Not sure. Did finishing in 1/10th time part of the contract? If not, then it we can think of the '10 times faster' claim to be bullshit which was only meant to
by buvanshak 8y ago
Not sure. Did finishing in 1/10th time part of the contract? If not, then it we can think of the '10 times faster' claim to be bullshit which was only meant to win the bid...
- Johnny555 8y agoBased on other transit tunneling projects, even if it just came in on time and on budget, that'd be a huge win.
- Dylan16807 8y agoThere's no advantage to promising more than needed to get the contract, and there's a big disadvantage in that projects universally tend to take too long, whether the tech is 10x better or not.