I wonder how well stocked the U.S. is with replacement inventory for facilities like this.
by rch 4y ago
I wonder how well stocked the U.S. is with replacement inventory for facilities like this.
- jeffbee 4y agoOn NPR Marketplace recently there was a utility-size transformer maker interviewed who said their current lead time was well over a year. https://www.marketplace.org/2022/11/14/a-shortage-of-electrical-transformers-holds-back-utilities-businesses/ https://www.marketplace.org/2022/11/14/a-shortage-of-electri...
- rtkwe 4y agoThat's for new orders not an indication of replacement depth held by the utility companies though. Also in an emergency orders could be redirected to companies that need them unless it's a country-wide damaging event.
- anigbrowl 4y agoRight, but power companies likely hold enough for a year's worth of natural disasters + a 10-20% cushion. Sabotage can be a lot more destructive than random failure.
- SpelingBeeChamp 4y ago> power companies likely hold enough for a year's worth of natural disasters + a 10-20% cushion Do you have a source for this?
- rtkwe 4y agoI think you're basically agreeing with what I'm saying. Small scale localized disasters aren't going to take a year to repair because companies keep some repair stock on hand or have replacements in the pipeline for existing equipment. It's only when we get to disasters that threaten to completely deplete repair/reserve stocks that the 1 year wait time for new grid scale transformers becomes truly concerning.
- ckdarby 4y agoIt isn't the replacing part that is the problem, but the rebooting part that is the larger worry.
- nathanaldensr 4y agoNo, it's both. You need to do research that will show you just how long the lead times are for transformer equipment and supplies. Oh, and those lead times are still getting longer.
- ckdarby 4y agoYes, it is both. I do ask for you to reflect back on covid. Remember when trying to make a vaccine was 5-10 years, but when an entire country/world makes something a priority and become hyper focused and motivated they'll 10x output. The problem is when regardless of input you can't speed up the output. Think of a pregnancy, adding more pregnant women doesn't speed up the process, and consuming more inputs doesn't speed up the progress. The electrical grid is nearly a "living entity". It isn't exactly like even if all the replacements magically appeared the problem is solved by a long shot.
- maxerickson 4y agoYou appear to be talking about widespread damage. I believe others are talking about bringing up a couple of local substations.
- landemva 4y agoThe covid "vaccine" was fast-tracked by ignoring standard safety testing and by granting product safety immunity to manufacturers.
- ikiris 4y agoThey get really long with the power out.
- cesarb 4y agoIf it's just a couple of local substations, "rebooting" is AFAIK not very hard. First the substation is connected to other substations by closing the breakers on each high-voltage circuit between them, one by one; this energizes the transformers in the substation. Then the breakers to the outgoing feeders are closed one by one, which sends power to the loads. There might also be some maneuvering far from the substation to move loads from one substation to another. What's hard is when the outage is also on the generation side; "rebooting" from a full outage (black start) can be a complex dance between starting generators, connecting substations, and energizing loads, since generation has to be matched to consumption at all times, and nearly all generators need power themselves to run (on a full black start, small diesel generators, started by even smaller batteries, are the initial point).
- dtgriscom 4y agoMy understanding is that large transformers aren't standard; they need to be custom-made for their application. (Not sure why, and there'd be big benefits to changing this, but that's what I've heard...)