Why don’t software development methodologies work? (2014)
- rapjr9 4y agoI've been writing software for 30+ years and I think the reason methodologies don't work is that they are simple. Software is an attempt to implement something that will be used by people, interact with data, help make decisions, and much more and the real world is extremely messy. People want software to work one way on weekdays and another way on weekends, and differently if it is day or night, across multiple timezones, and in multiple political locations. They want it to know their workflow. They want it know things people know, like the weather or things in the news or specialized knowledge domains. So I think the main problem with methodologies is they do not address the fact that people use software, and all current computers and software are very poor at fitting into human life, desires, and expectations. AI is starting to change that a little, but there is much more to do before computers fulfill their promise. Methodologies may help along the way, but new inventions are probably a greater requirement. Methodologies are how developers interact with software and each other and management, and they won't solve the problem of how software interacts with people and the world. It's the elephant in the room.
- dang 4y agoRelated: Why don’t software development methodologies work? (2014) - https://news.ycombinator.com/item?id=15885171 https://news.ycombinator.com/item?id=15885171 - Dec 2017 (184 comments) Why don’t software development methodologies work? (2014) - https://news.ycombinator.com/item?id=15476638 https://news.ycombinator.com/item?id=15476638 - Oct 2017 (1 comment) Why don’t software development methodologies work? - https://news.ycombinator.com/item?id=7211341 https://news.ycombinator.com/item?id=7211341 - Feb 2014 (197 comments)
- no_wizard 4y agoIt’s funny how it gained more traction later as a trend!
- jdlshore 4y agoI disagree with the fundamental conceit of the article: > But in terms of the only measurement that really matters—satisfying requirements on time and within budget—I haven’t seen any methodology deliver consistent results. What matters is delivering value to the organization, and doing so in a cost-effective, sustainable way. Making plans and then meeting them is incidental to this, and quite often opposed to it.
- ibejoeb 4y agoAbsolutely. It's entirely possible to develop a bad budget or schedule. You don't find a lot of material about that. Hey, I just invented eXtreme Budgeting. If you buy my book, attend my conference talks, and hire my firm the coach your organization through implementing it, you'll be among the A-tier companies that have decided to take budgeting seriously by practicing XB! Who wants to go in on it? "Double-entry bookkeeping is just pair programming for accounting" -me
- fmajid 4y agoSam Bankman-Fried beat you to it.
- lanstin 4y agoWell, I agree but people make investment decisions based on rough estimates of expenses and when the expenses are wildly different from the estimates, often projects are finished that in retrospect would not have been started. Classic example, this system is 99.8% reliable. Polish the last bit or re-architect it? If the rearchitecture is six months with five people, ok do that. When it takes well over a year, maybe more polishing would have been good. Especially when the year was half polishing the new system.
- SpeedilyDamage 4y agoThis was one of my biggest issues with a team I used to work on; they prided themselves on "doing what we said we would do" but just could not grasp how rigid and impossible to work with that becomes when an adjustment is needed. What you said you would do is based on old information!
- Haga 4y ago
- taeric 4y agoI get a huge amount of amusement from the last comment there talking about waterfall being a cruel joke. Especially combined with the view of "Surprisingly, left to themselves programmers don’t revert to cowboy coding—they adopt or create methodologies stricter and more filled with ritual than anything I experienced in 1980." I can't but think of the waterfall process that my team is trying to build right now.
- jsd1982 4y agoThe key insight in this post is in the conclusion section: > My own experience, validated by Cockburn’s thesis and Frederick Brooks in No Silver Bullet, is that software development projects succeed when the key people on the team share a common vision, what Brooks calls “conceptual integrity.” This doesn’t arise from any particular methodology, and can happen in the absence of anything resembling a process.
- lanstin 4y agoThere is no mistaking the magic when a large group of programmers have a common vision, of sufficient conceptual integrity to allow most anyone to make most any decisions (source: programming in the host side team at AOL while the traffic was still doubling every few months), And yet it is I would say very rare to see a good team scale their vision up. AOL was able to onboard new programmers and share the vision, but we never got a different geographic site converted, not really. One tried things with documentation and two person Webex meetings, and code reviews that focus not on being tidy, but here’s how we understand this problem, these are the reasons to do something, this use case is an example of such and such a concept. (Just a final closing comment, be tidy you won’t be happy otherwise.). It can gradually build up over time, but rarely causes teams to catch fire.
- hinkley 4y agoRPI has a degree in information systems management, I think they call it. A coworker enrolled and worked part time while in the program. Apparently they teach that Conceptual Integrity is the dominant factor in project success or failure. Someone has to be able to fit the entire system in their head and when they go it’s all downhill. Some processes try to break conceptual integrity. Micro services are one but Scrum as practiced usually tries to stick people into a blind valley where the horizon is months out rather than years. That leads to bad minmaxing behaviors, and/or covert channels being used to keep the wheels on. Scrum theater is especially grating when people who make the sausage have to listen to zealous managers brag about how the process is the source of all of their success. Since they don’t know where the success comes from they don’t see it leave the building to be appreciated somewhere else. The second time it was my circus, my clowns, someone had divided the backend and front end people into different groups and it was a shitshow. Until I/we discovered that diagrams of user interactions were less than useless for preventing impedance mismatches between the tiers. What you needed were data flow analyses. Particularly for complex data entry workflows. C comes from B, B comes from A. Rework dropped like a rock once I incorporated this into kickoff meetings.
- Zigurd 4y agoWaterfall is great for projects that have predictable tasks with significant internal dependencies. Software is less predictable, and, with modularity and unit tests, has fewer hard dependencies that prevent other tasks from starting. A kanban board with simple task descriptions is far less overhead than recalculating a critical path method analysis for every change in a project (without much to gain from doing so). Agile OGs will tell you Scrum is too-often a way of bureaucratizing Agile and making is safe (SAFe?) for managers who demand predictability. If you don't let a small-a agile approach emerge in a way that is appropriate to your project, in your organizational setting, you just end up with a different flavor of bureaucracy. When planning and budgeting there is a lot to be said for traditional project management methods. They are more predictive than a spreadsheet full of task estimates. But if your team doesn't know why running a project off a Gantt chart fails so often, they won't know which parts of agility are most important to their project.
- lanstin 4y agoIf you want big wins, then what you are doing is going to have variance. All these solutions are new, and the data to make it predictable is not sufficient to predict, u less you just slow everything down to a pedestrian rate, succeed at predicting that, and then get replaced by some order of magnitude better competitor.
- commandlinefan 4y ago> the data to make it predictable is not sufficient to predict What's particularly ironic about the methodology obsession is that if a perfect methodology came along that could reduce software development into cookie-cutter assembly-line work then, while programmers would be reduced to minimum wage janitors, the managers that insist that WE'RE the problem because we can't do complex things in the blink of an eye would be reduced to spreadsheets.
- SpeedilyDamage 4y agoI think of small-a agile as a tool chest you rifle through to solve a problem you're encountering, but only once you've encountered it. You just have to be good at knowing what the problem patterns look like is the only trick to this, and not let something get out of hand when there's a ready-made tool available to fix the issue.
- ravenstine 4y agoThey don't work because they're pseudoscience. Just because a methodology appears to work for one or even multiple organizations doesn't mean it's going to work in every case. No one actually knows that FrAgile, SCUM, or TeeDeeDee are universally better than just having a bunch of programmers self-organize. There's no well controlled studies that show anything other than a weak association between hip methodologies and measures like productivity or profit, and no one has demonstrated actual cause and effect. That probably won't happen because these are purely human systems, and good luck controlling for that. It's fine to consider methodologies, but there's no reason to believe that the people who invented or tout said methodologies should be blindly trusted. They discovered something that they believe worked for them, and that's it. They're not smarter than you. Only use aspects of methodologies that you would use or that you have seen work, and don't do anything that seems stupid or that you would dread.
- daveslash 4y agoThat's right. Plenty of great software has been developed by the "lock a smart, creative, determined nerd who's _obsessed_ with his/her product in a garage for a month" methodology. Folks who have bought into the vision of the project and are motivated to "do it right, make it good" have a much higher chance of a successful product than a team who are attending the religious ceremonies and cargo-culting. These methodologies are like painted-lines and highway-signs; they can be great guidelines, but ultimately the driver has to want to avoid getting into an accident and aware enough to realize blindly following the lines/signs won't achieve that on its own. Edit: *I use "nerd" here as a term of affection, not derogatorily. I proudly call myself a nerd. :)
- ROTMetro 4y agoI gotta gatekeep this. When did nerd and geek switch places? Since the 90s, geeks and nerds are two totally different things. Geek: a person who is knowledgeable about and obsessively interested in a particular subject, especially one that is technical or of specialist or niche interest. "a computer geek" I'm a proud geek, but after bullying as a kid calling me a nerd is fighting words. A geek nowadays socially ranks above the people that tried to stand above others by calling them nerds, turning labels into strength.
- __lbracket__ 4y agoPrimarily because knowledge work is hard to quantify. If you can't measure, you can't improve.
- CleverLikeAnOx 4y agoYou can improve without measurement by using reasoning and experience. As an example, Groupon drove itself into the ground by only improving itself in ways it could measure. They added many nagging features that a/b tests showed worked. However, the CEO ignored his less measurable feeling that this was cheapening the brand.
- locallost 4y agoAgree with the gist of the article. My most productive work was in a team of three where people had different strengths. The same team got blown up to 10 people and we were doing less - albeit more ambitious work, but a lot of time was wasted with people with same strengths stepping on each other toes. Where we had one person with the need to feel important and do "cool" work, we had three with different views. So methodology was far off from the key thing.
- crazygringo 4y agoBecause the premise of this article is totally and utterly wrong. It says: > Whether a methodology works or not depends on the criteria: team productivity, happiness, retention, conformity, predictability, accountability, communication, lines per day, man-months, code quality, artifacts produced, etc. Every methodology works if you measure the right thing. But in terms of the only measurement that really matters—satisfying requirements on time and within budget—I haven’t seen any methodology deliver consistent results. Asking a methodology to always meet requirements on time and within budget is asking for human perfection. You might as well expect it to deliver world peace and end hunger as we know it as well. So of course if you set a ludicrously unattainable goal, development methodologies all fail. In every project, unforeseen obstacles will always come up, which usually means some combination of scope-cutting or delaying or (occasionally) spending more. But when teams are having major problems in delivering working code at all or at a reasonable pace, that's where different methodologies can absolutely improve the situation, depending on what's going wrong and what the desired product is. So obviously they do work in terms of adding value, when applied appropriately. Let's not throw the baby out with the bathwater here.
- codingdave 4y agoAlso, even the concepts of "on time" and "within budget" have more or less meaning depending on your methodology and where your company is in its lifecycle. I tend to think of a working methodology as one that produces software that meets the customer's need in a way they are willing to pay for that is sufficient to fund the organization that builds and operates the product. But even that definition can be poked apart because it only accounts for self-sustaining companies, and many software startups do not have an intent to be that.
- commandlinefan 4y ago> Asking a methodology to always meet requirements on time and within budget I'm not quite sure what you're getting at here, because that's absolutely, positively 100% what the people who are recommending methodologies insist they're for and absolutely, positively 100% what the people who adopt them want them for. The ENTIRETY of software developer management is focused - beginning and ending - on meeting requirements on time and within budget. That's the ONLY thing they care about and their ONLY purpose for existing.
- indymike 4y agoIf the team doesn't agree on what is being built, what tools should be used to build it and how the software/hardware will be used, all the methodology in the world can't fix it. Methodology turns into a weird quasi-religious ceremony where everyone works together to find solutions that everyone knows aren't going to do anything but solve political problems. When everyone agrees on what is being built, tools and how the product will be used, methodology is nothing but a framework to simplify the non-coding part of building software. All of the methodologies will work b. So if your methodology isn't working... it's a deeper problem.
- treebeard901 4y agoIn my experience, the MBA vs Engineer mindset plays a part in this. The manager class says we need X number of people and as long as we use the right methodolgy then good things will happen. Meanwhile the engineer mindset says to give us good engineers, not numbers and good things will happen under any methodolgy.
- jbn 4y agoI think you got this right, but the other thing is also that either of those approaches can work in the small, but they just don't scale. For the engineering side, at some point you need "architects" or people whose sole job is to maintain consistency of the whole system, and one way to break down work into smaller components is to define interfaces between components. This is crucial, throwing more people at a larger problem just doesn't work (in my experience) if you don't have this (and it can be entirely informal... engineering orgs tend to route around beancounters!). So the quality of people, not number or methodology is the main driver of success.
- sharkjacobs 4y ago> Why don't simple models accurately describe complex systems and processes?
- commandlinefan 4y agoMy consistent observation over 30 years experience has been that there are alawys three methodologies in effect: 1. The paper methodology that everybody completely ignores - this is Scrum or waterfall or rational or whatever they call it 2. The management ideology that management actually insists on and bases your pay on - the ticketing system (nowadays it's JIRA, but there's always been something similar). In theory it's driven by the paper methodology but in practice it's somewhat random. 3. The support methodology that everybody follows - drop everything and work on this emergency because Somebody Important mentioned it. This is what your reputation is built around, and is always independent of the other two methodologies.
- RaiausderDose 4y agoPoint 3 is very true. In my company at the time, they had a million rules and processes, but everybody had to drop everything because the son of an influential client could not get toy cars (!) into the new enterprise retail procurement system because of some incorrect logistical data. Normally you would get a ticket, analyze etc. But he was the loudest/most influential, so everything else was unimportant. No Jira, nothing, just one angry email. Fix it for him alone, NOW! Billion-dollar company, thousands of clients but a dude with 20 toy cars won. The issue was resolved (we removed the validation rules that were implemented before because "this is the filter for incorrect data, and we want to clear our data by restricting them") and everything went back to normal. Jiras, process and so on.
- commandlinefan 4y ago> everything else was unimportant, no Jira, nothing Well, until review time - then, "why didn't you make any progress on your Jira tickets?"
- klodolph 4y agoOne of the reasons why I would just open a Jira ticket anyway, process be damned. If I’m suspending work on a P1 because of this ticket, I’m gonna mark this ticket at least a P1. If management wants me to complete it within X hours, then I can find the priority level that matches the X-hour turnaround time.
- blippage 4y ago> I now routinely get involved with projects developed by one or two people burdened with so much process and “best practices” that almost nothing of real value is produced. The problem is that nobody really knows what practices are best, anyway. It's mostly just following the herd and gold-plating. A story I typically trot out at this point is some code that was written in Fortran. I passed a meeting room one day, where some consulting dude was talking about "yeah, we could just put that in xml." The thing about Fortran is that it can read arrays as a one-line statement. It's native to the language. You put data in XML, then you need to link in libraries and parse the whole shebang. Programs need to be revised periodically. That means a bunch of guys who know what they're doing (not necessarily programmers) have to sit down and go through the tedious business of figuring out a new spec and how things need to change. I don't there's any shortcut to this. XML won't magic the problem away.
- deleted 4y ago[deleted]
- forinti 4y agoThey're too general. I think we'll start to see progress when methods say something about what is being built: a small site, a worldwide site, an internal bookkeeping app, car software, or whatever. Each kind of project needs to have different directives and its own knowledge base.
- end_of_line 4y agoMy observations are than "agility" in most corporations mean "agile" approach to requirements, hard fixed approach to deadlines and environment or sdlc. Once I got blamed from system admins that I am late and they have extra work because client asked for change few hours before the release deadline. I implemented this but I got blamed for being late. Also in SCRUM the zealous approach to the holy 2 weeks, it cannot last 13 days, nor 15 days. It's super important to last exactly 14 days. In holy ticketing environment where you have to issue a ticket to wipe glasses. In my opinion the best and simplest methodology is an incremental waterfall with releases every 3 months ( more or less ). 3 month long "milestones" because every company does quarter reports. Additionally for status reporting Kanban boards. No damn red tape driven "agile" Scrums, safs and so on.
- poniko 4y agoMy experience, stand ups, kanban and kick ass people who care about the job and less steps between support and dev. For some reason the number of bugs did go up the more testers we had ..
- ftlio 4y agoWhat works: A lead who plans out the project and works with engineers or engineering teams with different specialties to scope out the required components. Lead puts together a plan that is path dependence aware, engineers / teams work iteratively and communicate status. Leads often don’t know how to lead, scrum hides this. Management is supposed to be understanding the organizational needs of completing such projects i.e. making sure the right personnel are on the team, on the right teams, that the right teams exist, and that individuals are capable (technically, as a matter of attitude, incentives, conflicts of interest). Management often doesn’t know how to manage and scrum hides this. Product is supposed to be coming up with the projects. It gets more complicated as there are “technical” products where the PMs are maybe the leads of Engineering teams, and other ones, but overall, someone is supposed to be responsible for defining what to do next as a discrete goal. Product often doesn’t know how to do this and scrum hides this. The thing everyone gets wrong with agile / scrum is that you just keep hacking away until “something” gets done. Without getting into how “agile isn’t scrum” and really just meaning “the death march of ill-specification and low accountability that often gets described as scrum or agile”, you’re supposed to actually start and stop stuff. You can start, fail, and restart. But you need to complete stuff, then look at what was planned versus what was delivered. You need to make specific people responsible for specific things getting done. If people can’t handle their assignments, they need to be given different assignments or removed. This all sounds really simple, but at dysfunctional orgs, it gets way off track. Being somewhere where nobody is responsible for anything is practically a right of passage in this industry.
- d_sem 4y agoYou perspective is interesting. Do you have an opinion about to help management know how to manage? I'm personally in a constant struggle to improve my management skills but struggle to weed through the sudo-science of management training resources.
- fatnoah 4y agoI've been managing for a long time, and where I always seem to land are to ask stakeholders and the engineering team what a successful engineering org looks like to them, and I start from there. The almost universal answer from stakeholders is consistency and some measure of predictability. For Engineers, it's usually consistency and feeling like their making valuable contributions and shipping products. People tend to gravitate towards Scrum because they know it, but it's usually implemented because a process is deemed to be required, not that specific goals are trying to be met. By starting with the goals, I can at least start from a position of agreement, and develop a Scrum or other process that can provide some measure of success for stakeholders while meeting the needs of the engineers. It's also a forcing function for me to say that if you want X from the Engineering team, we need Y from you. I'm also very upfront that a hill I'll die on is that velocities and story points are great planning tools and signals around process health, but they're never goals nor are they tools for judgement and reviews.
- revskill 4y agoThe only methodology that worked for me and the teams i work with, is contract-driven development. When two services talk to each other, you must define a clear contract first. We can name it "specification". But in real world, bad task management will break the law !
- AtlasBarfed 4y agoSoftware development methodologies exist on several fault lines: Software development isn't like most orgs, where the boss can do the job of their underling (even in most engineering disciplines this isn't true). This disrupts the normal MBA expectation of power dynamic and replaceability. The power dynamic disruption is due to a communication barrier. It is probably mathematically impossible to encode all the issues and complexities in whatever IT system smorgasborg some IT person's day to day exists at to a box-and-arrows spreadsheet manager. I almost suspect this is like many theory of computation proofs where complexity is either extremely high even in seemingly trivial circumstances, or exists in mathematical impossibility. Anyway, that means the methodology exists not only at a push-and-pull fault line of power and control, it exists at a communication barrier that is fundamentally impossible to overcome. The power dynamic disruption is such that: who manages the company, the managers, or the automated IT systems that do 90% of the management work, silently and in ways the human managers can't even fathom? Yet every modern company will only survive in the markets, even with cartel/monopoly advantages, with extensive IT systems automation. Even if they maintain position, the profit demands from shareholders will doom a management group if they can't implement IT. But of course MBAs and management schools still don't get this. Accounting is needed by all MBAs, but IT is for "MIS people", it's for grunt work / low level MBAs. Now add this power dynamic to heavy demand for labor, and a hatred of MBAs to pay labor good wages, possibly more than THEY make. They won't pay Developers per the real power dynamic. So: - there's always turnover, since Devs make money by job hopping, the MBAs won't give massive amounts of money to a Dev except in rare places like Silicon Valley - or they outsource, and there's a 12 hour delay and a language barrier on top of the normal communication barrier So aside from the Mangement<->Labor comm barrier, there is either a System Documentation comm shortfall, so labor turnover / outsourcing destroys that, which eventually undermines productivity of a project long term, so the methodology, which is SUPPOSED to protect that long term, but has no provisions to do so, fails. ANother dynamic is that the methodology doesn't really address disagreement. Methodologies can only address devleopment where people agree, but if there are technical, approach, economic/scope, requirements, or other differences in opinions between different groups that paralyze things, and the Management (because of the comm barrier) cannot decide or even realize they need to decide, things drag. The "methodology" fails, but software development methodologies don't have dispute resolution in them.
- yandrypozo 4y agoThis topic always do make me remember this old Dijkstra quote: Software engineering has accepted as its charter "How to program if you cannot"
- no_wizard 4y agoBecause the ones that work actually require management to manage the least. That’s why. It’s not meant for management it’s meant for teams to self manage (core tenant of XP and Agile is self organizing teams). My theory goes that since the general management / MBA mindset didn’t evolve to do higher level things with the time this would free up for management, so they kept turning the screws until management as a job was also a requirement for things to work and then it all starts to deviate from the core tenants until it’s just Agile In Name Only or what have you
- deleted 4y ago[deleted]
- manv1 4y agoThe problem is always people. Even if everyone buys into a process the process is only as good as the people in it. A process doesn't guarantee results - it guarantees consistency. Sometimes that means you get consistently bad results. But the good thing about having an actual process is that it's easier to change it to see if it works if it isn't delivering. The latter is what most process people forget - the process is a living thing, not a stone tablet of commandments. But really, "Conceptual Integrity" is the key. When everyone is working towards a goal and cranking away it's magic, because things seem to happen on their own. They don't, though.
- xiphias2 4y agoCongratulations for discovering agile: ,,Individuals and interactions over processes and tools'' https://agilemanifesto.org https://agilemanifesto.org
- OkayPhysicist 4y agoThe reason processes get treated by stone tablets rather than living documents is that in most companies processes get handed down from on high, to the the people who actually have to live them.
- p0nce 4y agoIt's always about reorganizing workers output, and never about why there are so many bosses to produce for.
- mattpallissard 4y agoBecause people that get way into development methodologies spend more time thinking about development methodologies than actual development.
- flagsrule 4y agoThe only thing that works is: - people who care - people who make a good faith effort every day - people who consider the big picture and don't relegate themselves into a comfortable little box
- rqtwteye 4y agoIn my view software development is largely a social problem. You can apply tools methodologies for certain parts successfully but there will never be an overarching methodology that solves all problems. In the end it's about people and their creativity, skills and diligence and you have to manage that on a case by case base. I feel a lot of software methodologies fall into the same trap as economic models. They look scientific and are very appealing to leaders but they don't connect to reality.
- choeger 4y agoBecause they don't apply universally and managers want them to. Take scrum vs. for example. The focus on small changes, repetitive action, reflective insights, and short feedback cycles is absolutely awesome for software maintenance. Use cases like the python 2 migration, Database upgrades, human language translations, or incremental architectural rework are perfectly suited for scrum. You can develop features as well, as long as they are fairly isolated. If you want to add a device driver to the Linux kernel, scrum would probably work very well. But scrum totally breaks down for features that are not independent of each other. Using scrum can easily lead to two features deployed to production that logically cannot coexist under certain circumstances. And no, testing doesn't prevent that. Another problem are features that are just very large by nature. They tend to break the repetitive cycle, because they simply don't repeat. Finally, bugs are often problematic if they cannot be planned into a future sprint because they are urgent. Scrum simply doesn't assume that anything could happen in the middle of the sprint. It's an alien concept. That doesn't make scrum a bad methodology per se, it's just important to consider the use cases and potential exceptions. And to chose another methodology once the exceptions become the norm.
- pydry 4y ago>Using scrum can easily lead to two features deployed to production that logically cannot coexist under certain circumstances. And no, testing doesn't prevent that. Another problem are features that are just very large by nature. They tend to break the repetitive cycle, because they simply don't repeat. Breaking down features is a skill that not many learn because, unless it's trivial, they believe it to be impossible to begin with. Good god is it valuable though. I'm with you on the rest of scrum. It's an awful methodology.
- choeger 4y agoBreaking down features doesn't help if two features are simply incompatible with each other. I experienced this once, when feature A that was about 3 years old prevented feature B that was a out 1 year old from functioning correctly. The error lead to accumulation of garbage in a DB and was spotted when said DB ran out of disk space. It was incredible difficult to convey the message to management that the bug was at a meta level because both features worked as specified. They really struggled with the concept. It simply didn't fit their view on reality that features aren't completely independent.
- AnimalMuppet 4y agoThere was a discussion on HN just yesterday that said that bureaucrats write rules that make life easier for the bureaucrats, not for everybody else. No matter what the methodology, if the rules for your organization's implementation of it are written by bureaucrats, the result won't be developer productivity.
- eikenberry 4y agoWhich art has a good methodology for a group to collaborate on a work? There are really few examples in most arts of wide spread collaboration and those that do have it (eg. movies) produce very mediocre content.
- chinabot 4y agoI'll give you another methodology I call it "TRACK-RECORD". Give the resources to the guys who gets the project done and dont bug them with what ever management bullshit is the current fad and dont keep changing the specification because you diddnt do your homework before starting the coding.
- js8 4y agoI think the article is very relevant and I agree with the article's observation that the methodologies are perhaps less important than human relationships. However, I think the failure of methodologies can be ascribed to treating SW development as a sort of reproducible, factory process. Two major misconceptions that come out of that: 1. Assuming that the progress on SW development is linear, and the sum of software is exactly the sum of its parts. In reality, SW development process is more like an S-curve, where you plan a lot in the beginning (so coding comes slower), then you speed up because most of the issues are clear and the research is done, and then you slow down back again as you're trying to fine-tune the whole result. This inherent non-linearity is really difficult for the "bean counters" to deal with. 2. Assuming that the people should operate as workers on assembly line, that is, the architects designs, programmer codes, QA tests, support does fixes.. In reality, it's more like a workshop operation - ideally people live with each feature for the whole lifecycle. What always amazes me, though. Big pop art productions like computer games or movies.. they often run on a schedule, and yet are as creative or diverse as SW development. So it seems like there perhaps should be a methodology.
- tinym 4y agoI think the example of video games and movies is instructive - there's always a ton of "cut content". In software, we can always change the requirements to meet a deadline :)
- throwawaaarrgh 4y agoIf you learn Blacksmithing, you will learn a methodology to create fine steel. Something like: Put steel ingot into furnace. Wait until hot. Remove to anvil and hit 50 times. Put back in furnace until hot. Remove to anvil and hit 50 more times. Repeat until steel forms a blade. Then quench. This methodology is fine for producing a basic blade blank. But clearly it's not enough to simply give someone a method to make a blade. They have to actually do the job well, which they can only learn by doing. The method describes the process, but the method is not what produces the blade. If the blade turns out crap, the blacksmith is at fault, not the method.
- rkagerer 4y agoTry all the methodology you want, my experience is the most effective tool is competent, motivated people.
- scelerat 4y agoEvery project management tool and methodology was conceived and matured by specific individuals and teams in their specific contexts, relationships, and business environment. Many companies and teams share similar structures and characteristics, but every single one has differences (even at the same company). Just because something worked for some company and team (even ones which are similar to yours) does not mean it will work for you. There have been so many times where a group I've been involved with has rushed headlong into a specific methodology or tool without having a decent grasp on the team dynamics and goals, and then spent precious hours configuring Jira or arguing about how many hours equals a scrum point. Lord help all of you who get that one person who fancies themselves an expert on a specific methodology or tool. What you need are people who are experts at understanding the business and the dynamics of team they're throwing at it.
- quantum_state 4y agoWithout proper understanding of the problem software is trying to solve, no methodology will help, period
- deleted 4y ago[deleted]
- Rury 4y agoIMO, methodologies are mostly just theatre to cater to stakeholders and their preferences and fears, and are otherwise BS from a development perspective. And in my experience, regardless of what methodology you use, what happens in practice (in the grand scheme of things) largely ends up being the same anyhow. Rather, the speed and success of a project seems to have nothing to do with the methodology, and everything to do with the particular project, people, constraints, and requirements.
- deterministic 4y agoThere is a software development methodology that actually works: Manage everything with a prioritised list of things to get done. Always work on what is #1 priority. Don’t interrupt work that has already started. I have used it for small personal projects and when managing large teams of developers. It’s simple. It works.
- Rochus 4y agoI just read your comments about you JIT compiler using reference counting with global optimization (see https://news.ycombinator.com/item?id=32283392 https://news.ycombinator.com/item?id=32283392, unfortunately reply is disabled, so I comment here). Could you please provide more details, or some relevant paper or book references on how this works? I'm currently looking for a lean, sufficiently efficient solution for my Oberon+ runtime (see https://github.com/rochus-keller/Oberon https://github.com/rochus-keller/Oberon ); I evaluated different solutions, one e.g. based on MPS, but I would prefer something which is lean and as simple as possible; so hints are welcome.