Scrum's Built-In 'Get Out of Jail Free Card' Against Criticism
- kelseyfrog 2y agoWhat evidence would it take to conclude Scrum didn't work?
- x3n0ph3n3 2y agoThe same that it takes to prove that TDD doesn't produce more value than other development techniques. Both have moving bars whete proponents just claim "you are not doing it right" in the face of any criticism.
- 8372049 2y ago"You're not doing it right" can be its own criticism though. If you're not doing X right then maybe that means it's too hard to use X in a way that adds value. X can be useful for one person in one situation and not useful in another, neither of which shows that it's intrinsically useful or intrinsically flawed. It just depends. Our holy wars to prove the might of our favorite tools and techniques are never going to give any universal truths. (Except that Vim is better than Emacs.)
- Sankozi 2y agoScrum works in some way. Its rituals take some time, even if you consider all of them pointless, there is some time left to deliver value. Crappy car also works if you can use it and drive to designated place. The question should be "Is there, for every situation, something clearly better than Scrum?".
- ebiester 2y agoI think this is the wrong question. The question instead is “for what context, what other solution works better?” That could be SAFe, or DAD, or 37 signals’ Shape Up. “Scrum doesn’t work” is like saying Systemd doesn’t work. Obviously it works in some contexts. Obviously it has weaknesses. But in comparison to what?
- max_sendfeld 2y agoSame logic with communism - all the ones that ended in oppressive dictatorships, mass executions or starvation weren't "real communism" or weren't "implemented right"...
- MarkMarine 2y agoOy. Why add politics to this. Maybe just stay on topic.
- spriggancg 2y agowe could add religion also! the ayatollahs of scrum can speak too!
- lupusreal 2y agoScrum is an ideology, and is a method of managing people to boot. It is politics.
- MarkMarine 2y agoPolitics is just deciding what to do with shared resources, an ideology informs people’s choices about what to do with shared resources, managing people doesn’t really have anything to do with scum or politics, I think you’re missing the mark. More to the point, you’re picking something more divisive than scrum and adding your thoughts about the divisive topic to add to a discussion about scrum, it doesn’t add to the conversation it just ratchets up the conflict. Take it to Facebook.
- lupusreal 2y ago> Politics is just deciding what to do with shared resources Sure, as good a definition already. > managing people doesn’t really have anything to do with scum or politics People, and particular the labor of people, is a resource! Managing it is inherently political.
- 2y ago
- darekkay 2y agoThere are projects where scrum doesn't make much sense. You wouldn't want to build a house in an agile way. It is also essential to have the customer comnit to the agile way of working. A project with a fixed deadline, fixed scope and fixed budget doesn't become a scrum project just because you introduce sprints, dailies, reviews, scrum masters and product owners. Framing the misuse of a framework as a "get out of jail free card against criticism" misses the point.
- Nursie 2y agoI would add to his initial list - 4. You didn’t scrum hard enough! More meetings! More discussions about god knows what, more retros that achieve nothing. More meta-discussion around process while less work than ever gets done!
- jakobloekke 2y agoYawn. Scrum is a standard that eliminates the need for figuring out and agreeing about a bunch of things. This has great value in the real world. What would the author do instead? Is scrum “perfect”? No. Does it solve all problems? No of course not. But it’s not meant to. It’s an abstraction layer on top of the complex mess that is software development and team coordination. Blaming the abstraction layer when something goes wrong is typically a strawman. Like blaming the REST API when it’s actually the database that’s slow.
- jongjong 2y agoScrum is alright but shouldn't be taken to the extreme. We went from Waterfall Model, planning absolutely everything up-front, to the opposite extreme of planning nothing up-front. Somehow people think that's totally normal and still think process is everything. I've been around the tech industry long enough to see companies dogmatically pursuing certain ideas only to switch to the opposite ideas later... And, at all times, everyone is 100% sure that this way is the only way it should be done. Nobody ever gets any credit for saying "Hang on, maybe we should find a middle ground." The root problem is that most humans are a mix of crazy and stupid. We go from one crazy extreme to the opposite crazy extreme.
- donquichotte 2y agoI agree, but I have seen an implementation of a middle ground (Scaled Agile for Enterprises, SAFE) that combined the worst of both worlds, with quarterly, one-week, all-hands-on-deck mammoth PI (product increment) planning sessions down to the story point (whatever unit that was, apparently it has magical self-calibrating properties) that were thrown out of the window 4 weeks into the PI.
- jongjong 2y agoCombining the worst of both worlds is definitely a nutty thing to do! You need to use critical thinking and analysis when coming up with new processes. It's definitely possible to make use of the best of both worlds. Though you still need to synthesize and re-evaluate the whole. Though two wrongs don't make a right, two rights can sometimes make a wrong when combined.
- exe34 2y agoif scrum isn't working, you're clearly not having enough meetings!
- searealist 2y agoReal scrum has never been tried.
- mschnell 2y agoI had a knee-jerk reaction ready to dismiss this post, but it actually makes a good point and it makes it well.
- deleted 2y ago[deleted]
- proc0 2y agoIf I recall, one of the creators of scrum boiled it down to two elements: a cycle and a reflection on that cycle. All scrum types revolve around that in different ways, and it seems most orgs fail to understand this. The biggest tool of scrum is having cycles, and then reflecting on the cycle in order to move it in the right direction, but most of the time there are still quarterly planning and bad adherence to the sprint planning (bringing in new work in the middle etc), which defeat the purpose of scrum to begin with. Additionally, scrum should be owned by the contributing team and that almost never happens, as it is controlled top-down by managers and leadership.
- pydry 2y agoIf you boil scrum down to that then there is no scrum because scrum didn't invent iterative development or retros. It invented a bureaucratic way to cargo cult them though.
- proc0 2y agoMy understanding is that it was always about creating a kind of protocol for engineers to collaborate better. and scrum just packaged those concepts so they could be implemented by anybody. The bureaucracy happens because it's usually not owned by the contributing team and instead orgs like to synchronize all their teams into one unified process, so it inevitably becomes "corporatized".
- pydry 2y agoThat's the theory. In practice it became a way to cargo cult those things with bureaucratic rituals. This was completely the fault of scrum for being highly proscriptive about the process. It's like teaching somebody to program with rote learning or something. It just fundamentally doesn't work because the core of the process requires human ingenuity, creativity and freedom to work and by having a rote process those things are inhibited.
- dsalfdslfdsa 2y agoIn my experience, the reflection at the end of each cycle is a useful way to make the team feel empowered and in control of their destiny, while all that happens in reality is that they complain to each other once a sprint and the damage is safely contained without bothering management. Also, what is so bad about quarterly planning? Not everything ships immediately - this shows a very strong web app bias.
- Freak_NL 2y agoI'm sure this happens because my senses haven't been dulled down enough to just shrug and gloss over these, but the AI-generated filler image after the first full paragraph just jars me out of the reading groove and makes me just drop the article. It feels derisive. How is this better than just grabbing a photo of an actual get out of jail free-card from somewhere? https://commons.wikimedia.org/wiki/File:Get_Out_of_Jail_Free_Card.jpg https://commons.wikimedia.org/wiki/File:Get_Out_of_Jail_Free... (CC-BY)
- DixieDev 2y agoYour comment is far too reasonable. Go directly to jail. Do not pass ⅄OR.
- 8372049 2y ago> "If failure cannot be attributed to Scrum, then neither can success." I don't think this is true, given the "Get out of jail" arguments he is attacking. A proper tool used in its intended way for its intended purpose is intrinsically useful. You can say the same about any tool: If you use a hammer to cut a cake, the resulting mess is your fault. A broken hammer is not an error with hammer as a concept. If you successfully hammer in a nail, the hammer played a crucial part in the success. I can't think of an instance where failure would be the hammer's fault. If you think the hammer is to blame for not being suited to cut cakes, well, that changes things. Am I missing something? (I am only talking about the quoted truism. I am not qualified to talk about scrum.)
- Joker_vD 2y agoThe assumption is that Scrum is suited for exactly zero things, so if you apply it to anything and fail, it's your fault: you should not be applying it to anything! Even though we the Scrum Masters tell you that you should... excuse us for a second while we're retreating to the motte to continue the argument.
- h0l0cube 2y agoScrum isn’t so much a tool but an ill defined framework. The Get out of Jail Free Card the author refers to is abusing this lack of definition to brush off any failed attempts at applying the framework. The author continues to imply if there’s so many failures to apply the framework, that’s probably a failure inherent to the framework itself, at least as it is deployed today.
- baq 2y agoWriting about Scrum, regardless if it's praise, complaints, references, howtos or just plain descriptions without referencing the agile manifesto is kinda... missing the point? The content of the article is good, but perhaps quoting the founding principles of agile would make it even better? Implementing Scrum (including org-specific adaptations) without understanding the idea behind 'agile' is what a PHB does. https://agilemanifesto.org/ https://agilemanifesto.org/
- lukol 2y agoThis. Scrum is just a way of operationalizing the basic principles behind the Agile Manifesto while putting them in a way that can be communicated and understood outside of dev/product organizations. No Scrum Master/Agile Coach/Product Owner, etc. worth his/her salt will tell you to slavishly stick to every piece of Scrum as long as you get the basics (see the manifesto) right. It is, however, a somewhat useful tool for helping you get this running in the first place (especially in organizations where there is a lot of chaos to begin with, i.e., upper management regularly changing the product scope and release timeline based on the color of their coffees, etc.).
- pseudalopex 2y ago> Scrum is just a way of operationalizing the basic principles behind the Agile Manifesto while putting them in a way that can be communicated and understood outside of dev/product organizations. Scrum in practice is processes and tools over individuals and interactions. > No Scrum Master/Agile Coach/Product Owner, etc. worth his/her salt will tell you to slavishly stick to every piece of Scrum as long as you get the basics (see the manifesto) right. This is the no true Scotsman fallacy.
- madspindel 2y agoWhen I hear and read about Scrum, I'm always reminded about the Simple Sabotage Field Manual by the CIA. How can we be sure that Scrum isn't yet another tool by a foreign adversary to sabotage Western companies?
- sambazi 2y agothe same way we can be, reasonable, sure that other tools, like knifes and saws, when used for their intended tasks and in the intended way, are just tools.
- mytailorisrich 2y agoThis feels like a rant that does not make any substantive points and ends up looking like an example of what it sets out to criticise. > Sprints seem to put people on the wrong foot as if we should rush to complete everything in the Sprint... This is arguing about semantics. If you don't like the term, use another one or explain it better to your team. The important thing is to understand the point, which is to have short development cycles with working software at the end. In context, the term "sprint" does not refer to any sense of rushing but rather of uninterrupted focus. Of course you plan and reflect before and after, but once you've started you go the distance (which is short!) until the end. > Lots of talk about how to do better Scrum, while Scrum should be in the background. That's not inherent to Scrum. On the other hand, continuous improvements have to require an amount of discussion on what works and what doesn't in order to adapt and improve. You need to find the right balance. > The Sprint Review is mainly misunderstood, as the label is confusingly similar to Sprint Retrospective, and people mistakenly believe it's a Sprint Demo... This is again arguing semantics and also saying that the team does not understand what they are doing. Hardly a problem that can be attributed to Scrum. > The Product Owner rarely owns anything and mostly accepts requests from the Product Manager or other stakeholders. Perhaps the product manager is the right person to fill the role of "Product Owner", then? The role does not have to be a dedicated person... I don't want to give the impression that Scrum has a "get out of jail free card" here. Most criticisms of Scrum are very superficial and do not actually criticise the essence of Scrum so of course the response is indeed often simply that "you're doing it wrong"... Scrum is not a panacea, on the other hand one should always try to understand the essence of any framework, the point, instead of being hung up on details and semantics. A good starting point is to read the Agile Manifesto and to think about the point.
- mythhabit 2y agoI agree. And it's worth remembering that Scrum is a starting point. The entire point is to adapt the process such that it fits the team/product/organisation, through retrospectives.
- kstenerud 2y agoScrum serves two primary purposes: 1. To force a check in so that everyone keeps the manager up to date. This is annoying for people who already do that as a matter of course, but not everyone is that disciplined. 2. To demonstrate velocity to the higher ups. We can't get away from the fact that upper management needs reassurance that we're not just fucking around. With these bullshit numbers we can make them feel better, and that's just all around a good thing that helps preserve harmony. The moment you try to explain scrum as an efficiency tool, you're on shaky ground. It's a tool to counterbalance human nature.
- sshine 2y ago> It's a tool to counterbalance human nature More specifically, it's a tool for pacing and measuring pace. Like cattle, you kinda go faster when you prod them with sticks.
- choult 2y ago(I promise I know the below is an idealist stance) I disagree; there's nothing saying the manager has to be there. In a properly run team/project with good ticket discipline, managers should get their status updates from the ticketing system. Standups, applied properly, are an infra-team communication tool. They're a formal structure to encourage communications, and raise issues early. They're not a replacement for the informal comms that all good teams do, just a check. Similarly, velocity should only be used by the team - your sprint commit is the output, and the expectation you set for outside stakeholders, and velocity is a tool to help you get better at that expectation setting.
- kstenerud 2y agoYep, I'm aware of how it "should" be. And for smaller companies it's absolutely feasible. But the larger you get, the more layers between people, the less personal connection there is, and so you need formal practices like this to act as grease (and OMG the stuff we have now is SOOOOO much better than the crap of the 90s, even if imperfect). At the end of the day, you take some kind of procedure, modify it to your company's culture, and try to make it work. There's no silver bullet, or even a bronze bullet.
- torginus 2y agoImo the fundamental failure of Scrum as a planning methodology stems from the fact that it gives user requirements ('user stories') to developers and expects them to translate them to a technical implementation almost as an afterthought that's barely acknowledged in the framework. Most of us work on huge codebases with tons of baggage and hundreds or thousands of engineer-years invested into it. Implementing a feature into such codebase requires a combination of architecting, reading the code and experimenting - making the change is usually easy compared to that. Scrum has no proper way of handling these activities. - Figuring out how to do the feature is usually part of the 'planning' and 'grooming' activities which are 'invisible work' with timeboxed team meeting slots allocated to it, even though a well-thought out implementation can save tons of time - Just plunging in and doing it means that a large uncertainty exists as to how much effort said feature wil take. This can either lead to time overruns or padded estimates (or both) Scrum just doesnt' offer anything valuable imo. Its just feelgood management consulting ceremonies devs would rather do without. And I haven't even touched on the tyrannical micromanagement dark patterns it enables.
- itronitron 2y ago>> a well-thought out implementation can save tons of time I think there is a bias for many developers to feel like they are not doing anything unless their actively producing/editing code. Once I realized that I could just state in a standup that I was 'investigating' and 'researching' the best approach to XYZ then I felt a lot less resistance to the process.
- lupusreal 2y agoAlmost all standups I've been in have abused the "investigating loophole" egregiously. There is only investigation and completion. Day 1 through N: "I'm investigating X" Day N+1: "I checked in X and am now investigating Y"
- Arnt 2y agoI've worked somewhere where that would be like this... Days 1-N: Investigating. N+1: "I've made a WIP PR, who's free to look at it with me?". N+2 would often be "we've merged" but it could go differently. The whole process made a lot of sense to me. I like Scrum.
- mjfisher 2y agoI'm surprised no one yet - either in the comments or the article - has talked about the most important and powerful part of Scrum: having a singular sprint goal aligned with a higher level product goal that the entire team is dedicated to. That it's also the most difficult or commonly ignored part of Scrum might also be relevant.
- dsalfdslfdsa 2y agoProbably because it's almost impossible (and probably co-incidental when it does happen) to align all software engineers on a team to a common outcome at all times. Nor should you.
- DeathArrow 2y agoI thought scrum is a stick management uses to threat the working people with.
- DeathArrow 2y agoIf someone worked with both Scrum and Kanban, can you tell us which one feels better for a team? I only experienced Scrum.
- ixs 2y agoWorked at a web property that took scrum, used it and found it lacking in certain cases for development. They Extend it And called the new creation beyond scrum, abbreviated as BS snickers. Unrelated to the shortcomings we found that Scrumm with the timeboxing concept did not work for infrastructure teams. You cannot just time box most Infrastructure task and just ship whatever you have when you exceeded your initially planned timeframe. We came up with Kanban as a way to document progress. The swimming lanes together with a limit on things that can be simultaneously in flight served to mirror reality as an operational team much better than pure Scrum.
- saratogacx 2y agoDifferent paths for different styles of work. In my experience you have teams who can have a pulse with the incoming work, more often development, so being able to limit the disruption makes scrum easier to work with. On the other hand, if you have a team who is going to be working on more "at the time" needs, Kanban lets the disruption get absorbed in real time while the team gets to focus on the WIP pipe. I've seen it used most successfully in teams that have smaller, more isolated tasks to deliver that are able to be isolated to the scope of the team. Intra-team coordination with Kanban is more difficult than scrum (but doable) as long as the working model is understood on all sides. My preference is to operate more in a Kanban model but when working with other groups who operate with scrum you need to tweak things to integrate. It also isn't a system that, once picked, you're stuck with. I had a team who did scrum for a few weeks, twice a year during organizational planning so we are kept in rhythm with the rest of the company. Once we had a good enough idea in how we were going to move forward, we switched to kanban to manage our work until the next Co. planning cycle. There's no true Scotsman when it comes to planning and agile and you'll never find a definitive correct answer that can be broadly adopted. Being open to change to make it work with your org and the people you work with is going to get you closer than blindly following any strict dogma. // ramble
- Scarblac 2y agoAt its best, Scrum can be a tool to limit manager micromanagement (only at the level of a whole sprint), while also empowering the team to work the way it considers most effective because everything Scrum suggests as defaults (like what meetings to have and what their goal is) can be changed by the dev team. In practice management doesn't give a iota about what Scrum says their role is and everything becomes discussions about what Scrum does or doesn't say. All that said, Scrum also completely ignores design work.
- torginus 2y agoIn my experience Scrum is the worst enabler for micromanagers - PO suddenly wants to do something yesterday - they just give their task top priority so you're forced to do it - PO want the button to have that exact shade of teal - they won't accept the story until it looks exactly like what they wanted - You want to clean up the messy code you're touching - just make a story for it and watch the PO rank it to the bottom (essentially meaning it'll never get fixed) - since it has no 'business value' This leads to demoralized devs working on crap codebases they're not allowed to fix.
- mytailorisrich 2y ago> - PO suddenly wants to do something yesterday - they just give their task top priority so you're forced to do it That's fine. It's their role to prioritise features. BUT within the framework this should apply to the planning for the next sprint as the point is not to interrupt the current sprint unless there is an overwhelming reason. > PO want the button to have that exact shade of teal - they won't accept the story until it looks exactly like what they wanted Nothing wrong with that. It comes down to explicit and clear feature specification. > You want to clean up the messy code you're touching - just make a story for it and watch the PO rank it to the bottom (essentially meaning it'll never get fixed) - since it has no 'business value' This situation applies whatever the framework you're using. You need to sell what you want to do by explaining the value, or you do it step by step under the radar. There should also be someone with clear authority over the codebase who can make these decisions and sell them/negotiate with project management. Again this is not Scrum, but software development in general...
- cbsmith 2y agoPart of the joy of a dysfunctional organization is how that dysfunction shows in how they adopt processes. If you're an experienced scrum practitioner and you don't have criticisms of scrum, that's unusual enough I find it hard to take you seriously. Like any tool, even if you love the tool, if you don't have any criticism of it, my first instinct is to think you haven't really used it that much. The source of the "Get Out of Jail Free Card" is that there is no belief in a "one-size fits all" agile methodology. If you don't adapt ("continuously change") Scrum to fit your organization & team, it's very unlikely you'll succeed. Similarly, if you only adopt portions of the methodology without a lot of deliberation (and experimentation), it's very unlikely you'll succeed. Scrum (and one could say the same thing about any methodology) is a very delicate balance of tensions between various trade-offs. Organizational have their own unique tensions, and you have to adjust your methodology's trade-offs to fit your organization to establish that balance. It's even harder than it sounds, because organizations have such massive inertia. Changing organizational behaviours is difficult and slow. My observation has been that when you bring a new methodology (any methodology!) into an organization, you're typically going to find that at least initially, the methodology changes more than the organization. I usually find that for a large enough organization, barring some massive disruption to the organization (like mass layoffs or mass hiring), if they're really committed to making a change, a year into the adoption of a new methodology, more often than not, they're still in a "fake it 'til you make it" stage. People will be using the vocabulary/colloquialisms/etc. of the new methodology, but the actual execution will largely resemble the methodology, such as it was, prior to the introduction of the new one. That's actually what progress looks like! Slowly but surely, behaviours will start to change to more closely match the way people are talking/thinking about the new methodology, but it's going to be brutally slow. There's an old expression in the Scrum world, that if you manage to be successful without making any adaptations to Scrum, you almost certainly were successful before you adopted Scrum, and you would probably have been successful even if you had never adopted Scrum. Not that Scrum can't be helpful, but it's just so unlikely to arrive into your organization already fit for purpose. At that point, empirical analysis of the methodology is more an empirical analysis of the organization and/or the old methodology than the new methodology. So yeah, when I read someone saying that Scrum has a 'Get Out of Jail Free Card', particularly if that seems based on their anecdotal experiences with it, rather than some kind of broad survey of outcomes, that seems more reflective of their context than of Scrum. My expectation is that their context is shaping how they perceive Scrum, or any new methodology. If "Methodology X" had been adopted instead, it's quite likely there'd have been a similar perception of "Methodology X" if it had been adopted instead. Now, it's possible to read this and say I'm just reinforcing the article's notion that you can't evaluate methodologies. I'm not saying that. You can evaluate methodologies, but it's hard to construct a meaningful evaluation. You'd either need an insane amount of controls, or you'd need a broad enough sample set that organizational noise balances out enough that you can get a read on the signal. Most of us aren't in a position to do that. Even if we were to do this and we found a signal, there's enough variance from one context to another that any particular organization might observe wildly different outcomes. tl;dr: While development methodologies can have impact, they are far from the most important driver of outcomes. So yeah, a good or bad outcome is far more likely to be driven by other factors. That you must control for other factors isn't a "get out of jail" free card. It's just scientific reality.
- jillesvangurp 2y agoIt's a planning tool that is useful in situations where people otherwise have a hard time planning things. This is very common in the industry. Software engineers are poor at estimating their work. Managers in turn tend to have a poor grasp of how hard or easy things are. Scrum is a tool you can use to get some sensible decision making in place. I'm actually not a huge fan of scrum and the mindless activism around it but it's probably not worse than most alternatives. Including the default herd of cats type situation that lots of people seem to default to, which is definitely not great. I default to vaguely Kanban; regardless of the process of others around me. When in a scrum environment, I just just make sure that my TODOs are aligned and prioritized correctly. When not, same. My main criticism of scrum is that it leads to consensus based decision making where consensus drowns out expertise. If not managed properly, it promotes a culture of mediocrity. You get people in junior management roles (which is what the PO role typically is) overruling experts around them. Easy things become hard, and hard things become impossible. Sometimes you just need to let the experts to do their thing without micromanaging them. Another problem is that it drives teams to iterate rather slowly (weeks); which creates issues if you want to be more agile and e.g. practice continuous deployment, which I would argue should be the default these days. This is something that can be managed by a good team but it needs active managing. I tend to completely decouple planning from releases. We release regularly and we only release good stuff. Anything not making the cut goes to the next release. This happens regardless of any sprint plannings and what not. Yet another problem is that doing scrum in large organizations creates all sorts of process bottlenecks. Orchestrating large amounts of teams is a non trivial problem that scrum does not provide solutions for. Naive versions of this (synchronized sprints, scrum of scrums, etc.) naturally lead to waterfall style development cycles where nothing happens quickly anymore. This too can be managed but I've seen a few places where this became a ritualistic mess that involved lots of wasted time, people in pointless roles without having much impact, etc. You get teams working around each other, doing conflicting things, and worse. I don't think Google, Meta, MS, Apple, or similarly large software development organizations talk a lot about their internal processes. But my impression is that they mostly don't seem to be doing scrum; or at least they don't talk a lot about doing that. Correct me if I'm wrong. The above might be why.
- xnx 2y ago"If Scrum doesn't work, it's because you're not doing it right." Seems like a form of https://en.wikipedia.org/wiki/No_true_Scotsman https://en.wikipedia.org/wiki/No_true_Scotsman
- RajT88 2y agoI view the arguments about dev process to be similar to arguments about parenting. There is some consensus that having some structure is generally better than having none, and the specific merits of different structure and process are subjective. i.e. Having parents is generally better than having none.
- pyb 2y agoScrum is a developer empowerment tool that turned into a micromanagememt tool. A stupendous own goal for the software development community.
- Fire-Dragon-DoL 2y agoThe main reason why scrum is broken is because companies completely fail to adopt the foundation over which is built, that is the Agile manifesto (and they claim to be agile!): https://agilemanifesto.org/ https://agilemanifesto.org/ The first line states: Individuals and interactions over processes and tools But whenever scrum is involved, process is given priority. Anyway, design your process for your needs.