3 ms·
Indeed in an off-grid build, I know someone that optimized their panels to produce earlier in the morning instead of maximizing production, because switching of
by Scoundreller 3y ago
Indeed in an off-grid build, I know someone that optimized their panels to produce earlier in the morning instead of maximizing production, because switching off battery power a little earlier was most valuable to them. Losing some throughout the day and evening wasn’t as much of a concern because they were primarily charging for night-time.
Focussing rooftop installs that have a more eastern or western angle, or steeper slope, could be a way of flattening this curve.