5 ms·
> Only if you assume your software is the worst possible variety of spaghetti. Gravity always wins. The thing about exponentials that if the constant is > 1 t
by hinkley 7y ago
> Only if you assume your software is the worst possible variety of spaghetti.
Gravity always wins.
The thing about exponentials that if the constant is > 1 the trend line essentially looks the same, the X axis just changes a bit. So maybe a boolean doesn't double the surface area, maybe it's only 1.5, that still results in compound interest. Even at 1.1, it only takes 7 booleans to double your surface area.
- marcosdumay 7y agoYet, everything interesting happens on the border where things are falling but still not irreversibly so. Yes, if you leave them wild options will overwhelm your code. The entire field of software engineering is focused on solving that exact problem; what people can do, with varying degrees of success.
- kd5bjo 7y agoThe initial cost is quite low and there are techniques to reduce the growth factor, but I’ve seen no evidence of anything that reduces this below an exponential scenario. Over large scales, exponentials can be reasonably modeled by a piecewise function that’s 0 below some threshold and infinity above it (1). That translates roughly into a fixed number of options that can be maintained, modulated by your development practices. Without knowing what that limit actually is, what’s the best strategy for spending this limited resource? As there’s no such thing as an average person (2), I contend that this budget should be reserved for things that materially affect accessibility. (1) This is the standard approximation for a diode’s I-V curve, for instance (2) https://apps.dtic.mil/dtic/tr/fulltext/u2/010203.pdf https://apps.dtic.mil/dtic/tr/fulltext/u2/010203.pdf