3 ms·
The quality control came last in the process, so when they 'finished' not long before the delivery date is due, QA gets a ton of political pressure to not make
by smallnamespace 10y ago
The quality control came last in the process, so when they 'finished' not long before the delivery date is due, QA gets a ton of political pressure to not make the date slip.
That's why test-driven design is valuable -- you iterate while testing.
- usaphp 10y agoWhat's the point of quality control then if it means nothing in that case?
- smallnamespace 10y agoMaking sure it doesn't burst into flames
- pbhjpbhj 10y ago... whilst it's still in warranty.