The reasoning behind SLS sort of made sense 10 years ago. We didn't know that Starship, New Glenn and Falcon Heavy were coming down the pipe. We decided that
by bryanlarsen 6y ago
The reasoning behind SLS sort of made sense 10 years ago. We didn't know that Starship, New Glenn and Falcon Heavy were coming down the pipe. We decided that the US & NASA needed super-heavy lift capability. Previous attempts to design a heavy lift vehicle were lost to political regime change and congress in-fighting. Previous attempts to design a single-stage-to-orbit vehicle were cancelled due to its virtual impossibility.
So NASA & Congress designed a program that was unkillable. It greased too many wheels and lined too many pockets to make it easy to kill. It was also designed ultra-conservatively using mostly existing designs so there was no technical risk.
So now when we complain that it's a pork-filled boondoggle that's impossible to kill, that was the plan, and there was a certain logic behind it. It makes no sense in a world with Falcon Heavy, Starship & New Glenn, but who would have predicted that with confidence in 2010?
- Gravityloss 6y agoSLS never made sense. Too big, too expensive, too low flight rate. These all problems contribute to each other. Also, large solid rockets are very troublesome. They can not be fueled on the pad, so they are heavy and dangerous from casting to stacking to launch. There will never be a high launch rate reusable rocket with solids.
- bryanlarsen 6y agoBig was the whole point, people decided we needed the capability to send large masses beyond Earth orbit in a single launch. Anything smaller would mean "giving up" on human spaceflight to the moon or Mars. Doing it in a single launch is silly, but that thinking was widespread at the time. And a low flight rate was also a given. Delta IV Heavy only files about once every 18 months, there's insignificant demand for anything even bigger. That was why NASA decided they had to do this themselves, because it would be insane for any commercial company to build a rocket without a market. And expensive was also part of the plan, you can't spread enough pork to make it unkillable if it isn't expensive. Big, expensive, low flight rate. Those weren't problems, they were requirements.
- Gravityloss 6y agoI think you misunderstood what I said. I understand that NASA thought it needed the vehicle. However I'm saying it did not in fact need it for any missions. (The idea for docking in earth orbit at the start of a mission is not new.) Very different thing, and you actually demonstrate those points. Everything starts with the misplaced thought that it needs to be so big. Not actually required. Probably correct thought that it needs to be NASA-made since it wouldn't make sense commercially, but this is a consequence of misplaced thought 1. Expensive to spend pork. Again, not needed for the mission, if something more sensible was chosen in the first place. There could have been a capsule flying on Atlas V for many years already. The ESAS study just had all kind of really bad assumptions that made Ares happen instead.
- bryanlarsen 6y agoYes, bad assumptions led to a bad result. Some of those bad assumptions made sense 10 years ago. Some of them didn't. I was far too generous to Congress by only talking about the former and not mentioning the latter. Multi-launch for large beyond-Earth missions made much more sense 10 years ago than a big rocket. Heck, multi-launch probably made more sense in the 60's than Apollo, if it wouldn't have been for that 1969 hard deadline.
- wongarsu 6y agoMulti-launch was considered for the Apollo program, but was ruled out because it had higher technical risk than just scaling up the rocket and making the payload extra light. If we didn't have the hard 1969 deadline we would likely have gone with the multi-launch option back then. It's an interesting alternate reality to imagine: we might have had a more interesting moon program that had the ability to naturally scale to larger and larger missions, instead of repeating basically the same thing until the public gets bored and cancels it.
- Gravityloss 6y agoYeah, first orbital docking was done 1966 on Gemini 8. The architecture for Apollo was decided much earlier already (it did include the lunar orbit rendezvous and docking which was indeed risky). We now have 54 years of repeated low earth orbit dockings so maybe the architecture designs could start taking that into account. Even SpaceX is planning on doing orbital refueling.
- pfdietz 6y agoRight. I will go further: if SLS is the best that could be done, then human space activities themselves would make no sense. SLS is a solution to no real problem beyond "how do we deliver $$$ to the appropriate pork consumers?" If you believe humanity has a future in space, then you must believe it's possible to do much better than SLS. So do that, not waste time on a pointless and hideously expensive diversion.
- mlindner 6y agoI think you're misrepresenting the past. > It was also designed ultra-conservatively using mostly existing designs so there was no technical risk. Politicians can't design a rocket and cannot get what is "ultra-conservative". Rockets are not Lego blocks that you can just mix and match. They're explicitly designed a certain way to support a certain load profile. Even if the parts of the SLS _look_ like they have low risk, they do not and that's why the vehicle has taken so long to develop. One example, if the shuttle boosters were could actually have been used directly they wouldn't have needed to extend the number of segments from 4 to 5, redesign the liner between the segments, and completely redesign the nozzle. It's a new booster. Second example, even though the shuttle external tank looks like it's being used, in previous iterations the shuttle external tank did not support any axial loads, it was simply held on to the bottom of the Orbiter. Now the external tank has to withstand the entire axial load of the rocket so it's basically redesigned from scratch.
- bryanlarsen 6y agoYes, it's still rocket engineering. It's never trivial. What would have been a more conservative design? Reusing the Apollo design was considered and discarded because so much knowledge and tooling had been lost that it was considered to be less conservative than the SLS design.
- Robotbeat 6y agoProbably EELV Phase II.
- giantrobot 6y agoI love the whole "lost Saturn V engineering" trope. It sounds so good despite being bullshit. Rocket dune and NASA did an extensive knowledge retention project for the F-1 and J-2 engines. NASA also maintains several copies of extant F-1 and F-1A engines. If we approached Rocketdyne tomorrow with a billion dollars they could restart F-1A production. The J-2X is in fact the second stage engine for the SLS stack. The SSME was selected for the SLS (and Ares V before it) because it had twice the burn hours of the F-1 and the SRBs existed and were a known quantity. The SLS (and Ares V) can reuse more of the Shuttle's infrastructure than an F-1 based design. The SRBs allow for use of smaller first stage tankage and the less powerful SSMEs which allow for reusing Shuttle launchpads which replaced the Saturn launchpads at LC-39. While the SLS is moving into boondoggle territory the Ares V and SLS designs made economic sense to reuse Shuttle designs and infrastructure. It didn't have anything to do with the myth of lost engineering knowledge.
- bnralt 6y agoPerhaps the problem was deciding that the U.S. needed to have a super-heavy lift capability in the first place. A lot of the U.S. space program seems to be rather aimless, doing things because they seem cool rather than practical. We shouldn't really be surprised when situations like this occur.
- Nbox9 6y agoI strongly disagree with this opinion. The US space program is incredibly practical, particularly in the last 3 decades. * An unbelievable amount of scientific data about biology and microgravity comes from the ISS. To say this is “aimless” only is true if you believe humans will always live on Earth and only Earth. * A wealth of fundamental knowledge about the universe comes from spaced based telescopes. These are helping us understand the laws of nature, some of the most raw R&D. * There are significant military applications to our space program. These range from GPS, surveillance, communications, and potentially weapons. There are some government space launches that we know very little about their mission because it is highly classified. The Space Shuttle had a use case for rapid troop deployment. There is significant military applications to the engineering knowledge of rockets. The difference between a rocket and a missile is mostly the application. * Our exploration of our solar system provides possible future avenue for economic development. There is more fresh water, raw minerals, and energy inside our solar system but outside of Earth than there is water, mineral wealth, and energy on Earth. Certain things we consume are non-renewable, and we will need to find sources for them outside of Earth. * It gives hope, inspires young people to become engineers and scientists, and gives us a feeling of awe as we go through the process of understanding our existence in the context of the cosmos. EDIT: This isn’t to say there is major bloat inside the space program, and that NASA is not in need of a significant culture change.
- bnralt 6y ago> There are significant military applications to our space program. It's interesting looking at the military and space, since the military seems to be more objective focused than NASA. Early on (1960's), the military was planning on a manned station (MOL), but ended up going with automated satellites in the end because they made more sense. Likewise the Space Force believes it might eventually send up astronauts, but doesn't think that will happen for decades. They're interested in sending people up when it's useful to do so, not just sending them up for the sake of sending them up.
- OnlyOneCannolo 6y agoIt made sense as an institutional flywheel. The Constellation Program [1] that preceded SLS had two vehicles - Ares I for ISS crew and supplies after Shuttle was retired, and Ares V for occupying the moon. The missions gave some justification for needing vehicles. Their design was primarily a means to preserve existing contracts and jobs. Additional wheel greasing made it happen. That stuff about re-using parts to reduce risk is just what people say because it sounds good, but isn't inherently true. Kind of like how "drug delivery" and "machine learning application" are go-to pseudo-justifications for many research proposals. Constellation was eventually canceled when ISS resupply went to the Commercial Crew Program [2]. Ares V was stripped down and reimagined as the mission-less SLS. SLS is not really intended to do much more than exist for the time being. There are a lot of factors that will go into canceling SLS - infighting between NASA centers, preserving jobs and contracts with Old Space companies, even more wheel greasing. I'm interested to see how it plays out. [1] https://en.wikipedia.org/wiki/Constellation_program https://en.wikipedia.org/wiki/Constellation_program [2] https://en.wikipedia.org/wiki/Commercial_Crew_Program https://en.wikipedia.org/wiki/Commercial_Crew_Program
- tobmlt 6y agoI was going to mention the issue with reuse of old designs “being conservative” but you got there first. Mandated reuse of some component of a prior vehicle is, by definition, an extra constraint on the new design. Extra constraints make design harder, not necessarily safer, and the use of old stuff in the new vehicle to some extent kills the “flight proven-ness” of the old thing. (Generally speaking. Maybe some of this is less of a factor or more depending on the system... point is you can’t say up front that old hardware is a good idea)
- OnlyOneCannolo 6y agoThank you for elaborating on that point. From some of the other comments, it seems that it's maybe a contentious issue. There's a lot of pressure to include hand-wavy references to "heritage hardware" in the risk assessments for various reasons, but it's not well-substantiated where it exists.
- nickik 6y ago> using mostly existing designs so there was no technical risk. If only that was so. Using a bunch of old tech in a new way does not actually lead to great success. The re-qualification of the RS-25 alone took years and cost 100s of millions. And that is without producing new ones.