The only fossil fuel generators that ramp up and down quickly are the ones burning natural gas powering turbines. The rest is rather sluggish. And Nuclear is te
by jacquesm 7y ago
The only fossil fuel generators that ramp up and down quickly are the ones burning natural gas powering turbines. The rest is rather sluggish. And Nuclear is terrible at this too, especially at load shedding, which can cause a plant to be shut down after which it will take up to 72 hours to power back up.
- hansthehorse 7y agoUtilities generally use what is called spinning reserve. That is a plant, or a few plants, that are sitting at idle power with the turbine generator up to speed but may or may not be connected to the grid. The old coal and oil plants were good at this and could quickly meet peak demand. Gas is much better at it though. Nuclear is always base loaded as it's usually the cheapest kilowatt maker in the system. It's never taken me 72 hours to start the nuclear plant I worked at except after an outage where a valve lineup check of the entire plant is performed and mountains of paper work to do.
- jacquesm 7y agoYour practical knowledge obviously trumps my second hand one. The 72 hour figure came from a guy I knew that worked on the CL&P nukes in Pickering. We talked about it in the context of the cascading failure that caused the widespread grid outage, he said that 'once the nukes shut down we will be down for at least three days because that's how long it will take to bring them back up'.