3 ms·
It was a good friend of mine that was 50/50 partner, but ended up choosing to work on another project instead. I was left with 80% of an MVP, so I hired a contr
by threesevens 9y ago
It was a good friend of mine that was 50/50 partner, but ended up choosing to work on another project instead. I was left with 80% of an MVP, so I hired a contractor out of pocket to finish up.
I'm a VP of Sales at a startup, and have done the design, product fit, and selling. Literally everything aside from coding.
- chasing 9y ago> ...MVP made for free from friends/contractor. > ...I hired a contractor out of pocket to finish up. ? Also, if your friend gave you 80% of an MVP without any compensation, watch out: You might not actually own that 80% of an MVP.