Pivotal has 3 regular meetings: daily morning standup (short), iteration planning (monday), retrospective (friday).
Any new stories during the week that haven't been pointed get pointed in the morning meeting.
- 0xFACEFEED 7y agoout of curiosity what value do you see in morning standups? 15 yrs and i still don't see it (i've really tried).
- latchkey 7y agoI agree that the whole typical 'what did you do yesterday' is indeed lacking value. The standups are mostly just pointing the stories that need pointing, covering any questions and picking the pairs for the days work (pivotal is 100% pair programming). The meetings can be done within 5-15 minutes at most. I'm currently living at a yoga retreat center in the mountains of Vietnam. I can see from the practice that the first few minutes of silence is good to clear the mind. I think having standups is a similar good way to start the day with a positive attitude.
- matwood 7y agoI also find value in standups, but the problem is they constrain the team to some daily meeting time. For example, I start work around 6am. A co-worker does morning kid duty and tends to start closer to 10am. There is no good way to start our days at the same time, and there really is no need. What we have been trialing for awhile is a simple Slack checkin. Everyone reads them when their day starts, and if there are any questions or comments a Slack thread is started from the checkin message. It's worked quite well.
- latchkey 7y agoPivotal solved that by requiring everyone to work the same exact hours. It is a bit military in that regard, but it works for them. You don't get a job there unless you buy into it. Their reasoning is more around their culture of pair programming. It sounds like you have found a solution that works for your company and that is great! The way I look at it is that as long as we are shipping software around the time when we say we are going to and the quality is high and people aren't killing themselves (weekends) to make it all happen, all good. =)
- koreth1 7y agoI just asked the same thing because I've had that experience too. I'm curious: are you usually working on things that require close collaboration between team members? My hunch is that standups are pretty useless on teams where each developer is working on an independent change where there isn't much opportunity to get blocked by teammates aside from waiting for code reviews and the like. That's most of the teams I've worked on, and the standups inevitably turn into a verbal form of, "Hey manager, here's my status report for the day even though you already know all this because I've already said it in Slack," because you have nothing to ask of the other people on the team but you're required to say something every day.
- ryanbrunner 7y agoWhere I've seen standups work effectively is when an engineer has a bit of context on a problem that someone is dealing with, or an insight that might unblock someone. I've had many times I've mentioned in an (async, written in slack) standup status update, and someone's chimed in with something like "Oh, I've dealt with that before - let's pair for 10 minutes so I can walk you through some gotchas". Another plus for me personally is that it has a focusing effect on myself as a developer - if I say I'm going to get something done in standup, I'm going to force myself to focus on that task, and not get distracted by something else unless it's really important. I can see how that's a totally personal thing though - I need to have some sort of external "deadline", even if it's self-imposed and soft, to keep me focused. All of the above can be solved with async updates in Slack though, and that's probably actually a better medium. Having folks get in the same room seems a little pointless to me, especially when you have remote folks and timezones are an issue.
- Sean1708 7y agoThe problem I've had with async updates is that they often get ignored because everyone that could help is busy at the time, so you still need the actual standup to just remind them about it. How do you get around this?
- ryanbrunner 7y ago
- ozim 7y agoStandups are for "weakest" devs, to break silo of "I am working on my thing don't bother me". "weakest" devs - you know not everyone is outspoken and will communicate without issues, new young devs will be afraid to ask an experienced guy. Some experienced guys (also "weak") will be assholes to young devs for asking questions. Just getting team to talk to each other at least once a day is positive. Unless you work only with senior people who are experienced and don't have any issues talking to each other, I would still try to get people to gather for standup.
- latchkey 7y agoWeaker? Senior? We have something to learn from every one. Nobody should be an asshole. Nobody should be working alone. Both of these are great ways to create a really toxic working environment, please don't perpetuate it.
- ozim 7y agoHow would you express that thought, to get through to a person I replied to who wrote he has 15 years of experience and he did not see any value in standups? Do you think he is not a senior person? Is he a bad person for pointing out his years of experience? Maybe I am bad person trying to express in BOLD that there are people with less experience, social anxiety, assholes and we have to work with all those personalities. With strong emphasis that standups are good tool for getting rid of toxic work environment and getting teams together.
- shantly 7y agoCounterpoint: comment was fine and non-toxic, describing siloing as weak no matter who's doing it is an accurate and a pretty tame criticism, and ensuring that's not happening is indeed the only real point of scheduled daily stand-ups. As long as we're gonna have the term "senior"—and we do have it—I'd abso-friggin'-lutely reserve it for people who can avoid siloing without a formal, daily ritual, and a team of such folks don't need stand-ups. Don't worry about it, ozim. > Nobody should be an asshole. Nobody should be working alone. Ozim advocated neither being an asshole nor working alone, so is perpetuating neither. Standups have a place and it's to fight both of those problems, when some ICs on a team can't handle it on their own.
- JohnBooty 7y agoFirst off, I'd say that a good daily standup meeting shouldn't be more than 15 minutes. If it's longer than that, you are probably getting bogged down in details that don't belong there. Let's be generous and call the "real" cost 30 minutes of productivity... 15 minutes for the actual meeting/call, and 15 minutes of context switching cost. That is 6% of an 8-hour workday. You can still code up to 94% of the time, not bad. And I think it has been shown many times that most developers don't really pound out code for 8 hours per day. We might work 10+ hours per day but it's not necessarily 10+ hours of coding. So I feel the cost of these daily meetings is very small. What are the benefits? 1. For one thing, it is good to know what the rest of your team is working on and what challenges they are facing. This jogs a lot of useful conversations in my experience, where Developer A turns out to have some experience in the area in which Developer B is stuck. You may be thinking, "good teams communicate and can do this literally any time... why schedule a daily meeting for it?" Yes. If your team is operating and communicating flawlessly, sure, standups are redundant. However, I've been at this for 22 years and this is not typically the case, and the brief daily meetings are a real upgrade. 2. These meetings help prevent "drive-by shootings." That's what I call it when management randomly stops by your desk and wants to know what you're doing and if you're stuck and wants to see your work in progress. I hate hate hate hate these. I would rather just briefly chat with leadership on a predictable basis. And when I am leadership, I would prefer not to subject my team to these "drive-by shootings." A lot of teams are already paying this cost, which I feel is much greater than the cost of a brief morning standup. Again, if your team is already communicating at a super high level, maybe you don't need standups. I feel this is not the case for a majority of teams. 3. For remote teams, these give folks a chance for some regularly scheduled face time and chitchat. We kept our morning call to < 15 minutes today and talked about Star Wars. As a remote worker myself I truly cherish this. If you have a remote team I would call video chat standups more or less a requirement.
- koreth1 7y agoOut of curiosity, how valuable are these three meetings in a typical week? What do you get out of each of them as a developer? I've worked at a few places that follow more or less the same practice and I've found that the planning meeting is hugely valuable but that standups and retrospectives are a waste of time more often than not.
- latchkey 7y agoRemember, meetings are what you make of them. If you can't find value in them, either change the topic to make them more valuable or don't have them at all. The retrospectives at Pivotal are actually quite fun. Usually involves optional booze and doesn't last for more than an hour. The goal is to make them about anything, not just talk about work. It is like an end of the week team building exercise. Think about it, most of us spend more time with these people in the office, then we do with own family. So, we might as well have an hour where we put down the phones and keyboards, reflect on how the week went, find things that can be improved, talk about life events or anything really. Find the positive aspects and focus on those as well as quench any negative things so that they don't carry onto the next week.
- vidarh 7y agoMaybe. But the point is that there isn't really that kind of sharp delineation, but a spectrum where you really can't assume that people talking about "sprints" means a fixed amount of work. The process you describe fits precisely within the Scrum framework; a key point of the retrospective in Scrum is not just to understand what has been delivered but what caused deviation from the estimate at the start and why. The assumption throughout is that the forecast from planning is just a forecast and that what will be delivered will pretty much never be exactly that. Maybe there are other things you do that does not match Scrum, but the above fits Scrum better than attempting to turn it into static/fixed releases - after all the entire point of pretty much all iterative development processes is the acknowledgement that we do not know how to precisely estimate software development with sufficient accuracy to create precise estimates for specific sets of tasks.
- latchkey 7y agoIf you want to put a name on it, Pivotal is just a type of scrum. They have their own sauce. I personally called it the Pivotal Process... but I'm probably the only one. At Pivotal, the forecast of what will be delivered changes all the time and it is tracked in a single tool that everyone can look at and keep up to date with (along with a few short meetings to keep everyone on the same page).
- twic 7y ago> They have their own sauce. I personally called it the Pivotal Process What Pivotal does is fairly vanilla Extreme Programming. Indeed, the vanillaness of it is something of a selling point. In the London office, we would start projects by giving client PMs and programmers a copy of Extreme Programming Explained and telling them that was what we were going to do. It's easier to coax them into following a process if it's a documented industry-standard one rather than some special sauce. Pivotal does have a few extra bells and whistles that fill in spaces around the XP core - "discovery and framing" [1] and "inception" [2] being two that spring to mind. And as you say, there is less emphasis on iterations as a unit of work - the planning meeting is weekly, but it feeds a continuous flow of development and delivery. But the daily pattern of work should be familiar to anyone who knows XP. [1] https://content.pivotal.io/blog/what-we-did-on-our-summer-internship-at-pivotal-discovery-and-framing https://content.pivotal.io/blog/what-we-did-on-our-summer-in... [2] https://www.infoq.com/articles/project-inception-meeting/ https://www.infoq.com/articles/project-inception-meeting/
- mlthoughts2018 7y agoI doubt it’s luck. In every place I’ve ever seen Agile in use, they treated 2-week sprints like you describe iterations. It was generally expected that portions of stories would roll into the following sprint and there was a high degree of trust and autonomy in letting teams organically decide if & when any stricter deadline needed to be imposed. One week sprints are also fine, but I’ve always found everyone hates them for doubling the number of planning / backlog / etc. “process” meetings. One month is often too infrequent for these meetings, one week is too frequent, so 2-week sprints appear from this sort of naturally. As long as you don’t conflate the timing of the sprint with the timing of work tasks (eg accept there are single work tasks that cannot be chopped up into two week incremental subtasks) this seems fine.
- latchkey 7y agoThe problem I've seen over and over again, and others have mentioned here in this great thread, is that when you have a 2 week sprint... if a feature misses the sprint, it is another 2 weeks before anyone sees anything... so now it is a month, which can be really unfortunate. It gets especially bad if there is a lot of fire fighting happening as well because someone might get pulled off that feature and now the time goes to infinite... The idea is to try to prevent that type of common delay.
- mlthoughts2018 7y agoThat’s not how I’ve seen it work anywhere. If you do 2 weeks of work and the feature is a few days away, the portion of work that continues into the following sprint is just a few days, and then you see it. Fire fighting is just as likely to prevent completion in one sprint as the other, so there is no net change in how the effects of context switching for firefighting slow progress. Of course, restructuring teams and work so that firefighting effects are reduced is always the goal, I’m just saying it doesn’t matter at all in terms of when the arbitrary cadence for syncing and planning are chosen.
- matwood 7y agoWe have tried 1, 2, and 4 week iterations. The problem with 1 week was that we didn't feel the planning and retro overhead was worthwhile for such a short amount of work time. 2 weeks was our sweet spot. 4 weeks was just too much time between larger re-orientations.
- latchkey 7y agoSounds more like a sprint than an iteration since iterations are 1 week. As I mentioned already in the thread, retros are not just about the work... it is a check in on what went good, meh, bad during the week. It can be about anything, not just work. The idea is to have one hour at the end of a week closeout team bonding where anything can get laid out on the table.
- matwood 7y agoYour iterations are 1 week. An iteration could be any length of time. And retros are exactly what you said. During our retros we have talked about iteration length multiple times and tried varying ones. In our retros everything is on the table for discussion, but it sounds like that's not the case at Pivotal.
- latchkey 7y ago'Your' is Pivotal. I'm just talking about how they do things and what I learned there. At Pivotal, an iteration is a week and it doesn't make any sense to make it longer than that. What would a longer than 1 week iteration really be? Are you making them longer only because you don't want as many retros? I said: "The idea is to have one hour at the end of a week closeout team bonding where anything can get laid out on the table." You said: "In our retros everything is on the table for discussion, but it sounds like that's not the case at Pivotal." There is a disconnect somewhere cause I'm pretty sure we are saying the same thing. =)
- twic 7y ago> At Pivotal, an iteration is a week and it doesn't make any sense to make it longer than that. It might. For example, if your team is distributed (eg development in the Pivotal office, infrastructure in the client office), you might prefer to have retros once every two weeks, rather than either drag the infrastructure people across town every week or have retros remotely. On some projects i anchored, we had planning meetings twice a week, because planning went more slowly, relative to development, than usual, due to complexity of features, multiple stakeholders, etc. We still had retros once a week. Was our iteration one week or half a week? The truth is that iterations don't really exist. You have planning meetings at some frequency. You have retros at some frequency. You have client liaison meetings at some frequency. You may have various other meetings at various other frequencies. Sometimes the frequencies are the same, but it doesn't mean anything.