3 ms·
General Electric claims 5 minute startup time for their combined-cycle 50-megawatt turbine.[1] They've shipped 1200 of those. [1] https://www.ge.com/gas-power/
by Animats 3y ago
General Electric claims 5 minute startup time for their combined-cycle 50-megawatt turbine.[1] They've shipped 1200 of those.
[1] https://www.ge.com/gas-power/products/gas-turbines/lm6000 https://www.ge.com/gas-power/products/gas-turbines/lm6000
- imtringued 3y agoYou didn't read the combined cycle section which claims a cold iron start takes 30 min for combined cycle. That is plenty fast though.
- Animats 3y agoAh, right. Have to click on the combined cycle options to see that.