 90% sure you know how to start the app. You’re 80% sure you know how to handle the infra you’ll need to get it online. And you’re 70% sure you know how to get your first customer. What is your chance of successfully going from zero to first customer? 0.9 * 0.8 * 0.7 = a little over 0.5. This would be true if the probabilities were independent [1], which they are probably not, as the infra is tied to the app. The probability can be anything from 40% to 70%. You can see that if you arrange 3 rectangles inside a unit square, one with 90% of the size, one with 80%, one with 70%. If they contain each other, their overlap is 70% of the whole, namely the smallest rectangle. In the worst case it is 40%, when the 80% is 10% out of 90%, giving 70% overlap. And then 70% is 30% out of that overlap, leaving 40%. [1] https://en.m.wikipedia.org/wiki/Independence_(probability_theory) https://en.m.wikipedia.org/wiki/Independence_(probability_th...
- deleted 2y ago[deleted]
- esperent 2y agoYou're not wrong, mathematically. But these numbers (90%, 80%, 70%) are made up, so it's kind of irrelevant whether we're doing the maths right or not.
- mjburgess 2y agoYes, the confidence interval on the model which assigns the probabilities is so large, any confidence on derived conclusions here is pretty meaningless.
- kqr 2y agoQuite the contrary. The only thing that really matters when it comes to probabilistic forecasting is that we do the maths right. The numbers will always be made up estimations, so the only thing that sort of makes sure we converge on similar solutions is getting the maths right. A person is free to make any outlandish estimation of any individual probability, but when they are faced with the task of trying to make it mathematically cohere with other estimations is when they realise how outlandish the initial estimation was. I have tried to write about this before: https://two-wrongs.com/what-is-probability.html https://two-wrongs.com/what-is-probability.html
- srg0 2y agoIf learning durations were log-normally distributed, how would people be able to graduate from universities and finish studies, mostly in time? Or accomplish anything substantial in their limited time span? I agree that distribution of most human tasks' duration is skewed (not necessarily distributed log-normally), but these tasks can still have a reasonable upper bound for completion. The success is not binary. Like in grading, we need to accept that some projects will get an A, and some will get only B or C, and it's still OK. Some may fail.
- baq 2y agoA curriculum is designed. It's a product. It's optimised for teachers to deliver lessons in such a way that students can learn faster than log-normal. Designing and implementing a curriculum is probably a log-normal effort.
- H8crilA 2y agoExactly. To see why notice that in a curriculum you are presented with both a problem and a solution. You are encouraged to find your own solutions to many problems, but regardless of whether you do you are also presented with the correct (optimal) solutions. This removes inaccuracies in your thinking, which would otherwise pile up multiplicatively, yielding a log-normal distribution of the time needed to master some topic.
- mrkeen 2y ago> If learning durations were log-normally distributed, how would people be able to graduate from universities and finish studies, mostly in time? By studying an exponentially smaller domain each time round: * In primary school, study "The life-cycles of animals" * In secondary school, study "mitosis and meiosis" * As an undergrad, study "insect reproduction at a cellular level" * As a postgrad, study "the effect of a particular molecule on the timing of a mosquito's development into sexual maturity"
- ahtihn 2y ago> If learning durations were log-normally distributed, how would people be able to graduate from universities and finish studies, mostly in time? If you took a hundred 5 year olds and set the objective to achieve the same PhD in the same field with unlimited time, guess how the time to achieve it would be distributed? I'm sure some won't achieve it in their lifetime, so I disagree that there's a reasonable upper bound.
- spion 2y agoThis is fascinating, but I'm not sure this is the reason (or a good excuse for?) why software estimation is a mess right now. If you look at standard industry practice, the concept of "probability" rarely enters the discussion at all when estimating. I've personally had great success with three-point estimation. [1] As far as statistical methods go, its pretty simple - yet it tends to work surprisingly well. To my knowledge however, none of the popular software on the market has any of the tools needed to do even something as basic as this, at least out of the box. There is a whole set of tools out there for probabilistic modeling, and if we're serious about estimation, we should start talking about them. [1]: https://en.wikipedia.org/wiki/Three-point_estimation https://en.wikipedia.org/wiki/Three-point_estimation
- deleted 2y ago[deleted]
- bruce343434 2y agoWhat is your technique for estimating in the case that the tech stack is (at least in part) unfamiliar? Can this technique be applied by junior developers with only a few years experience?
- spion 2y agoFor cases where the tech stack is in some ways unfamiliar, we create research stories where the goal is to do the quickest thing possible to answer questions about the tech. This is typically timeboxed by the max time we'd be willing to spend on it, rather than the estimated maximum time. Its still useful to try and put a maximum estimate if possible, because then you can also estimate probability of success for the timebox which makes you better prepared for discussion with business to help them decide if they want to take the risk to invest time in it. Few years of experience should be quite sufficient, although I think overall team culture is probably more important. I've usually done this type of estimation together with teams where there's already good communication, but when that's not the case something like pointing poker to open up safe discussion and uncover uncertainties may make sense as well.
- regularfry 2y ago
- m0rc 2y agoI think the problem is not just software estimation, but project cost and time estimation is difficult across many domains (construction, transportation, IT, defense, and even the organization of events). The word "mess" seems to indicate that the uncertainty is easily fixed, but if it has happened across domains for several millennia, it could indicate that there is something fundamentally challenging. The situation worsens with factors such as project size, requirement changes, methodology (too much or too little of it), technology (specially new technologies), the nature of the delivering institution (public institutions performing worst than private ones), and organizational culture (e.g. waterfall being in many cases detrimental by making adaptations more difficult). There are certainly bad ideas in the field of estimation, like assuming a Gaussian distribution, but the problem is far from trivial. See for example: * Defense: Bolten, Joseph G., et al. Sources of weapon system cost growth: Analysis of 35 major defense acquisition programs. Rand Corporation, 2008. * Public works: Flyvbjerg, Bent, Mette Skamris Holm, and Soren Buhl. "Underestimating costs in public works projects: Error or lie?." Journal of the American planning association 68.3 (2002): 279-295. * Transportation: Cantarelli, Chantal C., et al. "Cost overruns in large-scale transportation infrastructure projects: Explanations and their theoretical embeddedness." arXiv preprint arXiv:1307.2176 (2013). * Olympic Games: Flyvbjerg, Bent, Alexander Budzier, and Daniel Lunn. "Regression to the tail: Why the Olympics blow up." Environment and Planning A: Economy and Space 53.2 (2021): 233-260.
- richrichie 2y agoFascinating thing about Central Limit Theorem is that sum of log normals also goes to normal in the limit.
- mirrorlake 2y agoWhen simulating or modeling how long something will take, (0 hours, 1 hours, 2 hours...) you never use a normal distribution because of the potential for negative values in the left tail. You would rule that out by default. The title itself implies that the author has this misconception.
- thesz 2y ago"Doing" is also non-normally distributed, because you cannot do something in a negative amount of time.
- deleted 2y ago[deleted]
- vslira 2y agoI think I've said this before on this forum, but it bears repeating: if there's one thing that I'll never forget from my Industrial Engineering degree is that all processes can be designed around long waits, but it's the variance that kills you.