4 ms·
> costly on-site last minute design changes I clicked through to the actual study ( https://www.cell.com/joule/fulltext/S2542-4351(20)30458-X?_returnURL=https%
by phendrenad2 3y ago
> costly on-site last minute design changes
I clicked through to the actual study ( https://www.cell.com/joule/fulltext/S2542-4351(20)30458-X?_returnURL=https%3A%2F%2Flinkinghub.elsevier.com%2Fretrieve%2Fpii%2FS254243512030458X%3Fshowall%3Dtrue https://www.cell.com/joule/fulltext/S2542-4351(20)30458-X?_r... ) and I couldn't find a single sentence mentioning on-site last-minute design changes. I searched for "change" and tabbed through all of the results. The closest thing was mention of Westinghouse changing construction standards halfway through an ongoing project, which required many changes to the project design. But, that's one project.
So my question is: Is it possible that the MIT News Office can't understand MIT journal articles?
- bpfrh 3y ago"Our results point to a gap between expected and realized costs stemming from low resilience to time- and site-dependent construction conditions." Couldn't that be paraphrased to "last minute changes"?
- magicalhippo 3y agoFrom the article's own summary: Our results point to a gap between expected and realized costs stemming from low resilience to time- and site-dependent construction conditions. Guess that's where they took it from. Skimming the paper it seems a large part of the issue is that it's difficult to mass produce something which needs to be integrated into a variable environment, and attempting to do so is detrimental compared to custom solutions. This seems to mirror what I've found in the software world, where a custom integration is often much cheaper and easier to maintain than trying to manhandle some generic library/software to do what's needed.
- mixdup 3y agoThere's got to be some middle ground between every reactor in the country being absolutely bespoke and on the other hand trying to build them in a factory like modular housing. IIRC one of the big differences/problems is that every one of them have completely different control rooms and control systems. To the point that you cannot train on one reactor and walk into another and operate it. If we at least standardized that side of things, the cost of operations would surely come down I also question (and happy to be enlightened about) how much the local project needs some massive change. That a pipe might need to be a few hundred yards longer to reach the river surely isn't so consequential that you can't reuse designs These things are built on huge sites that could be completely leveled and turned into identical square clean pieces of dirt with massive empty land around them How much variation can there possibly be that can't be handled outside of the critical reactor design area
- magicalhippo 3y agoYeah, I can't shake the feeling it should be possible to mass produce most of the difficult bits, and then have a per-site specific foundation of sorts. Then again, perhaps it is one of those things where you actually need to make a few of 'em to gain experience.