3 ms·
Little or no mention of the back end of the machine. The front end, where cutting takes place, gets all the attention. The segment placing arm got a mention. Bu
by Animats 3y ago
Little or no mention of the back end of the machine. The front end, where cutting takes place, gets all the attention. The segment placing arm got a mention. But most of the length of the machine does other things.
The usual TBM setup has a two-track narrow gauge railroad behind it. Segment cars bring ring segments forward, and muck cars remove the spoil. Track cars bring more railroad track. Tool cars and worker cars are in the mix occasionally. All this is happening on an unfinished railroad, because the back end of the TBM has to lay the track and move cars from one track to the other. All the stuff for this takes up more length than the cutting part. A tunneling project is an entire construction site compressed into a long, narrow hole. So logistics in the tunnel are a big deal.
Now, this is where The Boring Company was expected to innovate. Something involving driverless Tesla chassis, maybe. But they never did. Others have built such systems.[1]
But not The Boring Company.
[1] https://tunnelingonline.com/mobiletronics-demonstrates-autonomous-tbm-supply-vehicle/ https://tunnelingonline.com/mobiletronics-demonstrates-auton...
- foota 3y agoJust curious, if the rails are such an issue, is it not just cheaper to drive the cars (no need for self driving?) or is paying someone to do it not worth the complexity savings? Or are there other downsides to not having the rail?
- bluGill 3y agoA tunnel is round, driving cars on that and passing is hard. Narrow tunnels especially
- Animats 3y agoEither each car needs a driver or you need something to keep all the trailers precisely lined up. One new system has that; a human drives the "locomotive" and the trailers have automated steering to follow the lead vehicle precisely enough to not bump into traffic in the other direction. This is still experimental. At the other end of the line, outside the tunnel, there's a whole rail yard. The different kinds of cars have to be sorted out, loaded, and unloaded. So there's a need for a big staging area. Here's an overview of traditional tracked systems.[1] I've tried to find a video of the back end system and yard, but nobody seems to make such videos. It's too boring. [1] https://www.robbinstbm.com/products/tunnel-boring-machines/back-up-systems/ https://www.robbinstbm.com/products/tunnel-boring-machines/b... [2]
- ThePowerOfFuet 3y ago>It's too boring. I see what you did there.
- foota 3y agoI guess I'm trying to understand how much of an opportunitythere is here, and assuming the existing tunnel boring companies have at least considered this, I guess the most possible gain you could get out of this would be whatever it would cost to pay people to do it manually (otherwise, the pros would out weight the cons, and a company would have done it that way). But I wouldn't have thought it would cost that much to have people do this, so Im left unsure how large the opportunity is here.
- drewmol 3y ago<rubber tired vehicle back-up systems tired vehicles
- TeMPOraL 3y ago> Either each car needs a driver or you need something to keep all the trailers precisely lined up. A perhaps very stupid question, but why not make the cars self-driving the way we built self-driving robots from LEGO as kids? That is, line-following cars. It's effectively a virtual track - but I imagine painting a line or building it from cheap plastic would be cheaper than putting actual rail tracks in, and unlike generic driving automation, line-following is an old, well-understood and solved problem.
- cwillu 3y agoIf the Boring Company mention was an attempt to combat the hype (“everybody is talking about yet another musk company”), you've contributed to the problem in much the same way as the saying regarding traffic: “You're not stuck in traffic, you are traffic.”
- aorloff 3y agozinger