Fuel is hardly the only advantage, the major issue with fission is the enormous costs of trying to avoid problems or cleanup after them. Thus 24/7 security, red
by Retric 4y ago
Fuel is hardly the only advantage, the major issue with fission is the enormous costs of trying to avoid problems or cleanup after them. Thus 24/7 security, redundancy on top of redundancy, walls thick enough to stop aircraft etc. Fission is still by far the most expensive power source even with massive subsides and is only even close to economically viable as base load power backed up with peaking power plants.
In theory much of that is excessive but there is a long history of very expensive mistakes with massive cleanup efforts. The US talks about three mile island as the largest nuclear accident ignoring the Stationary Low-Power Reactor Number One that killed 3 people. All that complexity and expense comes from trying to avoid real mistakes that actually happened.
- Galaxeblaffer 4y agothis is simply not true. according to IEA https://www.iea.org/reports/projected-costs-of-generating-electricity-2020 https://www.iea.org/reports/projected-costs-of-generating-el... LCOE of nuclear is cheaper than almost all other possibilities we have. sure nuclear is very expensive up front, but a nuclear powerplant can run for 100 years while wind and solar had to be completely replaced every 25 years. your correct that nuclear has had some very expensive accidents, but the chance of a modern gen3+ plant that we'd build today causing any accidents like that in a western country is so very close to 0 that it's not even worth discussing.
- Retric 4y agoYou see a lot of handwaving such as that very close to 0 statement with nuclear but someone’s got to be on the hook. The rate and cost of failures directly relate to insurance costs. A 1 in 100,000 chance per year to cause a 500 billion dollar accident represents a ~5 million per year insurance cost to offset that risk before considering the risk premium associated with insurance. And that’s on top of the normal risks for large complexes that have little to do with nuclear just high voltage equipment etc. Unsubsidized insurance costs are something like 0.2c/kWh which is quite significant for these projects. In the end you see a lot of people talking nonsense around nuclear costs using wildly optimistic numbers, but there hasn’t been a power plant built and operated in the last 20 years that come even close to these numbers. Let alone when you start to compare predictions for decommissioning costs with actual decommissioning costs.
- nwiswell 4y ago> but there hasn’t been a power plant built and operated in the last 20 years that come even close to these numbers If we are being honest, that also has a lot to do with why nuclear is so expensive.
- Retric 4y agoSure, I have no issue saying nuclear could in theory cost 40% less with reasonable regulation and a large scale deployment across decades. I just have problems with people saying well it could in theory cost X, therefore it does cost X.
- Galaxeblaffer 4y agothat's simply still not true. the last three plants built in Europe (England, France and Finland) has been very expensive because they've all been first of its kind and there hasn't really been built anything else. but if you take a look at what's happening elsewhere in the world KHNP for example has their standardized APR1400 https://en.m.wikipedia.org/wiki/APR-1400 https://en.m.wikipedia.org/wiki/APR-1400 reactor that seems to be very affordable Poland just decided to build our nuclear to the tune of 40bn eur and their first contract is with westinghouse and their ap1000 reactor but also signed a letter of intent with KHNP to also built out further. I'm sure they cost Westinghouse for strategic reasons though and not because of price. heck.. even Finland with their massively delayed and over budget Olkiluoto 3 also plans to built out even more nuclear. it's almost like some countries are now realizing that putting your faith in the weather gods for supply safety is not a good idea and that solar and wind are simply not viable for baseload or the grid in general. i still think wind and solar has a place for creating synthetic fuels, but let's stop pretending it's been comparable to nuclear for the grid. edit: also.. are your saying IEA has wrong data? and if so, would you mind bringing since sources into your argument about people being way too optimistic
- Schroedingersat 4y agoSomeone suggesting the organization which made these predictions about solar https://pbs.twimg.com/media/FOoa6xYXIAQKUnv?format=jpg&name=900x900 https://pbs.twimg.com/media/FOoa6xYXIAQKUnv?format=jpg&name=... and is headed by an ex OPEC employee might be making bad cost projections when real prices of real projects in 2022 have a median far lower than their projection from 2020? Must be a conspiracy theorist.
- fundatus 4y ago> sure nuclear is very expensive up front, but a nuclear powerplant can run for 100 years while wind and solar had to be completely replaced every 25 years. Hinkley Point C is currently expected to cost around $31 billion once finished for a measly 3,000 MW. For that money you could build ~2,300 15MW onshore wind turbines - which would add up to roughly 34,500 MW capacity. So even under the assumptions that - you have to replace the wind turbines 3x to reach 100 years life span and - you always have to build more renewables since they don't run at 100% their capacity throughout their lifespan wind make more sense economically nowadays.
- smeagull 4y agoThe cost of the land required is non-trivial.
- Schroedingersat 4y agoOnshore wind can overlap with pasture land. Offshore wind pays into the public purse now via the leases and still costs about half what subsidised nuclear does. It's still a very young industry.
- Galaxeblaffer 4y agoseriously.. bring some evidence. onshore wind is just not going to happen it just has too many problems. and offshore wind is more expensive, less reliable and takes roughly the same time to build as nuclear. Denmark is currently planning to build a 3Gw energy island that will cost a whopping 40bn dollars and is planed to be finished in 2033. insane if you ask me
- crote 4y agoOnshore wind has been happening for decades. See for example the 1.5GW farm in California, the 1GW farm in New Mexico, the 1GW one in Oklahoma, the 900MW one in Texas, or the 845MW one in Oregon. Offshore has a rather fast construction time, it turns out. For example, the United Kingdom's Hornsea Wind Farm Project 2 was given planning permission in 2016, and it reached its full capacity of 1.4GW less than six years later. Project 1 at the same wind farm reached 1.2GW in less than five years. And when it comes to cost, Hornsea Project 3 is to start construction next year - with commercial operation scheduled in 2025 - at $12bn for 2.4GW. Not bad when you compare it to Finland's Olkiluoto Nuclear Power Plant unit 3 costing an estimated $11bn for 1.6GW - which took 22 years from first license application to design output power.
- crote 4y agoDo you have a source for the 100-year lifetime? Currently a lot of reactors are hitting the 30-40 year mark, and they are running into significant issues with the aging equipment. We are seeing an increasing number of minor incidents, often caused due to manufacturing defects finally rearing its head, or just plain fatigue. Meanwhile, solar has a 25-year economic lifespan. At that point you can make more money by replacing them with more efficient panels. However, manufacturers have already started offering 40-year warranties for consumer panels, at which point they have a guaranteed 88% power output. Wind indeed has a lifespan of 25 years, which seems pretty average when compared to literally any other power plant with moving parts. When it comes to accidents, they are indeed extremely unlikely. However, the figure to look at is the potential damages multiplied by the likelyhood of the accident. When we look at those two together, they are definitely worth discussing.
- Galaxeblaffer 4y agowell i guess a 100 years lifetime was kind of pulled out of my ass, what i was trying to communicate is that you can I'm theory maintain a nuclear power plant to last for 100s of years but i guess if you'd just let it run without doing anything it would probably run for 30-40 years. https://www.iaea.org/newscenter/news/iaea-data-animation-nuclear-power-plant-life-extensions-enable-clean-energy-transition https://www.iaea.org/newscenter/news/iaea-data-animation-nuc... solar is fine for those who can afford it, but workout subsidies and the ability to sell electricity back to the grid it's a crazy long term investment in many places of the world especially northern Europe where I'm from (for hopefully obvious reasons). so different milage may apply elsewhere. i guess we'll have to see if those 40 years are for real and if the companies offering it are even around in 20 years. wind needs constant maintenance to have a 20 year lifespan, but beyond the 25 years you'd have to replace the whole thing. so while a nuclear powerplant also requires constant maintenance you don't have to treat down the whole plant after 40 years. even the German ones that are closing now could easily have their lifetime extended https://www.reuters.com/business/energy/could-germany-keep-its-nuclear-plants-running-2022-02-28/ https://www.reuters.com/business/energy/could-germany-keep-i... >When it comes to accidents, they are indeed extremely unlikely. However, the figure to look at is the potential damages multiplied by the likelyhood of the accident. When we look at those two together, they are definitely worth discussing. i guess what I'm trying to say is that we as a civilization engage in activities that are way more risky and dangerous than the miniscule risk of a serious accident in a modern gen 3+ nuclear power plant. of course we should have strict regulation here, but it's just not that dangerous or risky
- Arn_Thor 4y ago> your correct that nuclear has had some very expensive accidents, but the chance of a modern gen3+ plant that we'd build today causing any accidents like that in a western country is so very close to 0 that it's not even worth discussing. But that's precisely why nuclear power plants are so expensive to construct. If the generation technology was inherently less risky, it stands to reason the facilities would be cheaper to build
- _0w8t 4y agoAny claims about 100 years of trouble-free operations of a nuclear reactor is a wishfull thinking at best. For example, in France nuclear power reactors were stopped because unexpected cracks appeared in pipes after just 25 years of operations requiring expensive maintenance, https://oilprice.com/Latest-Energy-News/World-News/France-Closes-Two-Nuclear-Plants-After-Finding-Cracks-In-The-Infrastructure.html https://oilprice.com/Latest-Energy-News/World-News/France-Cl... That put reactors off-line for over a year. Then Sweeden closed one of its reactors because it bacame unprofitable due to raising maintainance costs, https://apnews.com/article/technology-business-sweden-europe-a08facfe81523e85083e21ffe1ded681 https://apnews.com/article/technology-business-sweden-europe...
- batrastard 4y agoThe most expensive before or after taking greenhouse emissions into effect? Seems like power generation still counts on externalities being external.
- pfdietz 4y agoFusion will also have to go to enormous efforts to avoid problems -- not because of public safety, but because it's very difficult to repair anything in the reactor if it breaks. This was a lesson of Three Mile Island: a nuclear accident that doesn't kill anyone is still ruinous for a utility, since their large investment is destroyed.
- kennend3 4y agoCame here for the F.U.D and you did not disappoint. >. Fission is still by far the most expensive power source even with massive subsides and is only even close to economically viable as base load power backed up with peaking power plants. https://www.statista.com/statistics/748580/electricity-cost-by-source-in-ontario/ https://www.statista.com/statistics/748580/electricity-cost-... Seems Solar is the most expensive, and by a large margin? It looks like nuclear is cheaper vs almost all "renewables"? There is a nuclear power plant ~10KM from me that set world records: - On October 7, 1994, Pickering Unit 7 set the world record for continuous runtime at 894 days, a record that stood for 22 years. Can you provide the number of days that "WIND" or "Solar" have provided continuous power for? That complexity and expense is because you are building machines which can run for 894 days NON-STOP. (CANDU plants can be refuelled while operating) Diesel locomotives are expensive, a lot of this is attributed to the engine designed to run at high-output for an extended amount of time.
- panick21_ 4y ago> the major issue with fission is the enormous costs of trying to avoid problems or cleanup after them. Thus 24/7 security, redundancy on top of redundancy, walls thick enough to stop aircraft etc. A fusion reactor will also require wall thick enough to stop aircraft. Security will likey be the same to. And there is no fundamental reason why fusion should require any less for any of these. In fact the actual cost of nuclear is CAPX and comes from the large civil engineering project with high specification, the steam turbine and water towers. There are lots of fission based reactor designs that have non of these things. So nothing you describe has really much to do with 'fission' itself. Fission plants can also be made so that airborn radiation is practically impossible. We simply stopped fundamentally advancing fission reactors in the early 70s and instead of solving problems fundamentally, we added lots of regulation.