I am wondering why NASA only sends one rover. Considering the investments into development, planning, and control and the relatively low launch costs nowadays,
by choeger 6y ago
I am wondering why NASA only sends one rover. Considering the investments into development, planning, and control and the relatively low launch costs nowadays, I would think it logical to send two or more probes to mitigate the risk of catastrophic mistakes.
- rimliu 6y agoMy understanding is that there is a dedicated team for each probe on the ground, so two rovers = two teams, twice the cost to support. Or am I wrong?
- adventured 6y agoThe launch cost isn't low. They're using an Atlas V-541 from UAL. The program cost is equivalent to about 10% of NASA's annual budget, which is a lot. Mars and the rovers are just one corner of NASA's focus. It would cost a minimum of another $2 billion to duplicate this rover and mission, if you can find enough qualified people to task to it so as to not harm (by dilution) your ability to deliver on at least one of them. NASA's resources and talent pool are both very much limited.
- Wandfarbe 6y agoI'm pretty sure what makes that stuff so expensive is all the Quality Control for every single part. Its probably quite a linear cost vector they have.
- C1sc0cat 6y agoThe failure to a "repaired PCB" stands out just scrap the damaged one would make more sense.
- rckoepke 6y agoBeing that this was 1971, it was probably more straightforward to repair the botched installation/repair rather than do the whole PCB over from scratch. Features on PCB's were much simpler then, not to mention much larger. Their procedure was to test each component before installation only, in order to prevent any potential damage occurring during post-installation testing. So they evidently couldn't know to scrap it and replace the damaged one. After the Mariner 8 failure, they changed this testing policy to test PCB's/components again after components are installed on the PCB. "A diode intended to protect the system from transient voltages was thought to have been damaged during repairs/installation of the pitch amplifier's printed circuit board, something that would not have been detected through bench tests." - Wikipedia, but I'm having difficulty finding any original sources that validate or expand upon this. P.S. I think you may have responded to the wrong parent comment Edit: "N72-13963" was a report given to Congress in October 1971 on the failure of the Mariner 8 mission, I can't find that report but it may have more details if you're curious enough to track it down. Edit: I found a transcript of the report given to Congress, evidently in June of 1971: https://books.google.com/books?id=7FQVAAAAIAAJ https://books.google.com/books?id=7FQVAAAAIAAJ Dr. Low: The diode was external to this integrated circuit, mounted next to it. I don't have one with me, but the diode is another component about the same size. The integrated circuit which failed is known to be sensitive to electrical transients if it is not properly protected. And electrical transients large enough to damage an unprotected integrated circuit — caused, for example, by engine start, stage separation, et. cetera — are well within the specifications of the Atlas/Centaur vehicle and are clearly possible. Because of this, the integrated circuit was protected with Zener diodes which in effect were designed to act as "safety valves" to prevent potentially damaging electrical transients from reaching the integrated circuit itself. In accordance with standard practice in the Atlas/ Centaur vehicle — as well as in many others — these Zener diodes were checked individually prior to their installations, but were not tested thereafter. This practice of not testing protective devices after they are installed in a system is based upon the conclusion or design philosophy, which we are now reevaluating, that a test of a protective device after installation is not warranted where such a test could possibly damage the component that is being protected. Based upon the detailed consideration of the flight failure records and some very extensive "detective work" of personnel from the Lewis Research Center, which is responsible for the Centaur stage, and General Dynamics, the prime contractor, we developed the following hypothesis which we believe pinpoints the cause of the Mariner 8 failure : (1) One of the Zener diodes which was intended to protect the inte-grated circuit in the Centaur pitch rate gyro preamplifier was either installed improperly, was faulty itself, or failed at some time during assembly, vehicle checkout or powered flight. (2) An electrical transient sufficient to cause damage to the inte-grated circuit occurred some time after T-minus-40 minutes—when the autopilot performed properly--but before Centaur main engine start. (3) This damaged the integrated circuit affecting the gain of the autopilot pitch channel and causing the subsequent fixed engine position. Tests show that all subsequent mission events would be fully explained by this hypothesis. ... To prevent a recurrence of the problem which occured on Mariner 8, we required additional thermal and vibration tests on the Centaur state autopilot and new and special test procedures to ensure that the diodes protection the integrated circuits were properly installed and operative."
- KineticLensman 6y ago> Being that this was 1971, it was probably more straightforward to repair the botched installation/repair rather than do the whole PCB over from scratch As an extra data point I did a contracting gig in early '90s that involved building a diagnostic system for a specialised analogue circuit board that was used in the oil industry. The boards were held in place and an automated probe system took measurements at numerous places. A constraint satisfaction algorithm then modelled failing components in an attempt to match the faulty readings, and thus locate the failed component(s). The algorithm came from a three-year Ph.D project funded by the company concerned, and I was part of a team of five that were implementing it over a six-month period. This was considered a small price by the company, compared with the cost of throwing away a specialised board manufactured in small production runs to high tolerances. The probing system already existed, and was used by electronics experts who were attempting to perform the same diagnostic process using their own (expensive) skill and judgement.
- rckoepke 6y agoJust out of terrible curiosity, was that PCB used in downhole tools?
- KineticLensman 6y agoThey were used in a monitoring / comms role at the well head if I recall correctly. Younger me just concentrated on coding the diagnostics, and as a contractor was totally insulated from actual users who might have explained.
- sephamorr 6y agoA major point missed by the other answers is that these rovers are exceptionally specialized for their mission, so building a second rover wouldn't be able to accomplish many additional scientific goals, without major modifications. The Curiosity rover and Perseverance share a lot of components, but pretty much the entire science suite is replaced or upgraded. As such, the expensive parts weren't shared, even though the huge value of the bus/bogie system and the skycrane were shared. Even the EDL systems have been changed a lot; the entry system on Perseverance does localization during some phases with a camera (a first for a spacecraft afaic, maybe the shuttle counts though since a human eyeball steered it to a runway). If you don't have additional science objectives that a second rover could accomplish, it will be very hard to justify that budget, even if it is only 20% more (for example). This being said, clever mission design might take advantage of this cost structure where multiple units are cheaper to build, intending to build two cheaper spacecraft instead of one expensive one; eggs in two baskets. In this case, we've seen this happen with spirit and opportunity, which was a wildly successful program.
- jojobas 6y agoSame science suite in different landing areas would yield different results wouldn't it?
- PedroBatista 6y agoAt what cost and how different? would the benefit from different results offset the cost?
- rckoepke 6y agoSometimes NASA does send duplicates, including for Rovers. Spirit and Opportunity were identical. If all missions had a duplicate, we would have spent money to build an additional 15 spacecraft, and that would have only saved zero to two missions. I'd guess it boils down to the relative expected contributions of random errors/failures vs. systematic errors/failures. Many failures were design flaws that would have created identical failures in any duplicate spacecraft of the same design. In that case, spending the money on two separate missions with unique hardware would have a higher return on investment than spending twice the money on one mission where either both spacecraft succeed and collect somewhat redundant data, or both fail and collect nothing. Looks like NASA has attempted 28 missions to Mars, and four of these involved Rovers. All 4 Rovers have been successful. If NASA sent two rovers together each time, they'd simply have spent 1.5x money and completed the same # of missions. Out of all 28 Mars missions NASA attempted, only 6 had some kind of failure: - Mariner 3 and Mariner 4 were identical probes launched 23 days apart. Mariner 3 failed. We never figured out the root cause of Mariner 3 failure. Mariner 4 worked just fine. - Mariner 8 and Mariner 9 were identical orbiters launched 21 days apart. Mariner 8 failed due to a botched installation of a diode onto a PCB which damaged that diode. Mariner 9 was successful. - Mars observer failed. Root cause was never 100% definitively determined but NASA's final report focused on the hypothesis "that 2 grams of nitrogen tetroxide slowly leaked through a valve during the 11 months the Mars Observer was in space. When the fuel system was pressurised, the nitrogen tetroxide mixed with monomethyl hydrazine – an explosive combination....If NASA’s managers had studied the design well enough to understand its limitations, they could have taken steps to prevent the failure by periodically purging the fuel line." It sounds like a duplicate would have had the same problem -- increased costs for no benefit. - Mars Climate Orbiter failed due to a software bug. Any duplicate mission definitely would have had the same bug and failed in exactly the same way -- increased costs for no benefit. - Mars Polar Lander failed due to a software bug. It's not 100% certain that the bug would have been triggered by a duplicate mission, but it's reasonably likely. "The Failure Review Board concluded that the most likely cause of the mishap was a software error that incorrectly identified vibrations, caused by the deployment of the stowed legs, as surface touchdown. The resulting action by the spacecraft was the shutdown of the descent engines, while still likely 40 meters above the surface. Although it was known that leg deployment could create the false indication, the software's design instructions did not account for that eventuality."[1] I'd personally chalk a duplicate up to increased costs for no benefit, but an expert's interpretation may vary. - Deep Space 2 failed, no root cause identified. 2 possibilities identified were design flaws, which could have affected a duplicate as well. 4 possibilities involved bad luck in landing so it's possible a duplicate would have had better luck. So, if all missions had a duplicate, we would have spent money to build an additional 15 spacecraft, and that would have only saved zero to two missions. [0] https://www.newscientist.com/article/mg14119080-300-cheap-design-blamed-for-loss-of-mars-probe/ https://www.newscientist.com/article/mg14119080-300-cheap-de... [1] https://en.wikipedia.org/wiki/Mars_Polar_Lander https://en.wikipedia.org/wiki/Mars_Polar_Lander
- chriskanan 6y agoThis is exactly what they did with Opportunity and Spirit: https://en.m.wikipedia.org/wiki/Mars_Exploration_Rover https://en.m.wikipedia.org/wiki/Mars_Exploration_Rover I think is is largely due to budget reasons, though.
- sandworm101 6y agoThose were solar powered. RTGs are not as plentiful as solar panels. Sending an RTG on rover B means some other space mission doesn't happen because they cannot get an RTG.
- chriskanan 6y agoThat's a good point. I forgot about the RTG shortage.
- WalterBright 6y agoYes. Consider the Hubble space telescope. I would expect that building a pair rather than one wouldn't cost that much more than one, especially if they were built side by side. This would likely have been far, far cheaper than the repair mission sent to fix the sole Hubble.
- iso1631 6y agoOr two repair missions to fix the same defect in both telescopes would have cost even more
- qrbLPHiKpiux 6y agoBudget justification. How government works.
- KineticLensman 6y ago> This would likely have been far, far cheaper than the repair mission sent to fix the sole Hubble If two Hubbles had been built the same, both could have had the same implementation error [0] that required the first repair flight. [Edit] Although I guess the second one could have been fixed on the ground based on experience from the first, assuming a non-simultaneous launch. [0] https://en.wikipedia.org/wiki/Hubble_Space_Telescope#Flawed_mirror https://en.wikipedia.org/wiki/Hubble_Space_Telescope#Flawed_...
- WalterBright 6y agoThat's right. It would make sense to space the launches out a bit to be able to correct defects on the second.
- AlbertoGP 6y agoNot the whole telescope, but they did build two mirrors, the backup one having been finished flawlessly by Kodak earlier than the one they used: https://www.nytimes.com/1990/07/18/us/hubble-has-backup-mirror-unused.html https://www.nytimes.com/1990/07/18/us/hubble-has-backup-mirr... It ended up sitting “in its shipping crate in Danbury, Connecticut”: https://duckduckgo.com/?t=ffab&q=Danbury%2C+Connecticut&ia=maps&iaxm=maps https://duckduckgo.com/?t=ffab&q=Danbury%2C+Connecticut&ia=m...
- uptown 6y ago"First rule in government spending: why build one when you can have two at twice the price? Only, this one can be kept secret. Controlled by Americans, built by the Japanese subcontractors. Who, also, happen to be, recently acquired, wholly-owned subsidiaries..." https://www.imdb.com/title/tt0118884/quotes/qt1542424 https://www.imdb.com/title/tt0118884/quotes/qt1542424
- ArtWomb 6y agoNASA is pretty budget constrained. But they also admit to a risk-adverse culture. Part and parcel of having a safety first mission oriented to human spaceflight. I think your right and they would agree. We'll probably take much more risk very shortly, or fund entrepreneurial partnerships willing to do so. SpaceX has changed the game. The other thing is if you look at the choice of Jezero Crater as the landing zone for the Mars 2020 Perseverance mission. The quality of high resolution astrogeological maps, atmospheric surveys, and even computer simulations is good enough today that we can predict right here on earth where evidence of fossilized life may be found, where rich deposits of silica aerogel may be located for terraforming, where the mineral deposits of niobium and tantalum are likely to be.
- inamberclad 6y agoThe duplicate is almost always called EDU and stays in a cleanroom on the ground for troubleshooting.