3 ms·
Vancouver spent some $200m on a gated fare system. Fare evasion was 5%, or about $4m per year on the pre-existing ungated rail-portion of the system. And cert
by Scoundreller 7y ago
Vancouver spent some $200m on a gated fare system.
Fare evasion was 5%, or about $4m per year on the pre-existing ungated rail-portion of the system.
And certainly fare evasion didn't go to zero after the install.
Not a great ROI.