2 ms·
"Unit 5 was undergoing pressure testing on the day the earthquake occurred. The unit lost all AC power due to flooding of seawater pumps and power panels. As a
by pengaru 4y ago
"Unit 5 was undergoing pressure testing on the day the earthquake occurred. The unit lost all AC power due to flooding of seawater pumps and power panels. As a consequence, lighting and AC-powered instrumentation on the Unit 5 side of the common control room were inoperable; the Unit 5 side of the control room went dark after the batteries for emergency lighting were depleted" (emphasis mine)
From: https://www.ncbi.nlm.nih.gov/books/NBK253938/ https://www.ncbi.nlm.nih.gov/books/NBK253938/
Which is quite a read in general, and clearly the diesel generators flooding was a major component of the disaster. But there was a lot that went wrong in addition to that, it's a real mess.
- dekhn 4y agoThat's the control room, though. Reactor 5 was offline, but fueled and never exploded. Unit 4 was the big problem.