3 ms·
Because the 5 is not where the population is in the central valley.
by asdff 5y ago
Because the 5 is not where the population is in the central valley.
- adastra22 5y agoI'm sorry, but why are we optimizing around the Central Valley population centers? When I voted for this high-speed rail (which I now regret), it was a bullet train between San Francisco and Los Angeles. Now it connects to neither.
- CogitoCogito 5y agoI haven't followed this for a while, but this map still seems to connect SF to LA: https://hsr.ca.gov/high-speed-rail-in-california/project-sections-station-communities-interactive-map/ https://hsr.ca.gov/high-speed-rail-in-california/project-sec...
- adastra22 5y agoIt was originally supposed to have a raised track to isolate the high-speed rail from jumpers and to avoid street crossings. That project was dropped. The segments in SF and LA will use commuter tracks (e.g. existing CalTrain) and run at a maximum of half the speed it obtains in the long Central Valley segments. Given the trouble that Caltrain has with clearing and keeping people and foreign objects off the tracks, I sincerely doubt that even that speed (110mi/h) could be achieved safely. This is a faster-than-CalTrain-but-that's-not-saying-much rail connection from SF to the Central Valley, a bullet train down to Bakersfield, and then a similarly slow trek into LA.
- asdff 5y agoMetro link doesn't seem to have these issues and a lot of projects are in store to upgrade that right of way (like LINK union station to permit run through at union station instead of it being a stub). A lot of thought is being put into this. Using an existing right of way that can later be upgraded is sensible imo, especially when these terminii will have the highest land acquisition costs by far. The metrolink right of way from burbank into union station already has many key grade separations done. Its sensible to make use of it when its almost a direct shot as the crow flies.
- asdff 5y agoIt will connect to both. Big projects like this are typically built in stages and the central valley stage is being built first. The upgrades planned on the each end to support the rail aren't even done yet (e.g. LINK union station). There are a lot of people who live in the central valley already, and there is room for these regions to infill still.
- twobitshifter 5y agoFor pieces in LA and SF it will use commuter tracks and not be a new alignment.
- asdff 5y agoIt seems something like that could always be multitracked or a new alignment built in the future. Putting a right of way through an established urban area is not as cheap as using existing commuter lines. For instance in LA if you look at where the metrolink goes it would be foolish not to use that right of way if the goal is to go to union station.
- dekhn 5y agoover the past few decades the central valley has grown into a political power that can't be ignored (billions of dollars of agriculture). the path was a compromise, but also a huge mistake.
- asdff 5y agoAlso 6.5 million people live in the central valley so its not exactly empty. For reference, the bay area has 7.7 million people
- dekhn 5y agoWhat is the relative density of those areas? High speed trains only make sense moving between dense areas. The central valley is many multiples of size of the bay area and the population served by the train will be small.
- asdff 5y agoWhere it actually stops is not in the fields but in the city centers of places like fresno, a city larger than sacramento.