5 ms·
345MW for "$1B", which is presumably the delivered cost. Add another $1B for running, insurance, and decommissioning (or show me real numbers). Walney is a new
by spenrose 6y ago
345MW for "$1B", which is presumably the delivered cost. Add another $1B for running, insurance, and decommissioning (or show me real numbers).
Walney is a new nameplate 588MW offshore wind farm; it will average close to the same delivered energy and cost $3B.[1]
If Terrapower can actually deliver at roughly those costs, they might make a real contribution to our energy future.
[1] https://www.bbc.com/news/uk-scotland-49125399 https://www.bbc.com/news/uk-scotland-49125399
- Rebelgecko 6y agoWhat is 588MW a measure of? Peak output? Average?
- unchocked 6y agoIntermittent sources are usually quoted as peak. That is multiplied by a typical capacity factor to determine average load. For offshore wind, 60% is a reasonable number I think.
- byronr 6y agoThe key word is "nameplate", a colorful term implying engraving and rivets: https://en.wikipedia.org/wiki/Nameplate_capacity https://en.wikipedia.org/wiki/Nameplate_capacity
- saagarjha 6y agoNuclear power is usually run close to nameplate, continuously, as it this is generally more economical.
- yyy888sss 6y agoSeems to be more like 40% [1] and it's worth noting that in a lot of geographies you still need full backup for wind farms as the wind speed can drop low across the whole country/continent. [1] - https://energynumbers.info/uk-offshore-wind-capacity-factors https://energynumbers.info/uk-offshore-wind-capacity-factors
- skitout 6y ago40% is kind of an average of already installed offshore wind project, some having been installed 10 years ago... In wind project in general we've seen a continuous trend of spectacular increase in capacity factor [1], and 40% capacity factor can be expected from a US onshore wind project now... 60% average seems high right now (not in the future) and depend on geographies though Of course managing intermittence is not easy and free, but nobody is talking about a 100% wind-power grid, and the current installations can absorb a fair amount of intermittence with extra investment... And wind and solar are becoming so cheap that you have a lot of space to pay for managing intermittence - that can be using differently the current installations, developing a demand-response market, and doing some thermal and electrical storage... [1] see for example https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_07_b https://www.eia.gov/electricity/monthly/epm_table_grapher.ph... keeping in mind the average capacity factor include older equipment with low capacity factor... and that offshore wind is "just starting"
- Rebelgecko 6y agoThat's a bummer. Even though the capacity is still in the same neighborhood as the reactor, the cost is greater because you either need a ton of storage capacity or some nonrenewable backups. I think that's the problem we ran into here in California. As we've decommissioned nuclear and natty plants we've replaced much of that capacity with wind and solar. Then you end up in the situation we had a week ago: power consumption peaks around 6pm when solar is ebbing. If that happens in conjunction with a period of low winds, there's a very thin margin of error and in some cases you have blackouts.
- olau 6y agoApparently no: https://cleantechnica.com/2020/08/27/no-renewables-did-not-cause-californias-blackouts/ https://cleantechnica.com/2020/08/27/no-renewables-did-not-c... Real grids are much more complicated than you'd think. Regarding costs of various plants, usually you calculate it as an average per kWh, which is still not quite right as dispatchable is worth more than non-dispatchable. (And yes, you can have renewable dispatchable.) If you compare those figures across technologies and locations, tread carefully, it is really easy to come to the wrong conclusions. For instance, you might be comparing theoretically estimated numbers with (somewhat old) real-world averages.
- Rebelgecko 6y agoI don't really know what to make of that article from cleantechnica. It says that renewables weren't the issue. But the head of the CA grid also said that "If the wind hadn’t run out, we would have been OK"[1]. Maybe this is wrong, but the way I interpret that is "When a fossil fuel plant conked out, it was the straw that broke the camel's back. But the reason that a single power plant failure led to blackouts is a heavy dependence on renewables without adequate storage or backups". [1]: https://www.sacbee.com/news/local/environment/article245115560.html https://www.sacbee.com/news/local/environment/article2451155...
- deleted 6y ago[deleted]
- gehsty 6y agoThis is the maximum output - literally the turbine capacity multiplied by turbine quantity.
- deleted 6y ago[deleted]
- imtringued 6y agoI'm not sure if this is a valid comparison. It feels to me that the wind farm wins when both cost the same simply because it does not require manned operation and it consumes no fuel. You're unlikely to run out of skilled personnel by deploying too many wind turbines.
- donkeyd 6y agoWind turbines definitely need maintenance and a large enough wind farm will probably need that constantly to keep everything running. Wind turbine maintenance is also pretty specific, because it's at height and requires specific knowledge and skills. Off shore wind farms add an extra challenge because of the location.
- jschwartzi 6y agoEven emergency escape from a burning turbine requires someone who is comfortable rappelling several hundred feet through thin air.
- epistasis 6y agoIf Terrapower can hit those costs, it would be completely revolutionary for nuclear. It's a huuuuuge change from current costs. Meanwhile off shore wind (which is typically steadier than onshore), continues to fall In cost at a fairly quick pace. There's a recent Dogger Bank contract for 3.6GW at $9B [1], which is about $2500/kW compared to $5200kW for the Walney project you link, and $2900 for Terrapower's plans. Of course, a wind kW of capacity is not equivalent to a kW of nuclear, but with another 10 years of development I wonder just how cheap offshore wind will be if in 5-10 years it has already fallen by 50% in cost. [1] https://www.renewablesnow.com/news/sse-equinor-eye-fid-for-36-gw-dogger-bank-wind-farm-in-a-year-669768/ https://www.renewablesnow.com/news/sse-equinor-eye-fid-for-3...