2 ms·
> with the rails literally 20ft below the street. A lot of this has to do with construction techniques. If you cut and cover, this is manageable. But when you
by Scoundreller 7y ago
> with the rails literally 20ft below the street.
A lot of this has to do with construction techniques. If you cut and cover, this is manageable.
But when you tunnel, you need to go as deep as you need to get tunnelable ground conditions.
If you're building on marsh (and I think Berlin largely is?), tunnelling may be totally impractical.
- keiferski 7y ago> If you're building on marsh (and I think Berlin largely is?) Yep: The name Berlin has its roots in the language of West Slavic inhabitants of the area of today's Berlin, and may be related to the Old Polabian stem berl-/birl- ("swamp"). https://en.wikipedia.org/wiki/Berlin https://en.wikipedia.org/wiki/Berlin