>breaking creative work down into bite-sized chunks In my decades of experience in multiple companies doing 'agile', that's something that we've always ostensi
by Falkon1313 3y ago
>breaking creative work down into bite-sized chunks
In my decades of experience in multiple companies doing 'agile', that's something that we've always ostensibly strived for, but in practice it almost never happens in reality. At least not as intended. Occasionally it happens, but only by pure chance.
It seems the 'agile way' is to attempt to manage a project by taking a sizable but coherent and cohesive concept/feature/requirement/design/plan, shatter it into a thousand incohesive random fragments of varying sizes (all estimated to be bite-sized, but true size unknown until they're actually done).
Then everybody grabs a few fragments and works on them, placing them somewhere more-or-less where they're hopefully supposed to be, hoping that in the end everything will come together somewhat similar to the picture on the box. Then everybody has to try to duct-tape and glue them all back together again on a herky-jerky schedule, like doing a puzzle with constant interruptions and distractions for the agile rituals.
The results aren't necessarily worse than waterfall/BDUF, but not necessarily better either. There is in truth a lot more potential to course-correct along the way. But since everyone's spastically going different distances in different directions at different speeds on as-yet-unconnected fragments of varying sizes, and no one can see the big picture, that theoretical course correction en-route is not nearly as powerful as it sounds.
I've seen some debates about shorter vs. longer sprints. The die-hard agile people tend to push for the shortest sprints possible or even shorter, leaving no time whatsoever to clarify requirements, work out integrations, or do any QA/testing. No time for thought at all, just spit out some code, any code, as fast as possible and then it's review/demo/retro time. The veterans push for longer sprints, with time to understand and coordinate, experiment and test. But that gets a lot of pushback for not being agile enough, so we usually end up somewhere in the middle. And a lot of things don't fit neatly into that timeframe.
Which in my opinion is not the worst thing, but also nowhere near as efficient or as effective as it could be if things were not broken into bite-sized chunks with arbitrary deadlines, but instead developed as parts of a cohesive whole. Whether from the foundation up (risky) or by building vertical segments and linking them together.
"Move fast and break things" indeed. That's the state of the art - breaking things as fast as possible. We could do better.
- chii 3y agoIt all stems from the desire by stakeholders (who are paying the money) wanting to know when something is gonna ship, before committing the money. I think it should just be accepted that it is not possible to know. Unlike building a building, you cannot know. It is possible to do a feasibility study, or a prototype, and time box it, but that is as good as it gets. The stakeholders don't want to hear this unfortuantely. They refuse to believe it isn't possible to know ahead of time how much work is needed. In order to appease, the engineers and managers have developed a set of "practises" such as agile, but in the end, it is a lie.
- ResearchCode 3y agoYes. Nobody asks a mathematician to "story point" the conjectures they are working on. Nobody asks them for daily status updates. This is pure and harmful micromanagement because software engineers are not saying stop it.
- ResearchCode 3y agoThe optimal sprint length is none. It's an awful concept that is misused to micromanage highly skilled professionals that often didn't learn to say no. You want to work on three to six month projects, not two week "sprints".