3 ms·
> * The board was told that there were only 800 bugs, and yet the independent review found that there were more like 2000 If there were only 2000 bugs in a ful
by Aeolun 7y ago
> * The board was told that there were only 800 bugs, and yet the independent review found that there were more like 2000
If there were only 2000 bugs in a full bank migration, they were doing pretty well.
Our fairly small single page app is going on 300 now after some 5 weeks of testing.
- adjkant 7y agoIt sounds to me like there were 2000 reported bugs. You likely had better coverage due to smaller scope.
- koheripbal 7y agoThe number alone is meaningless. Some bugs are UX inconveniences, while others can destroy data, as we saw in this case. The real problem at these banks is the multitude of systems and datafeeds that impact systems downstream a hundred systems long. The real solution to these big project failures is, in my experience, the phase deployments. With the first step being retiring old systems and consolidating data repositories to reduce knock-on effects.
- Aeolun 7y agoI thought the same, but then figured the ratio is probably around the same.