8 ms·
This is such a bad DIY project because the costs of screwing up can be burning your house down. This is non-trivial amounts of power. If you spend the money fot
by greenthrow 3y ago
This is such a bad DIY project because the costs of screwing up can be burning your house down. This is non-trivial amounts of power. If you spend the money fot an EV, buy something safe and have it professionally installed. Keep the DIY projects to something less dangerous.
- thebigman433 3y agoI love higher power DIY stuff in general, but yea this project really doesnt thrill me. It does sound like the author did adequate research, which is good, but the soldering joints dont inspire a ton of confidence in overall quality. Stuff like this is absolutely what I would consider "worth" paying a professional to do. Especially since buying a retail unit/paying a professional to install it will come with warranties.
- wannacboatmovie 3y agoSoftware engineers have a tendency to overestimate their own abilities, the arrogance is often on full display here for all to see. Maybe we need a few to burn their own houses down to act as a deterrent and encourage others to stay in their lane.
- newZWhoDis 3y agoSome of us here are actually Engineers (Electrical). I’ve installed 3x 240V 60A EV chargers, was a cakewalk. I didn’t build my own in this case since I was going for an aesthetic match. Meanwhile you can enjoy paying some alcoholic $1000 for 30 minutes of work to: * pop out a hole on the back * Tap and install 2x screws into studs * pull 3 wires 6” through, wrap around the strain relief, strip/insert/torque * flip a breaker It’s not rocket science, as long as you’re not a complete idiot and turn the breaker off before hand it’s completely safe. 240V isn’t even “high” voltage.
- shmoe 3y agoYou're 100% right, but it not being "high voltage" is totally negated by the fact that the two legs together will kill me if it seeks ground via the right (wrong?) path for sure.
- balls187 3y agoDon't work with a live panel.
- repiret 3y agoI know a few electricians, and none of them would agree with you. There's some things that can't be done safely on a live panel, but there are some things that can.
- balls187 3y agoIt's very hard to imagine any electrician advising a DIY homeowner to install a 240v line on a live panel. It's not difficult to do, which was GP's original point--though you need to take safety precautions (in addition to researching local code requirements).
- repiret 3y agoMy point is that electricians work in live panels all the time. (And the voltage of the circuit being installed does t matter. No matter what you install, the panel has 240V with approximately zero output impedance. I don’t know what advice an electrician would give, but the advice I give is that if you don’t feel like you can safely install a new circuit on a live panel, you probably just shouldn’t install new circuits.
- balls187 3y agoFirst, it’s a bit more complicated than that—unless you went ahead and installed a 60A line without checking if your service(s) can handle the additional load. Advice like this is what gets people to screw up. Second, what’s the material difference between a 40A circuit and a 60A circuit? A few extra hours overnight to charge?
- sib 3y agoWell, there are times when you're not charging overnight (e.g., get home with low battery, realize you only have 3 hours before next outing) and you get 50% more charging done in the same time, without having to go out to a Supercharger / DCFC. Or, as in our case, we have two EVs - speed is useful sometimes.
- aaronmdjones 3y agoThe control pilot PWM signal at maximum duty only gets you 32A (~7kW). It doesn't matter how much the circuit breaker is rated for; the car isn't going to draw appreciably more than 32A. Higher charging currents are instead handled by distributing it across multiple phases. For example, a 3-phase 230V EVSE will give you ~22kW. EDIT: Even-higher-still vehicle charging is handled by having a charger outside of the vehicle and feeding the vehicle with DC, which is what e.g. Tesla Superchargers do.
- sowbug 3y agoI've hired enough licensed, bonded, certified, well-recommended, well-reviewed professionals who completely botched the jobs* to agree wholeheartedly with your sentiment. You can't hire someone without thoroughly understanding what they're doing, and once you reach that level of understanding, you absolutely can make an intelligent decision whether to buy or build. At the point where my house burns down, I really don't care about the credentials of the person who made the mistake. Rather, I personally make sure my house doesn't burn down. * Solar panels installed facing North in the Northern Hemisphere; rapid-shutdown switch installed inside a home; supply side of 240v connection to backyard office has male prongs; fence built with non-pressure-treated wood contacting the soil. The list goes on, and these are only the errors I've discovered in 20+ years of being a homeowner.
- jacquesm 3y agoIf only it was just the tradespeople. I've had an electrical inspector argue that I should route the ground from my windmilltower into the house and bond it to the distribution panel rather than to ground the windmilltower at the base of the tower. So in case of lightning strike (which is pretty much a given) that would invite that lightning into your home right at the distribution panel. People may be following 'the code' but that doesn't mean they actually understand what they are doing. He wouldn't take responsibility for it, I asked him to put it in writing as an instruction and sign off on it so I could pass it to my insurance company. That never happened...
- amluto 3y agoI don’t know the whole setup, but the inspector is likely right. When you have a feeder to an outbuilding (or external structure or piece of equipment or subpanel or basically anything else), you supply it with the intentionally current-carrying wires and the ground. (Ground may be called “equipment grounding conductor” or “protective earth” or perhaps something else in your jurisdiction. It’s a wire or the metallic conduit you used.) And this is important for lots of reasons. If there is a fault from a hot wire to a grounded object, this (if done correctly) allows the upstream overcurrent protection to trip. And it minimizes the voltage rise of the object that gets energized. And it keeps the line-to-ground voltage within spec. And using a separate ground means that the voltage of “ground” doesn’t get pulled up by resistance in the neutral wire and that current doesn’t normally flow through “ground”. You should, of course, also connect the ground wire to Earth, well, at the base of the structure. And possibly also install something to help conduct lightning currents from the non-ground conductors to ground in the event of a lightning strike.
- Panzer04 3y agoIt looks like all he’s doing is switching mains voltage, so it doesn’t seem that dangerous. There isn’t much that can go wrong with the high-power side of this system.
- Kirby64 3y agoTBH I’m less concerned about dangerousness… but the costs listed are so much, whereas commercial EVSEs are so cheap. You can buy a 40A 240V capable EVSE for like $200-300. The OP says they bought the cable for $120… why not just have the rest of it for a small additional cost?
- sowbug 3y agoIt is surprising to see this question on HN. We regularly see Show HN projects that cost tens of thousands of dollars in time (assuming a typical software engineering hourly rate), but that aren't all that innovative compared to existing options. And we love those projects. Why would DIY effort outside the software domain be any different?
- stefan_ 3y agoBecause the project makes the claim that it was to save cost. The reality is that most of the cost is in paying an electrician for the install, and since he did that part himself anyway he could have just went for an off-the-shelf certified charger.
- shiroiuma 3y agoI don't think this is a valid comparison. In DIY projects, your time is free: you don't count your engineering hourly rate as part of the cost of building the thing. The only cost is the actual costs incurred, which is mainly parts and materials. So a Show HN project that's purely software effectively is worth $0, because the creator made it in their free time, instead of spending that time playing video games or watching TV or whatever. And a Show HN project with a lot of software running on a RasPi effectively costs only what the RasPi cost the author. Here, people are complaining about the actual hardware cost to the creator, not the creator's time spent, which you're also ignoring.
- sowbug 3y agoWhen I was 20 years old, I would have agreed with your position. But that was a long time ago. Everyone, no matter how materially wealthy they are, gets 24 hours per day. That time is, by definition, 100% of the time that you'll get, which means that its value (intrinsic) is nearly infinite. This is true even if its price (extrinsic) is zero. My point in mentioning an engineering rate was not to quibble about what free time costs. It was to say that even if someone confuses price with value, we can agree the the value gained from time well spent is very high. So it seems strange to criticize a hardware project that had $X of "hard" costs, $Y of "soft" costs, and $Z of benefits, when we regularly admire software projects that are valued identically, except that $X is close to zero. $X + $Y + $Z = a huge net positive value (judging from the number of HN comments and votes, as well as the pride that OP shows in the writeup). For many of these Show HN posts, it doesn't matter if $X is $300 or $0; the math still evaluates to awesomeness.