Brownouts and blackouts lasting for weeks during windless winter weeks are hardly solution.
by matkoniecz 3y ago
Brownouts and blackouts lasting for weeks during windless winter weeks are hardly solution.
- KSteffensen 3y agoCan't we fill the Sahara with solar panels? If transmission lines are problematic hydrogen or methane could be used to transfer the energy to where it needs to be used. This of course has a lot of political implications, but if we wanted to do it we could.
- pfdietz 3y agoAnd quite avoidable, even on a 100% renewable grid.
- matkoniecz 3y agoI was responding to " So make the factory, AC, etc... vary the load! " that proposed blackouts as solution.
- pfdietz 3y agoThat post did not propose blackouts as a solution.